Environmental Impact Statements; Notice of Availability
Note: EPA no longer updates this information, but it may be useful as a reference or resource.
[Federal Register: October 29, 2004 (Volume 69, Number 209)]
[Notices]
[Page 63147]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr29oc04-60]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6657-1]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or http://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed October 18, 2004 Through October 22, 2004
Pursuant to 40 CFR 1506.9.
EIS No. 040495, FINAL EIS, AFS, MT, Fortine Project, To Implement
Vegetation Management, Timber Harvest and Fuel Reduction Activities,
Kootenai National Forest, Fortine Ranger District, Lincoln County, MT,
Wait Period Ends: November 29, 2004, Contact: Joleen Dunham (406) 882-
4451.
EIS No. 040496, DRAFT SUPPLEMENT, FHW, NC, Eastern Section of the
Winston-Salem Northern Beltway, U.S. 52 south to I-40 Business and I-40
Business south to U.S. 311, Improvements to the Surface Transportation
Network, TIP Project Nos. U-2579 and U-2579A, Forsyth County, NC,
Comment Period Ends: January 5, 2005, Contact: John F. Sullivan, III,
P.E. (919) 856-4346.
EIS No. 040497, FINAL SUPPLEMENT, FHW, NC, Western Section of the
Winston-Salem Northern Beltway, U.S. 158 north to U.S. 52, TIP Nos. R-
2247, Forsyth County, NC, Wait Period Ends: November 29, 2004, Contact:
John F. Sullivan, III, P. (919) 856-4346.
EIS No. 040498, FINAL EIS, AFS, UT, Wasatch Powerbird Guides Permit
Renewal, Authorization to Continue Providing Guided Helicopter Skiing
Activities on National Forest System (NFS) Land on the Wasatch-Cache
and Uinta National Forests, Special-Use Permit (SUP), Provo and Salt
Lake City, UT, Wait Period Ends: November 29, 2004, Contact: Steve
Scheid (801) 733-2689. This document is available on the Internet at:
http://www.fs.fed.us/r4/wcnf/projects/decision/wpg.
EIS No. 040499, FINAL EIS, COE, AK, Unalaska Navigation Improvements
Project, Construction of Harbor on Amaknak Island in Aleutian Island
Chain, Locally known as ``Little South America, Integrated Feasibility
Report, Aleutian Island, AK, Wait Period Ends: November 29, 2004,
Contact: Guy McConnell (907) 753-2614.
EIS No. 040500, DRAFT EIS, FHW, UT, Brown Park Road Project,
Reconstruction (Paving) and Partial Re-alignment from Red Creek to
Colorado State Line, Diamond Mountain Resource Management Plan
Amendment (BLM), U.S. Army COE Section 404 Permit, Daggett County, UT,
Comment Period Ends: December 17, 2004, Contact: Gregory S. Punske,
P.E. (801) 963-0182.
EIS No. 040501, FINAL EIS, COE, CA, Hamilton City Flood Damage
Reduction and Ecosystem Restoration, Propose to Increase Flood
Protection and Restore the Ecosystem, Sacramento River, Glenn County,
CA Wait Period Ends: November 29, 2004, Contact: Alicia Kirchner (916)
557-6767.
EIS No. 040502, FINAL EIS, FHW, CT, CT-2/2A/32, Transportation
Improvement Study, Construction, Funding, Coast Guard Bridge Permit,
NPDES Permit, COE Section 10 and 404 Permit, New London County, CT,
Wait Period Ends: November 29, 2004, Contact: Bradley Keazer (860) 659-
6703.
EIS No. 040503, FINAL EIS, COE, CA, Matilija Dam Ecosystem Restoration
Feasibility Study, Restoring Anadromous Fish Populations, Matilija
Creek, Ventura River, Ventura County Watershed Protection District,
Ventura County, CA, Wait Period Ends: November 29, 2004, Contact: Chris
Serjack (213) 452-3865.
Dated: October 26, 2004.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 04-24252 Filed 10-28-04; 8:45 am]
BILLING CODE 6560-50-P
![[logo] US EPA](http://www.epa.gov/epafiles/images/logo_epaseal.gif)