Transcontinental Gas Pipe Line Corporation; Notice of Intent To Prepare an Environmental Assessment for the Proposed Station 170 Clean Air Modifications Project and Request for Comments on Environmental Issues
Note: EPA no longer updates this information, but it may be useful as a reference or resource.
[Federal Register: January 4, 2005 (Volume 70, Number 2)]
[Notices]
[Page 354-356]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr04ja05-42]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP05-37-000]
Transcontinental Gas Pipe Line Corporation; Notice of Intent To Prepare
an Environmental Assessment for the Proposed Station 170 Clean Air
Modifications Project and Request for Comments on Environmental Issues
December 27, 2004.
The staff of the Federal Energy Regulatory Commission will prepare
an environmental assessment (EA) that will discuss the environmental
impacts of the Station 170 Clean Air Modifications Project involving
construction and operation of facilities by Transcontinental Gas Pipe
Line Corporation (Transco) in Appomattox County, Virginia.\1\ These
facilities would consist of 11 reciprocating engines to be upgraded to
comply with the State of Virginia's requirements to reduce nitrogen
oxide emissions. This EA will be used by the Commission in its
decision-making process to determine whether the project is in the
public convenience and necessity.
---------------------------------------------------------------------------
\1\ Transco's application was filed with the Commission under
section 7 of the Natural Gas Act and part 157 of the Commission's
regulations.
---------------------------------------------------------------------------
Summary of the Proposed Project
Transco proposes to modify 11 of its existing reciprocating engines
at Compressor Station No. 170 in Appomattox County, Virginia in order
to reduce oxides of nitrogen emissions to comply with the State of
Virginia's plans to implement the Clean Air Act Amendments of 1990
(CAA). In order to reduce emissions and comply with the CAA, Transco
seeks authority to:
? Install turbochargers and associated equipment on 7 of the
11 reciprocating engines;
? Increase the capacity of the turbochargers on the
remaining 4 reciprocating engines and install associated equipment;
[[Page 355]]
? Install a high-pressure fuel gas header;
? Install a new 13-by-28 foot power supply building; and
? Install new fin-fan coolers for the new turbochargers.
The general location of the project facilities is shown in Appendix
1.\2\
---------------------------------------------------------------------------
\2\ The appendices referenced in this notice are not being
printed in the Federal Register. Copies of all appendices, other
than Appendix 1 (maps), are available on the Commission's Web site
at the ``eLibrary'' link or from the Commission's Public Reference
Room, 888 First Street, NE., Washington, DC 20426, or call (202)
502-8371. For instructions on connecting to eLibrary refer to the
last page of this notice. Copies of the appendices were sent to all
those receiving this notice in the mail.
---------------------------------------------------------------------------
Land Requirements for Construction
Construction of the proposed facilities would occur on about one
acre of previously disturbed land. No new land would be required for
this project. All land would be restored according to the FERC staff's
Upland Erosion Control, Revegetation, and Maintenance Plan.
The EA Process
The National Environmental Policy Act (NEPA) requires the
Commission to take into account the environmental impacts that could
result from an action whenever it considers the issuance of a
Certificate of Public Convenience and Necessity. NEPA also requires us
to discover and address concerns the public may have about proposals.
This process is referred to as ``scoping''. The main goal of the
scoping process is to focus the analysis in the EA on the important
environmental issues. By this Notice of Intent, the Commission staff
requests public comments on the scope of the issues to address in the
EA. All comments received are considered during the preparation of the
EA. State and local government representatives are encouraged to notify
their constituents of this proposed action and encourage them to
comment on their areas of concern.
In the EA we \3\ will discuss impacts that could occur as a result
of the construction and operation of the proposed project under these
general headings:
---------------------------------------------------------------------------
\3\ ``We'', ``us'', and ``our'' refer to the environmental staff
of the Office of Energy Projects (OEP).
---------------------------------------------------------------------------
? Geology and soils.
? Land use.
? Cultural resources.
? Vegetation and wildlife.
? Air quality and noise.
? Endangered and threatened species.
? Hazardous waste.
? Water resources and fisheries.
We will also evaluate possible alternatives to the proposed project
or portions of the project, and make recommendations on how to lessen
or avoid impacts on the various resource areas.
