Jump to main content.


Environmental Impact Statements; Notice of Availability

Note: EPA no longer updates this information, but it may be useful as a reference or resource.


 [Federal Register: June 25, 2004 (Volume 69, Number 122)]
[Notices]
[Page 35597-35598]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr25jn04-74]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6652-8]

Environmental Impact Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7167 or http://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed June 14, 2004 Through June 18, 2004
Pursuant to 40 CFR 1506.9.
EIS No. 040281, Final EIS, EPA, SC, Port Royal Ocean Dredged Material 
Disposal Site (ODMDS), Designation, SC, Wait Period Ends: July 26, 
2004, Contact: Wesley B. Crum (404) 562-9352.
EIS No. 040282, Draft Supplement, BLM, NV, Pipeline/South Pipeline Pit 
Expansion Project, Updated Information on Modifying the Extending Plan 
of Operations (Plan), Gold Acres Mining District, Launder County, NV, 
Comment Period Ends: August 9, 2004, Contact: Pam Jarnecke (775) 635-
4144.
EIS No. 040283, Final EIS, JUS, TX, Rio Grande Operation Project, 
Reduction or Elimination of Illegal Drug Activities and Illegal 
Immigrants, Starr, Hidalgo and Cameron Counties, TX, Wait Period Ends: 
July 26, 2004, Contact: Dr. Terrell Roberts (409) 766-3035.

[[Page 35598]]

EIS No. 040284, Draft EIS, COE, AK, Unalaska Navigation Improvements 
Project, Construction of Harbor on Amaknak Island in Aleutian Island 
Chain, Locally known as ``Little South America, Integrated Feasibility 
Report, Aleutian Island, AK, Comment Period Ends: August 9, 2004, 
Contact: Guy McConnell (907) 753-2614.
EIS No. 040285, Final EIS, FHW, OR, Pioneer Mountain to Eddyville 
Project on U.S. 20, Corvallis-Newport Highway Improvements, Funding, 
Right-of-Way Grant and U.S. Army COE Section 404 Permit Issuance, 
Lincoln County, OR, Wait Period Ends: July 26, 2004, Contact: Elton 
Chang (503) 587-4710.
EIS No. 040286, Final EIS, AFS, ID, WY, EastBridge Cattle Allotment 
Management Plan Revision (AMP), Authorization of Continued Grazing, 
Caribou-Targhee National Forest, Soda Springs Ranger District, Caribou 
and Bonneville County, ID and Lincoln County, WY, Wait Period Ends: 
July 26, 2004, Contact: Victor Bradfield (208) 547-4356.
EIS No. 040287, Draft EIS, NOA, FL, Programmatic EIS--Seagrass 
Restoration in the Florida Keys National Marine Sanctuary, 
Implementation, US Army COE Section 404 and CZMA Permits, Monroe 
County, FL, Comment Period Ends: August 9, 2004, Contact: Harriet 
Sopher Ext. 109 (301) 713-3125. This document is available on the 
Internet at: http://www.sanctuaries.noaa.gov/library/library.html Exit Disclaimer
EIS No. 040288, Draft EIS, FHW, UT, Iron County Transportation 
Corridors, Construction from Station Road 56 to Exit 51 on Interstate 
15, Funding and Right-of-Way Grant, Southwest of the Cedar City, Iron 
County, UT, Comment Period Ends: August 9, 2004, Contact: Gregory 
Penske (801) 963-0078.
EIS No. 040289, Final EIS, AFS, UT, WY, East Fork Fire Salvage Project 
Timber Harvesting of Dead and Dying Trees, Implementation, Wasatch-
Cache National Forest, Evanston Ranger District, Summit County, UT, 
Wait Period Ends: July 26, 2004, Contact: Larry Johnson (307) 789-3194. 
This document is available on the Internet at: 
http://www.fs.fed.us/r4/wcnf/projects. Exit Disclaimer
EIS No. 040290, Draft EIS, AFS, MT, Robert-Wedge Post-Fire Project, 
Salvage Trees and Rehabilitate Lands, Flathead National Forest, Glacier 
View Ranger District, Flathead County, MT, Comment Period Ends: August 
9, 2004, Contact: Kathy Ramirez (208) 331-5908.
EIS No. 040291, Draft EIS, CGD, LA, Gulf Landing LLC Deepwater Port 
License Application for Construct of Deepwater Port and Associated 
Anchorages in the Gulf of Mexico, South of Cameron, LA, Comment Period 
Ends: August 9, 2004, Contact: Mark Prescott (202) 267-0225. This 
document is available on the Internet at: http//dms.dot.gov.
EIS No. 040292, Draft EIS, FHW, MT, US-2 Highway Corridor Improvement 
Project, Reconstruction between Havre to Fort Belknap to Replace the 
Aging US-2 Facility, U.S. Army COE Section 404 Permit, Hill and Blaine 
Counties, MT, Comment Period Ends: August 13, 2004, Contact: Dale W. 
Paulson Ext 239 (406) 449-5302.
EIS No. 040293, Final EIS, AFS, MT, West Troy Project, Proposes Timber 
Harvesting, Natural Fuels Reduction Treatments, Pre-Commercial 
Thinning, and Watershed Rehabilitation (Decommissioning) Work, Kootenai 
National Forest, Three River Ranger District, Lincoln County, MT, Wait 
Period Ends: July 26, 2004, Contact: Kathy Mohar (206) 295-4693.
EIS No. 040294, Final EIS, NOA, TX, MS, FL, LA, AL, Generic Essential 
Fish Habitat Amendment to the Fishery Management Plans of the Gulf of 
Mexico (GOM) for Shrimp, Red Drum, Reef Fish, Stone Crab, Coral and 
Coral Reef, Spiny Lobster Fisheries of the GOM and South Atlantic 
Coastal Migratory Pelagic Resources of the Gulf of Mexico and South 
Atlantic, Wait Period Ends: July 26, 2004, Contact: Roy E. Crabtree 
(727) 570-5301.
EIS No. 040295, Final EIS, USN, CA, Military Family Housing (MFH) in 
the San Diego Region, Construction of 1,600 MFH Units, Three MFH Sites 
are Located in the Marine Corps Air Station (MCAS), Miramar in the City 
of San Diego, San Diego County, CA, Wait Period Ends: July 26, 2004, 
Contact: Sheila Donovan (619) 532-2518.

    Dated: June 22, 2004.
Ken Mittelholtz,
Environmental Protection Specialist, Office of Federal Activities.
[FR Doc. 04-14466 Filed 6-24-04; 8:45 am]
BILLING CODE 6560-50-P 

 
 


Local Navigation


Jump to main content.