United States Section; Notice of Availability (NOA) of the Draft Supplemental Environmental Impact Statement (DSEIS) for Clean Water Act (CWA) Compliance at the South Bay International Wastewater Treatment Plant (SBIWTP), San Diego, California
Note: EPA no longer updates this information, but it may be useful as a reference or resource.
[Federal Register: December 30, 2004 (Volume 69, Number 250)]
[Notices]
[Page 78483-78484]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr30de04-106]
=======================================================================
-----------------------------------------------------------------------
INTERNATIONAL BOUNDARY AND WATER COMMISSION, UNITED STATES AND MEXICO
United States Section; Notice of Availability (NOA) of the Draft
Supplemental Environmental Impact Statement (DSEIS) for Clean Water Act
(CWA) Compliance at the South Bay International Wastewater Treatment
Plant (SBIWTP), San Diego, California
AGENCY: United States Section, International Boundary and Water
Commission (USIBWC).
ACTION: Notice of Availability.
-----------------------------------------------------------------------
SUMMARY: This announces the availability of the DSEIS that assesses the
potential environmental impacts of the construction and operation of a
range of treatment and disposal alternatives for the SBIWTP to achieve
compliance with the CWA. Situated in the United States at the United
States/Mexico border, the SBIWTP treats sewage flows originating from
the City of Tijuana, Mexico and the surrounding region and discharges
into the Pacific Ocean through an ocean outfall. The DSEIS considers
existing and new alternatives that would enable the USIBWC to bring the
SBIWTP into compliance with the CWA and the requirements contained in
its National Pollutant Discharge Elimination System (NPDES) permit and
to evaluate new information on the current discharges of advanced
primary effluent from the SBIWTP through the South Bay Ocean Outfall
(SBOO), as well as interim actions that would continue operations of
the SBIWTP until the SBIWTP achieves CWA compliance. The United States
Environmental Protection Agency (USEPA), Region 9, San Francisco,
California, is a Cooperating Agency for this action.
DATES: Written comments are requested by February 28, 2005. The public
comment period of the DSEIS will end 60 days after publication of the
NOA in the Federal Register.
Public Hearing: A public hearing regarding the findings of the
DSEIS and to take comments on the DSEIS will be held at 6:30 pm on
Wednesday, February 2, 2005 at the San Ysidro Middle School
(Auditorium), 4345 Otay Mesa Road, San Diego.
ADDRESSES: Written comments (no e-mails or faxes) must be addressed to:
Mr. Daniel Borunda, Environmental Protection Specialist, Compliance
Section, USIBWC, 4171 North Mesa Street, C-100, El Paso, Texas 79902. A
copy of the DSEIS is available at http://www.ibwc.state.gov
and in local public libraries in the San Diego area. A
[[Page 78484]]
limited number of copies will be available, if you wish to obtain a
copy contact Mr. Daniel Borunda at the address above.
FOR FURTHER INFORMATION CONTACT: Mr. Daniel Borunda, Environmental
Protection Specialist, USIBWC, at (915) 832-4701, by fax at (915) 832-
4167, or by mail at the above listed address.
SUPPLEMENTARY INFORMATION: Pursuant to Section 102(2)(c) of the
National Environmental Policy Act of 1969, as amended, the USIBWC has
analyzed the impacts of alternatives for SBIWTP to achieve compliance
with the CWA and its NPDES permit. This action is needed because the
SBIWTP currently operates and discharges only at the advanced primary
level and cannot meet all the requirements of the CWA and its NPDES
permit, including secondary treatment requirements.
This DSEIS also evaluates new information on the current discharges
of advanced primary effluent from the SBIWTP through the SBOO, as well
as treatment and disposal options in Mexico to achieve CWA compliance.
The No Action Alternative and six action alternatives are evaluated
in the DSEIS. The alternatives were developed in a manner that would
enable wastewater flows to be treated in compliance with the CWA and
the SBIWTP NPDES permit. Alternatives formulation was the result of a
public consultation process that included the public, regulatory
agencies and environmental organizations.
This DSEIS evaluates the following seven alternatives:
1. Alternative 1: No Action (Continue operation of SBIWTP as
Advanced Primary Facility).
? Option A: With No Future Improvements to Mexico's Existing
Conveyance Facilities
? Option B: With Future Improvements to Mexico's Existing
Conveyance Facilities
2. Alternative 2: Operate SBIWTP as Advanced Primary Facility With
Treated Flows Conveyed to Mexico for Discharge.
3. Alternative 3: Operate SBIWTP With City of San Diego Connections
(Interim Alternative Only).
4. Alternative 4: Implementation of Public Law 106B457, Secondary
Treatment Facility in Mexico.