Our independent analysis of the issues will be in the EA. Depending
on the comments received during the scoping process, the EA may be
published and mailed to federal, state, and local agencies, public
interest groups, interested individuals, affected landowners,
newspapers, libraries, and the Commission's official service list for
this proceeding. A comment period will be allotted for review if the EA
is published. We will consider all comments on the EA before we make
our recommendations to the Commission.
To ensure your comments are considered, please carefully follow the
instructions in the public participation section below.
Currently Identified Environmental Issues
We have already identified air and noise impacts as issues that we
think deserves attention based on a preliminary review of the proposed
modifications and the environmental information provided by Transco.
This preliminary list of issues may be changed based on your comments
and our analysis.
Public Participation
You can make a difference by providing us with your specific
comments or concerns about the project. By becoming a commentor, your
concerns will be addressed in the EA and considered by the Commission.
You should focus on the potential environmental effects of the
proposal, alternatives to the proposal, and measures to avoid or lessen
environmental impact. The more specific your comments, the more useful
they will be. Please carefully follow these instructions to ensure that
your comments are received in time and properly recorded.
? Send an original and two copies of your letter to: Magalie
R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First
St., NE., Room 1A, Washington, DC 20426.
? Label one copy of the comments for the attention of Gas Branch 2.
? Reference Docket No. CP05-37-000.
? Mail your comments so that they will be received in
Washington, DC on or before January 27, 2005.
Please note that we are continuing to experience delays in mail
deliveries from the U.S. Postal Service. As a result, we will include
all comments that we receive within a reasonable time frame in our
environmental analysis of this project. However, the Commission
strongly encourages electronic filing of any comments or interventions
or protests to this proceeding. See 18 CFR 385.2001(a)(1)(iii) and the
instructions on the Commission's Web site at http://www.ferc.gov
under the ``e-Filing'' link and the link to the User's Guide. Before you
can file comments you will need to create a free account which can be
created on-line.
We may mail the EA for comment. If you are interested in receiving
it, please return the Information Request (Appendix 3). If you do not
return the Information Request, you will be taken off the mailing list.
Becoming an Intervenor
In addition to involvement in the EA scoping process, you may want
to become an official party to the proceeding known as an
``intervenor''. Intervenors play a more formal role in the process.
Among other things, intervenors have the right to receive copies of
case-related Commission documents and filings by other intervenors.
Likewise, each intervenor must send one electronic copy (using the
Commission's eFiling system) or 14 paper copies of its filings to the
Secretary of the Commission and must send a copy of its filings to all
other parties on the Commission's service list for this proceeding. If
you want to become an intervenor you must file a motion to intervene
according to Rule 214 of the Commission's Rules of Practice and
Procedure (18 CFR 385.214) (see Appendix 2).\4\ Only intervenors have
the right to seek rehearing of the Commission's decision.
---------------------------------------------------------------------------
\4\ Interventions may also be filed electronically via the
Internet in lieu of paper. See the previous discussion on filing
comments electronically.
---------------------------------------------------------------------------
Affected landowners and parties with environmental concerns may be
granted intervenor status upon showing good cause by stating that they
have a clear and direct interest in this proceeding which would not be
adequately represented by any other parties. You do not need intervenor
status to have your environmental comments considered.
Environmental Mailing List
An effort is being made to send this notice to all individuals,
organizations, and government entities interested in and/or potentially
affected by the proposed project. This includes all landowners whose
property may be used temporarily for project purposes, or who own homes
within distances
[[Page 356]]
defined in the Commission's regulations of certain aboveground facilities.
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at 1-866-208-FERC or on the
FERC Internet Web site (http://www.ferc.gov)
using the eLibrary
link. Click on the eLibrary link, click on ``General Search'' and enter
the docket number excluding the last three digits in the Docket Number
field. Be sure you have selected an appropriate date range. For
assistance, please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free at 1-866-208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of formal documents issued by the Commission, such as orders,
notices, and rulemakings.
In addition, the Commission now offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries and direct links to
the documents. Go to http://www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits will be posted on the
Commission's calendar located at http://www.ferc.gov/EventCalendar/
EventsList.aspx
along with other related information.
Magalie R. Salas,
Secretary.
[FR Doc. E4-3921 Filed 1-3-05; 8:45 am]
BILLING CODE 6717-01-P