Environmental Impact Statements; Notice of Availability
Note: EPA no longer updates this information, but it may be useful as a reference or resource.
[Federal Register: September 19, 2003 (Volume 68, Number 182)]
[Notices]
[Page 54900-54901]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr19se03-60]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
(ER-FRL-6643-9)
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or http://www.epa.gov/compliance/nepa.
Weekly receipt of Environmental Impact Statements
Filed September 08, 2003 Through September 12, 2003 Pursuant to 40 CFR
1506.9.
EIS No. 030416, Final EIS, APH, Importation of Solid Wood Packing
Material, To Exclude, Eradicate and/or Control Invasive Alien
Agricultural Pest, Implementation, United States, Wait Period Ends:
October 20, 2003, Contact: David A. Bergsten (301) 734-6103.
EIS No. 030417, Draft EIS, AFS, NM, Surface Management of Gas Leasing
and Development in the Carson National Forest, Implementation,
Jicarilla Ranger District, Rio Arriba County, NM, Comment Period Ends:
November 3, 2003, Contact: Tom Dwyer (505) 758-6272. This document is
available on the Internet at: http://www.fs.fed.us/r3/carson
.
EIS No. 030418, Draft EIS, AFS, MI, Baltimore Vegetative Management
Project, Implementation, Ottawa National Forest, Ontonagon Ranger
District, Ontonagon County, MI, Comment Period Ends: November 3, 2003,
Contact: Bruce Prud'homme (906) 884-2085.
EIS No. 030419, Draft EIS, AFS, NM, Magdelena Ridge Observatory
Project, Construct and Operate an Observatory in the Magdelena
Mountains, Cibola National Forest, Magdelena Ranger District, Socorro
County, NM, Comment Period Ends: November 3, 2003, Contact: Laura
Hudnell (505) 854-2281.
EIS No. 030420, Draft EIS, HHS, MD, Integrated Research Facility (IRF)
at Fort Detrick Construction and Operation, Adjacent to Existing U.S.
Army Medical Research Institute of Infectious Diseases Facilities, City
of Frederick, Frederick County, MD, Comment Period Ends: November 3,
2003, Contact: Ron Wilson (301) 496-5037.
EIS No. 030421, Final EIS, DOE, CA, Sacramento Area Voltage Support
Project, System Reliability and Voltage Support Improvements, Sierra
Nevada Region, Alameda, Contra Costa, Placer, Sacramento, San Joaquin
and Sutter Counties, CA, Wait Period Ends: October 20, 2003, Contact:
Loreen McMahon (916) 353-4460. This document is available on the
Internet at: http://www.wapa.gov
.
EIS No. 030422, Draft EIS, BPA, WA, BP Cherry Point Cogeneration
Project, To Build a 720-megawatt Gas-Fired Combined Cycle Cogeneration
Facility, Energy Facility Site Evaluation Council (EFSEC), Whatcom
County, WA, Comment Period Ends: November 3, 2003, Contact: Thomas C.
McKinney (503) 230-4749.
EIS No. 030423, Draft EIS, NOA, WA, CA, OR, Pacific Coast Groundfish
Fishery Management Plan (FMP) Amendment 16-2, Rebuilding Plans for:
Darkblotched Rockfish, Pacific Ocean Perch, Canary Rockfish, and
Lingcod, Maximum Sustainable Yield (MSY) Magnuson-Stevens Fishery
Conservation and Management Act, WA, OR, CA and Boundary of U.S. EEZ,
Comment Period Ends: November 3, 2003, Contact: D. Robert Lohn (206)
526-6150.
EIS No. 030424, Final EIS, BIA, CA, Jamul Indian Village (Tribe) 101
Acre Fee-to-Trust Transfer and Casino Project, Implementation, San
Diego County, CA, Wait Period Ends: November 3, 2003, Contact: William
Allan (916) 978-6043.
EIS No. 030425, Final EIS, EPA, AK, Pogo Gold Mine Project, Underground
Mine Construction and Operation, NPDES and U.S. Army COE Section 404
Permits Issuance, Goodpaster River Valley, Delta Junction, AK, Wait
Period Ends: October 20, 2003, Contact: Hanh Gold (206) 553-0171.
Amended Notices
EIS No. 030367, Draft EIS, IBR, CA, Freeport Regional Water Project, To
Construct and Operate a Water Supply Project to Meet Regional Water
Supply Needs, Sacramento County Water Agency (SCWA) and the East Bay
Municipal Utility District (EBMUD), Alameda, Contra Costa, San Joaquin,
Sacramento Counties, CA, Comment Period Ends: October 7, 2003, Contact:
Rod Schroeder (916) 989-7274. Revision of FR Notice Published on 8/15/
2003: CEQ Comment Period Ending 9/29/2003 has been Extended to 10/7/
2003.
EIS No. 030394, Draft Supplement, NOA, MA, ME, RI, NH, CT, Northeast
Multispecies Fishery Management
[[Page 54901]]
Plan, Amendment 13, New Information concerning Management Alternatives
and Impact Analysis, Adoption, Approval and Implementation, New England
Management Council, ME, HH, VT, MA, RI, CT, NY, NJ, DE, MD, VA and NC,
Comment Period Ends: October 15, 2003, Contact: Paul Howard (978) 465-
0492. Revision of FR Notice Published on 8/29/2003: Title Correction.
EIS No. 030411, Final EIS, FHW, WY, Wyoming Forest Highway 4 U.S. 212
(KP 39.5 to KP 69.4) the Beartooth Highway, A Portion Proposed for
Reconstruction begins 7.1 miles east of the Junction of WY-296 (Chief
Joseph Highway) and Proceeds East for 18.6 miles to the Wyoming/Montana
State Line, Park County, WY, Wait Period Ends: October 14, 2003,
Contact: Jennifer Corwin (303) 716-2097. Revision of FR Notice
Published on 9/12/2003: Correction to Telephone Number.
Dated: September 16, 2003.
Joseph C. Montgomery,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 03-24001 Filed 9-18-03; 8:45 am]
BILLING CODE 6560-50-P
![[logo] US EPA](http://www.epa.gov/epafiles/images/logo_epaseal.gif)