Environmental Impact Statements and Regulations; Availability of EPA Comments
Note: EPA no longer updates this information, but it may be useful as a reference or resource.
[Federal Register: November 12, 2004 (Volume 69, Number 218)]
[Notices]
[Page 65426]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr12no04-50]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6657-6]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared pursuant to the Environmental
Review Process (ERP), under Section 309 of the Clean Air Act and
Section 102(2)(c) of the National Environmental Policy Act, as amended.
Requests for copies of EPA comments can be directed to the Office of
Federal Activities at (202) 564-7167.
An explanation of the ratings assigned to draft environmental
impact statements (EISs) was published in FR dated April 02, 2004 (69
FR 17403).
Draft EISs
ERP No. D-AFS-G65094-NM Rating LO, Ojo Caliente Proposed
Transmission Line, Authorization for Construction, Operation, and
Maintenance of a New 115kV Transmission Line and Substation, Carson
National Forest and BLM Taos Field Office, Taos and Rio Arriba
Counties, NM.
Summary: EPA has no objection to the selection of the preferred
Alternative D with options. ERP No. D-AFS-J65424-MT Rating EC2,
Fishtrap Project, Proposed Timber Harvest, Prescribed Burning Road
Construction and Other Restoration Activities, Lolo National Forest,
Plains/Thompson Falls Ranger District, Sanders County, MT.
Summary: EPA supports Alternative 2 and it's potential to improve
water quality, reduce road density and decrease habitat fragmentation
in the long-term. However, EPA expressed concerns about the short-term
impacts of increased sedimentation on water quality and bull trout. EPA
recommend earlier implementation of road BMP improvements and road
restoration relative to timber harvest and road construction, and
additional road closure and decommissioning in the Upper Fishtrap drainage.
ERP No. D-DHS-D11036-MD Rating EC2, National Biodefense Analysis
and Countermeasures Center (NBACC) Facility at Fort Detrick,
Construction and Operation, Fort Detrick, Frederick County, MD.
Summary: EPA is concerned with the fracture trace located directly
on the proposed project site and the potential impacts to groundwater.
Final EISs
ERP No. F-AFS-K65263-CA Meteor Project, Proposal for Harvesting
Timber and Conducting Associated Activities on 744 Acres,
Implementation, Klamath National Forest, Salmon River Ranger District,
Siskiyou County, CA.
Summary: The Final EIS addressed EPA's concerns and no formal
comments were sent to the preparing agency.
Dated: November 8, 2004.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 04-25202 Filed 11-10-04; 8:45 am]
BILLING CODE 6560-50-P