Availability of a Final Environmental Impact Statement To Consider Issuance of a Department of the Army Permit Pursuant to Section 404 of the Clean Water Act for Aluminum Company of America (Alcoa) Inc.'s Proposal To Construct and Operate Three Oaks Mine in Lee and Bastrop Counties, TX

Note: EPA no longer updates this information, but it may be useful as a reference or resource.


 [Federal Register: May 9, 2003 (Volume 68, Number 90)]
[Notices]
[Page 24959]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr09my03-67]

-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE
Department of the Army; Corps of Engineers
 
Availability of a Final Environmental Impact Statement To 
Consider Issuance of a Department of the Army Permit Pursuant to 
Section 404 of the Clean Water Act for Aluminum Company of America 
(Alcoa) Inc.'s Proposal To Construct and Operate Three Oaks Mine in Lee 
and Bastrop Counties, TX

AGENCY: Department of the Army, U.S. Army Corps of Engineers, DoD.
ACTION: Notice of availability.

-----------------------------------------------------------------------

SUMMARY: In accordance with the requirements of the National 
Environmental Policy Act (NEPA), the U.S. Army Corps of Engineers 
(USACE) Fort Worth District has prepared a Final Environmental Impact 
Statement (FEIS). This FEIS evaluates potential impacts to the natural, 
physical and human environment as a result of the proposed mining 
activities associated with Aluminum Company of America (Alcoa) Inc.'s 
proposed Three Oaks Mine. The USACE regulates this proposed project 
pursuant to Section 404 of the Clean Water Act. The proposed activity 
would involve the discharge of dredged and fill material into waters of 
the United States associated with the proposed construction and 
operation of a surface lignite mine. The document was prepared 
following a public review and 74-day comment period on the Draft 
Environmental Impact Statement (DEIS), during which time a public 
information meeting was held on October 1, 2002, and a public hearing 
was held on October 2, 2002. Both meetings were held in Elgin, Bastrop 
County, Texas.

DATES: Submit comments by June 23, 2003.

ADDRESSES: Send written comments and suggestions concerning this 
proposal to Ms. Jennifer Walker, Regulatory Project Manager, Regulatory 
Branch, CESWF-PER-R, U.S. Army Corps of Engineers, Fort Worth District, 
P.O. Box 17300, Fort Worth, TX 76102-0300 or via e-mail: 
3oakseis@swf02.usace.army.mil. Requests to be placed on the mailing 
list should also be sent to this address.

FOR FURTHER INFORMATION CONTACT: Ms. Jennifer Walker, Regulatory 
Project Manager at (817) 886-1733 or via e-mail: 
3oakseis@swf02.usace.army.mil.

SUPPLEMENTARY INFORMATION: Discharges of dredged or fill material into 
waters of the United States are regulated by the USACE under Section 
404 of the Clean Water Act. Alcoa must also address the proposed 
project's environmental impacts relative to other regulations including 
the Clean Air Act, other sections of the Clean Water Act, Endangered 
Species Act and the Fish and Wildlife Coordination Act. In accordance 
with NEPA, the FEIS evaluates practicable alternatives for the USACE's 
decision making process. As required by NEPA, the USACE also analyzes 
the ``no action'' alternative as a baseline for gauging potential 
impacts.
    Copies of the FEIS may be obtained by contacting USACE Fort Worth 
District Regulatory Branch at (817) 886-1731 or from Three Oaks Mine 
EIS link found at the bottom of the Fort Worth District USACE Internet 
home page at http://www.swf.usace.army.mil. Exit Disclaimer
    Copies of the FEIS are also available for inspection at the 
locations identified below:
    (1) Bastrop City Hall, 902 Main Street, Bastrop, TX 78602.
    (2) Lexington City Hall, PO Box 56, Lexington, TX 78947.
    (3) Austin City Hall, 124 West 8th Street, PO Box 1088, Austin, TX 
78767.
    (4) Rockdale City Hall, PO Box 586, Rockdale, TX 76567.
    (5) Elgin City Hall, PO Box 591, Elgin, TX 78621.
    (6) Giddings City Hall, 118 E. Richmond Street, Giddings, TX 78942.
    (7) Lee County Courthouse, PO Box 390, Giddings, TX 78942.
    (8) Milam County Courthouse, PO Box 1008, Cameron, TX 76520.
    (9) Bastrop County Courthouse, 804 Pecan Street, Bastrop, TX 78602.
    (10) Travis County Courthouse, 1000 Guadalupe Street, PO Box 1748, 
Austin, TX 78767.
    (11) City of Austin Library--Milwood Branch, 12500 Amherst Drive, 
Austin, TX 78727.
    (12) City of Austin Library--John Henry Faulk Branch, 800 
Guadalupe, Austin, TX 78701.
    (13) City of Austin Library--Will Hampton at Oak Hill Branch, 5125 
Convict Hill Road, Austin, TX 78749.
    (14) City of Bastrop Public Library, 1100 Church Street, Bastrop, 
TX 78602.
    (15) City of Elgin Public Library, 404 North Main Street, Elgin, TX 
78621.
    (16) City of Giddings Public Library, 177 South Madison Street, 
Giddings, TX 78942.
    (17) City of Rockdale Public Library, 201 Ackerman Street, 
Rockdale, TX 76567.
    The Record of Decision (ROD) will be signed no sooner than 45 days 
after publication of the notice of availability in the Federal Register 
by the U.S. Environmental Protection Agency.

Wayne A. Lea,
Chief, Regulatory Branch.
[FR Doc. 03-11149 Filed 5-8-03; 8:45 am]