Environmental Impact Statements; Notice of Availability
Note: EPA no longer updates this information, but it may be useful as a reference or resource.
[Federal Register: October 31, 2003 (Volume 68, Number 211)]
[Notices]
[Page 62072]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr31oc03-53]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6644-9]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or http://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed October 20, 2003 Through October 24, 2003
Pursuant to 40 CFR 1506.9.
EIS No. 030485, Final EIS, AFS, CA, Combined Array for Research in
Millimeter-wave Astronomy (CARMA) Project, Construction, Reconstruction
and Operation of 23 Antennas at the Juniper Flat Site, Special-Use-
Permit Issuance, Inyo Mountain, Inyo National Forest, Inyo County, CA,
Wait Period Ends: December 1, 2003, Contact: Jeffery E. Bailey (760)
873-2400.
EIS No. 030486, Draft EIS, AFS, CA, Larson Reforestation and Fuel
Reduction Project, Implementation, Stanislaus National Forest,
Groveland Ranger District, Mariposa and Tuolumne Counties, CA, Comment
Period Ends: December 15, 2003, Contact: Steve Marsh (209) 962-7825.
This document is available on the Internet at: http://www.r5.fs.fed.us/
stanislaus.
EIS No. 030487, Draft EIS, AFS, WY, Lost Cabin Mine Project,
Improvement of Historic Mining Road (Way 4170H) to Allow Motorized
Access to the Lost Mine for Mineral Exploration), Plan-of-Operation,
Medicine-Bow Routt National Forests and Thunder Basin National
Grassland, Carbon County, WY, Comment Period Ends: December 15, 2003,
Contact: Melissa Martin (307) 745-2371. This document is available on
the Internet at: http://www.fs.fed.us/mrnf.
EIS No. 030488, Draft EIS, AFS, WY, Wyoming Range Allotment Complex, To
Determine Whether or not to Allow Domestic Sheep Grazing, Bridger-Teton
National Forest, Big Piney, Greys River and Jackson Ranger Districts,
Sublette, Lincoln and Teton Counties, WY, Comment Period Ends: December
29, 2003, Contact: Greg Clark (307) 276-3375.
EIS No. 030489, Draft EIS, AFS, OR, Baked Apple Fire Salvage Project,
Salvaging Fire Killed Trees in the Matrix Portion of the 2002 Apple
Fire, Umpqua National Forest, Umpqua Ranger District, Douglas County,
OR, Comment Period Ends: December 15, 2003, Contact: Debbie Anderson
(541) 496-3532. This document is available on the Internet at:
http://www.fs.fed.us/r6/umpqua.
EIS No. 030490, Final EIS, BLM, CA, Santa Rosa and San Jacinto
Mountains National Monument Management Plan, Implementation, Public
Lands Management, Riverside County, CA, Wait Period Ends: December 1,
2003, Contact: Melissa Briston (760) 251-4817. This document is
available on the Internet at: http://www.ca.blm.gov/palmsprings.
EIS No. 030491, Final EIS, AFS, AL, Forest Health and Restoration
Project, Proposal to Determine the Desired Future Conditions of all
Existing Loblolly Pine Stands, National Forests in Alabama, Bankhead
National Forest, Winston, Lawrence and Franklin Counties, AL, Wait
Period Ends: December 1, 2003, Contact: John W. Creed (205) 489-5111.
EIS No. 030492, Final EIS, AFS, WI, Sunken Moose Project, Proposal to
Restore and/or Maintain the Red and White Pine Communities, Washurn
Ranger District, Chequamegon-Nicolet Forest, Bayfield County, WI, Wait
Period Ends: December 1, 2003, Contact: Ray Kiewit (715) 373-2667.
EIS No. 030493, Final EIS, FTA, TX, Northwest Corridor Light Rail
Transit (LRT) Line to Farmers Branch and Carrollton, Construction and
Operation, NPDES and U.S. Army COE Section 404 Permits Issuance, Dallas
Area Rapid Transit, Dallas and Denton Counties, TX, Wait Period Ends:
December 1, 2003, Contact: John Sweek (817) 975-0550.
EIS No. 030494, Final EIS, FTA, TX, Southeast Corridor Light Rail
Transit Project, Construction and Operation, Funding, NPDES Permit and
U.S. Army COE Section 404 Permit Issuance and, Mobility 2025 Plan
Update, Dallas Area Rapid Transit (DART), City of Dallas, Dallas
County, TX, Wait Period Ends: December 1, 2003, Contact: John Sweek
(817) 975-0550.
EIS No. 030495, Final EIS, NOA, Dolphin and Wahoo Fishery Management
Plan, Establishing Fishery Management Units, Stock Status Determination
and Harvesting Restrictions, Initial Regulatory Flexibility Analysis,
South Atlantic, Caribbean, and Gulf of Mexico, Wait Period Ends:
December 1, 2003, Contact: Roy E. Crabtree (727) 570-5301.
EIS No. 030496, Final EIS, AFS, ID, Twin Creek Timber Sale Project,
Proposal to Cut and Remove Lodgepole Pine Sawtimber, Road Construction/
Reconstruction, Montpelier Ranger District, Caribou National Forest,
U.S. Corps of Engineers Permit, Bear Lake County, ID, Wait Period Ends:
December 1, 2003, Contact: Jerry B. Reese (208) 624-3151.
Amended Notices
EIS No. 030453, Draft EIS, BLM, CA, Desert Southwest Transmission Line
Project, New Substation/Switching Station, Construction, Operation and
Maintenance, Right-of-Way Grant and US Army COE Section 10 and 404
Permits Issuance, North Palm Springs and Blythe, CA, Comment Period
Ends: January 8, 2004, Contact: John Kalish (760) 251-4849. Revision of
FR Notice Published on 10/10/2003: Correction to the Internet Address
should be: http://www.ca.blm.gov/palmsprings.
Also, CEQ Comment
Period Ending 11/17/2003 has been Extended to 01/08/2004.
Dated: October 28, 2003.
Joseph C. Montgomery,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 03-27474 Filed 10-30-03; 8:45 am]
BILLING CODE 6560-50-P
![[logo] US EPA](http://www.epa.gov/epafiles/images/logo_epaseal.gif)