Environmental Impact Statements and Regulations; Availability of EPA Comments
Note: EPA no longer updates this information, but it may be useful as a reference or resource.
[Federal Register: August 12, 2005 (Volume 70, Number 155)]
[Notices]
[Page 47198-47199]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr12au05-70]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6666-4]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared pursuant to the Environmental
Review Process (ERP), under section 309 of the Clean Air Act and
Section 102(2)(c) of the National Environmental Policy Act as amended.
Requests for copies of EPA comments can be directed to the Office of
Federal Activities at 202-564-7167. An explanation of the ratings
assigned to draft environmental impact statements (EISs) was published
in FR dated April 1, 2005 (70 FR 16815).
[[Page 47199]]
Draft EISs
EIS No. 20050262, ERP No. D-FHW-D40333-DC, Klingle Road Reconstruction
Project, Reconstructing for Vehicular and Recreational Uses, Between
Porter Street, NW., and Cortland Place, NW., Funding, Washington, DC
Summary: EPA has environmental concerns about the proposed project
related to hazardous materials, specifically possible lead
contamination of Klingle Creek, as well as noise impacts and the
sufficient delineation of flood hazards. Rating EC2.
Final EISs
EIS No. 20050208, ERP No. F-AFS-65381-SD, Sioux Ranger District Oil and
Gas Leasing Project, Implementation, Sioux Ranger District, Custer
National, Harding County, SD
Summary: No formal comment letter was sent to the preparing agency.
EIS No. 20050233, ERP No. F-FHW-F40420-MI, I-75 from M-102 to M-59
Proposed Widening and Reconstruction, Transportation Improvements,
Funding, NPDES Permit and U.S. Army COE Section 404 Permit, Oakland
County, MI
Summary: EPA has no objections to the preferred alternative.
EIS No. 20050252, ERP No. F-NPS-J61105-CO, Colorado National Monument
General Management Plan, Implementation, Mesa County, CO
Summary: EPA's major concerns have been addressed in the final EIS;
therefore, EPA has no objections to the proposed action.
EIS No. 20050277, ERP No. F-FHW-H40172-MO, U.S. Route 67 Corridor
Project, Improvements from south of Fredericktown to south of
Neelyville, Madison, Wayne and Butler Counties, MO
Summary: EPA has no objections to the preferred alternative.
EIS No. 20050282, ERP No. F-FHW-F40424-OH, U.S. 33 Nelsonville Bypass
Project, To Upgrade Existing Four-Lane Controlled Access Expressway
between Haydenville in Hocking County and New Floodwood in Hocking and
Athens Counties, OH
Summary: EPA has no objections to the proposed project and
preferred alternative.
Dated: August 9, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 05-16035 Filed 8-11-05; 8:45 am]
BILLING CODE 6560-50-P