? Treatment Option A: Operation of SBIWTP as Advanced
Primary Facility, Secondary Treatment in Mexico
? Treatment Option B: Cease Operation of SBIWTP, Secondary
Treatment in Mexico
? Treatment Option C: Bajagua LLC, Proposal--Operation of
SBIWTP as Advanced Primary Facility, Secondary Treatment in Mexico
? Discharge Option I: Treated Effluent Discharged in United
States via SBOO
? Discharge Option II: Treated Effluent Discharged in Mexico
at Punta Bandera
5. Alternative 5: Secondary Treatment in the United States at SBIWTP.
? Treatment Option A: Completely Mixed Aeration (CMA) Ponds at SBIWTP
? Treatment Options B-1 and B-2: Activated Sludge Secondary
Treatment at SBIWTP
6. Alternative 6: Secondary Treatment in the U.S. and in Mexico.
7. Alternative 7: SBIWTP Closure/Shutdown.
The USIBWC has identified Alternative 4, Treatment Option C as the
preferred alternative in the DSEIS. The USIBWC will consider comments
on the DSEIS to make a final selection of the preferred alternative.
Background
The original Draft EIS for the SBIWTP project (1991) proposed the
construction of a secondary treatment facility in San Diego to achieve
secondary treatment using an activated sludge technology. Based on a
1994 Final EIS and Record of Decision (ROD), the USIBWC and the USEPA
approved the construction of the SBIWTP and the connecting SBOO. The
SBIWTP is on a 75-acre site in south San Diego County, California, just
west of San Ysidro near the intersection of Dairy Mart and Monument
roads. Treated effluent is discharged to the Pacific Ocean through the
SBOO, a 4.5-mile long piping system completed in January 1999. This
outfall extends about 3.5 miles offshore.
Pursuant to the completion of an Interim Operations Supplemental
EIS in 1996, the USIBWC and USEPA decided to operate the SBIWTP as an
advanced primary treatment facility before completion of the necessary
secondary facilities. This decision would expedite the treatment of up
to 25 mgd of untreated sewage from Tijuana that would otherwise have
continued to pollute the Tijuana River and Estuary, as well as coastal
waters in the United States.
Before the SBOO was completed in January 1999, advanced primary
treated effluent was discharged through an emergency connection to the
City of San Diego Point Loma Wastewater Treatment Plant. The emergency
connection was used daily in the late 1980s and 1990s, but it has not
been used in this manner since the SBIWTP started discharging to the
completed SBOO in January 1999.
After the release of the May 1994 Final EIS and ROD and the 1996
decision regarding interim operation, significant additional
information became available and changed circumstances warranted
reconsidering the best means to complete the SBIWTP secondary treatment
facilities. The USIBWC and USEPA decided to prepare a Supplemental EIS
to examine new information as a settlement to a lawsuit that challenged
the 1994 Final EIS.
In January 1998, the USIBWC and the USEPA issued the Draft Long
Term Treatment Options Supplemental EIS to re-evaluate the SBIWTP
secondary treatment options. In October 1998, the agencies issued a
supplement to the 1996 Interim Operation Supplemental EIS that
addressed impacts of the advanced primary treatment. This supplement
disclosed new information about the presence of dioxins and acute
toxicity in the advanced primary discharge. This new information was
incorporated into the Final Long Term Treatment Options Supplemental
EIS released in March 1999.
In the 1999 ROD for the Long Term Treatment Options Supplemental
EIS, the USEPA and the USIBWC selected the CMA pond system at the Hofer
property as the long-term option for secondary treating 25 mgd of
wastewater at the SBIWTP. However, Congress did not fund the
construction of these secondary treatment facilities and the plant has
continued to provide advanced primary treatment only.
The specific purpose of the current analysis is to determine the
environmental impacts of the alternatives that could accomplish
compliance with the CWA and the SBIWTP NPDES permit. A decision on
which of the alternatives will be implemented in order to achieve
compliance with the CWA will be made by the USIBWC through a process
that will consider a wide range of factors. The factors include, but
are not limited to, environmental considerations, laws and regulations,
implications for compliance with the CWA, the SBIWTP NPDES permit,
budget considerations, schedule and public concerns.
A copy of the DSEIS has been filed with the USEPA in accordance
with 40 CFR parts 1500-1508 and USIBWC procedures. Written comments
concerning the DSEIS will be accepted at the address above until
February 28, 2005.
Dated: December 21, 2004.
Susan E. Daniel,
General Counsel.
[FR Doc. 04-28378 Filed 12-29-04; 8:45 am]
BILLING CODE 4710-03-P
![[logo] US EPA](http://www.epa.gov/epafiles/images/logo_epaseal.gif)