Preparation of Environmental Impact Statement for the Tucson
Urban Corridor in Tucson, AZ
AGENCY: Federal Transit Administration, DOT.
ACTION: Notice of intent to prepare an environmental impact statement
(EIS). Note: The following notice is an update to replace the notice
published in the Federal Register on 12/21/04.
-----------------------------------------------------------------------
SUMMARY: The Federal Transit Administration (FTA) and the City of
Tucson, Department of Transportation (TDOT), intend to prepare an
Alternatives Analysis (AA) and an Environmental Impact Statement (EIS)
in accordance with the National Environmental Policy Act (NEPA) on a
proposal by the City of Tucson to provide additional transit service to
the urban core of the City of Tucson. The AA/EIS will consider the
following alternatives: (1) A No-Build Alternative, consisting of
improvements contained in the Pima Association of Governments (PAG)
2025 Regional Transportation Plan (RTP); (2) Transportation System
Management Alternative (TSM), consisting of all reasonable cost-
effective transit service improvements within the urban core short of a
major investment in a New Starts project; (3) Rubber Tired Rapid Bus
Circulator operating in mixed traffic (4) Modern Streetcar operating in
mixed traffic; and (5) Heritage Trolley in mixed traffic. The type,
location, and need for ancillary facilities, such as maintenance
facilities, will also be considered for each alternative. In addition,
alternatives that are identified from the scoping process will be
evaluated in the AA. This notice is an update to replace the notice
published in the Federal Register on 12/21/04.
Scoping will be accomplished through correspondence and discussions
with interested persons; organizations; and Federal, State, and local
agencies; and through public and agency meetings. Depending on the
outcome of the scoping process and the analysis of a wide range of
transit alternatives in the Draft EIS (DEIS), a Locally Preferred
Alternative (LPA) will be selected and evaluated in the Final EIS
(FEIS). The FEIS will evaluate the potential impacts of the selected
investment strategy (the Build Alternative) and a No-Build Alternative.
DATES: Comment Due Date: Written comments on the scope of alternatives
and impacts to be considered in the AA/EIS must be received no later
than March 28, 2005, and must be sent to the City of Tucson at the
address indicated below.
Scoping Meeting Date: A public scoping meeting will be held from
4:30 p.m. to 6:30 p.m. on Wednesday, February 23, 2005 at the Historic
Depot, 400 N. Toole Avenue. Oral and written comments may be given at
the scoping meeting; a stenographer will record oral comments. Persons
with disabilities should contact Joan Beckim (see ADDRESSES section
below) 72 hours prior to the scoping meeting for special arrangements.
ADDRESSES: Written comments should be sent to Ms. Shellie Ginn, Tucson
Urban Corridor Study Project Manager, City of Tucson, Department of
Transportation, 201 N. Stone Avenue, 6th Floor, Tucson, Arizona 85726-
7210. E-mail: shellie.ginn@tucsonaz.gov. Phone: (520) 791-4372.
To be added to the mailing list, contact Ms. Shellie Ginn at the
address listed above. Please specify the mailing list of the Tucson
Urban Corridor Study Alternatives Analysis/Draft Environmental Impact
Statement (AA/DEIS). Persons with special needs such as sign language
interpretation should contact Joan Beckim, Public Involvement
Coordinator, 110 S. Church, #3350, Tucson, Arizona 85701. E-
mail: info@tucsontransitstudy.com. Phone (520) 624-5656. The dates and
addresses of the scoping meetings are given in the DATES section above.
All locations are accessible to people with disabilities.
FOR FURTHER INFORMATION CONTACT: To request a scoping information
packet, contact Ms. Shellie Ginn, Tucson Urban Corridor Study Project
Manager, City of Tucson, Department of Transportation, 201 N. Stone
Avenue, Tucson, Arizona 85726-7210. E-mail shellie.ginn@tucsonaz.gov.
Phone: (520) 791-4372. The Federal agency contact is Mr. Hymie Luden,
Office of Planning and Program Development, FTA, 201 Mission Street,
Room 2210, San Francisco, CA 95105. Phone: (415) 744-2732.
SUPPLEMENTARY INFORMATION:
I. Description of Study Area and Scope
The Federal Transit Administration (FTA), as joint lead agency with
the City of Tucson, will prepare an AA/EIS on a proposal to improve
transit service in an approximately five-mile long corridor in central
Tucson, Arizona. The study area for the Tucson Urban Corridor Study is
bounded by 22nd Street to the south; Campbell Avenue to the east; Grant
Road to the north; and Grande Avenue to the west. Most of the study
area is densely developed with a mixture of urban land uses and
includes the University of Arizona main and medical campuses, Main Gate
retail area, Fourth Avenue retail area, downtown Tucson and the
emerging Rio Nuevo area. Although not a part of the formal AA/EIS
process for the corridor study, results and recommendations will be
coordinated with the Pima Association of Government's effort to prepare
a multi-modal comprehensive transportation plan identifying
opportunities for future transportation connections throughout the
Tucson metropolitan area. The City of Tucson will perform conceptual
engineering for transit alternatives within the Tucson Urban Corridor
for the AA/DEIS that satisfies NEPA requirements. In addition, a
financial plan will be developed that examines alternative funding sources.
