Jump to main content.


Environmental Impact Statements; Notice of Availability

Note: EPA no longer updates this information, but it may be useful as a reference or resource.


 [Federal Register: December 23, 2004 (Volume 69, Number 246)]
[Notices]
[Page 76942]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr23de04-67]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6658-8]
 
Environmental Impact Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7167 or http://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements
Filed December 13, 2004 Through December 17, 2004
Pursuant to 40 CFR 1506.9.
EIS No. 040584, Final EIS, BLM, NV, Las Vegas Valley Disposal Boundary 
Project, Disposal and Use of Public Land under the Management of (BLM), 
Implementation, Clark County, NV, Wait Period Ends: January 24, 2005, 
Contact: Mark Morse (702) 515-5220.

    This document is available on the Internet at: 
http://www.nv.blm.gov/lvdiseis.

EIS No. 040585, Draft EIS, FHW, NE, Bellevue Bridge Study, To Improve 
Connectivity between the Omaha Metropolitan Area and across the 
Missouri River from U.S. 75 to I-29, Coast Guard Permit, NPDES Permit, 
U.S. Army COE Section 10 and 404 Permits, Mills County, IA and Sarpy 
County, NE, Comment Period Ends: February 28, 2005, Contact: Philip 
Barnes (515) 233-7300.

EIS No. 040586, Draft EIS, FHW, WA, WA-28 Eastside Corridor Project, 
Proposal to Improve WA-28 (Sunset Highway) Corridor from WA-2-97 
(Ocdabashian Bridge) to 9th Street N.E. in East Wenatchee, City of East 
Wenatchee, Douglas County, WA, Comment Period Ends: February 27, 2005, 
Contact: Steve Saxton (360) 753-9411.

    This document is available on the Internet at: 
http://www.wsdot.wa.gov/Projects/SR28WenatcheeEastsideCorridor/. Exit Disclaimer

EIS No. 040587, Final EIS, DHS, MD, National Biodefense Analysis and 
Countermeasures Center (NBACC) Facility at Fort Detrick, Construction 
and Operation, Fort Detrick, Frederick County, MD, Wait Period Ends: 
January 24, 2005, Contact: Kevin Anderson (301) 846-2156.

EIS No. 040588, Draft EIS, FHW, IA, NE, Council Bluffs Interstate 
System Improvements Project, Transportation Improve from Missouri River 
on I-80 to East of the I-480 Interchange, (Tier 1), Pottawattamie 
County, IA and Douglas County, NE, Comment Period Ends: February 28, 
2005, Contact: Philip Barnes (515) 233-7300.

EIS No. 040589, Final Supplement, AFS, AK, Kensington Gold Project, 
Proposed Modifications of the 1998 Approved Plan Operation, NPDES, ESA 
and U.S. COE Section 10 and 404 Permits, Tongass National Forest, City 
of Juneau, AK, Wait Period Ends: January 24, 2005, Contact: Jeff 
Defreest (907) 790-7407.

EIS No. 040590, Draft EIS, AFS, WA, White Pass Expansion Master 
Development Plan, Implementation, Naches Ranger District, Okanogan-
Wenatchee National Forests and Cowwlitz Valley Ranger District, Gifford 
Pinchot National Forest, Yakima and Lewis County, WA , Comment Period 
Ends: February 22, 2005, Contact: Randy Shepard (509) 653-1400.

EIS No. 040591, Draft EIS, FRC, TX, Vista del Sol Liquefield Natural 
Gas (LNG) Terminal Project, Construct, Install and Operate an LNG 
Terminal and Natural Gas Pipeline Facilities, Vista del Sol LNG 
Terminal LP and Vista del Sol Pipeline LP, TX, Comment Period Ends: 
February 7, 2005, Contact: Thomas Russo (202) 502-8004.
EIS No. 040592, Final EIS, SFW, CO, Rocky Flats National Wildlife 
Refuge Comprehensive Conservation Plan, 15-Year Guidance for Management 
of Refuge Operations, Habitat Restoration and Visitor Services, 
Implementation, Jefferson and Boulder Counties, CO, Wait Period Ends: 
January 24, 2005, Contact: Laurie Shannon (303) 289-0151.
EIS No. 040593, Draft EIS, AFS, CO, County Line Vegetation Management 
Project, Salvaging Spruce Beetle Infected Trees and Thinning Spruce-Fir 
Stand, Rio Grande National Forest, Conejos Peak Ranger District, 
Conejos County, CO, Comment Period Ends: February 7, 2005, Contact: 
John Murphy (719) 852-5941.
EIS No. 040594, Final EIS, FTA, VA, Dulles Corridor Rapid Transit 
Project, High-Quality and High-Capacity Transit Service in the Dulles 
Corridor, West Falls Church Metrorail Station in Fairfax County to the 
Vicinity of Route 772 in Loudoun County, VA, Wait Period Ends: January 
24, 2005, Contact: Patricia Kampf (215) 656-7100.

Amended Notices

EIS No. 040505, Draft EIS, USA, Battle Area Complex (BAX) and a 
Combined Arms Collective Training Facility (CACTF) Construction and 
Operation, U.S. Army Training Lands in Alaska, Comment Period Ends: 
January 10, 2005, Contact: Kevin Gardner (907) 384-3331. Revision of FR 
Notice Published on 11/05/04: CEQ Comment Period Ending 12/20/2004 has 
been Extended to 01/10/2005.
EIS No. 040557, Draft EIS, AFS, AK, Tuxekan Island Timber Sale(s) 
Project, Harvesting Timber, Coast Guard Bridge Permit and U.S. Army COE 
Section 10 and 404 Permits, Tongass National Forest, Thorne Bay Ranger 
District, Thorne Bay, AK, Comment Period Ends: January 24, 2005, 
Contact: Forrest Cole (907) 228-6200. Revision of FR Notice Published 
on 12/10/2004: Correction to Contact Person Telephone Number.

    Dated: December 20, 2004.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 04-28097 Filed 12-22-04; 8:45 am]
BILLING CODE 6560-50-P 

 
 


Local Navigation


Jump to main content.