II. Purpose and Need
The Tucson Urban Corridor area is a major employment and activity
center. The study corridor continues to experience significant growth
in population and jobs. The city's largest activity center, the
University of Arizona, is included in the study area and attracts over
50,000 trips daily and whose master plan includes significant expansion
while holding parking to a constant 2004 level. The University is a
land locked urban campus whose primary mode of access in the future
will need to be transit. Along with this growth, traffic congestion and
capacity deficiencies are expected to increase. Roadway capacity
options would be difficult given the urban nature of the area and the
magnitude of historic structures and neighborhoods in the study area.
Inadequate transit service has hampered access to this area and to
other study area destinations. A major transit investment is recognized
as a feasible alternative to providing additional capacity within this
area.
The project is included in the PAG 2025 RTP as an unfunded project.
Funding would be considered as part of a proposed 2006 RTP financing
proposal.
[[Page 3098]]
III. Alternatives
Alternatives have been considered to address transportation issues
in the study corridor, connecting major activity centers in the central
core, including downtown Tucson, the Rio Nuevo Master Plan area, the
4th Avenue/Main Gate retail corridors, the University of Arizona, and
the Arizona Health Sciences Center (AHSC).
The Tucson Urban Corridor Study will be consistent with Federal
Transit Administration (FTA), Alternatives Analysis and Section 5309
New Start Program requirements for determining future federal funding
in recommended programs and be consistent with the National
Environmental Policy Act (NEPA). The alternatives being considered will
analyze mobility needs and identify and compare the costs, benefits,
and impacts of a range of transit alignment and technology
alternatives. At a minimum, the following alternatives will be considered:
? No-Build.
? Transportation System Management (TSM).
? Rubber Tired Rapid Bus Circulator.
? Heritage Trolley.
? Modern Streetcar.
Specific alignment alternatives include, but are not limited to:
(1) 2nd Street through the University of Arizona, University Boulevard,
Fourth Avenue, Congress and Pennington streets in the downtown area,
and Church Avenue to Granada to serve the emerging Rio Nuevo area.
These alternatives will be developed further during the preparation of
the AA/DEIS. Additional reasonable Build Alternatives suggested during
the scoping process, including those involving other modes, may be
considered.
IV. Probable Effects
The purpose of the EIS is to fully disclose the environmental
consequences of building and operating a major capital investment in
the Tucson Urban Corridor in advance of any decisions to commit
substantial financial or other resources towards its implementation.
sThe EIS will explore the extent to which study alternatives and
alignment options result in environmental impacts and will discuss
actions to reduce or eliminate such impacts.
Environmental issues to be examined in the EIS include: Potential
changes to the physical environment (natural resources, air quality,
noise, water quality, geology, visual); changes in the social
environment (land use, development, business and neighborhood
disruptions); changes in bicycle traffic, and pedestrian circulation;
changes in transit service and patronage; associated changes in traffic
congestion; and impacts on parklands and historic sites. Impacts will
be identified both for the construction period and for the long-term
operation of the alternatives. The proposed evaluation criteria include
transportation, social, economic, and financial measures, as required
by current federal (NEPA) environmental laws and the implementing
regulations of the Council on Environmental Quality and of FTA.
To ensure that the full range of issues related to this proposed
action will be addressed and all significant issues identified,
comments and suggestions are invited from all interested parties.
Comments or questions concerning this proposed action and the EIS
should be directed to the City of Tucson, Department of Transportation,
Manager as noted in the ADDRESSES section above.
V. FTA Procedures
To streamline the NEPA process and to avoid duplication of effort,
the agencies involved in the scoping process will consider the results
of any previous planning studies or financial feasibility studies
prepared in support of a decision by the Pima Association of
Governments (PAG) to include a particular alternative in the RTP for
metropolitan Tucson. Prior transportation planning studies may be
pertinent to establishing the purpose and need for the proposed action
and the range of alternatives to be evaluated in detail in the AA/EIS.
Depending on the outcome of the scoping process and the analysis of a
wide range of transit alternatives, a Locally Preferred Alternative
(LPA) will be selected and evaluated in the Draft EIS. The Draft EIS
will be prepared simultaneously with conceptual engineering for the
alternatives, including station and alignment options. The Draft EIS
process will address the potential use of federal funds for the
proposed action, as well as assess the social, economic, and
environmental impacts of the station and alignment alternatives.
Station designs and any alignment options will be refined to minimize
and mitigate any adverse impacts.
After publication, the Draft EIS will be available for public and
agency review and comment, and a public hearing will be held. Based on
the Draft EIS and comments received, the LPA may be refined, and the
City of Tucson will further assess the LPA in the Final EIS and will
apply for FTA approval to initiate Preliminary Engineering of the LPA.
Issued on: January 11, 2005.
Leslie Rogers,
Regional Administrator.
[FR Doc. 05-959 Filed 1-18-05; 8:45 am]
BILLING CODE 4910-57-P
![[logo] US EPA](http://www.epa.gov/epafiles/images/logo_epaseal.gif)