    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7167 or http://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements
Filed January 17, 2005 through January 21, 2005
Pursuant to 40 CFR 1506.9.
EIS No. 050017, Final EIS, NOA, ME, MA, RI, NH, CT, Atlantic Herring 
Fishery Management Plan, Minimizing Impacts on Essential Fish Habitat 
of Any Species, Gulf of Maine--Georges Bank, ME, NH, MA, CT and RI, 
Wait Period Ends: February 22, 2005, Contact: Peter D. Colosi (978) 
281-3332.

    The above NOA EIS should have appeared in the 01/21/2005 Federal 
Register. The 30 day Wait Period is Calculated from 01/21/2005.

EIS No. 050018, Draft EIS, FAA, IL, O'Hare Modernization Program, 
Proposes Major Development, Chicago O'Hare International Airport, 
Airport Layout Plan (ALP), Federal Funding, US Army COE Section 404 
Permit, City of Chicago, IL, Comment Period Ends: March 23, 2005, 
Contact: Michael W. MacMullen (847) 294-8339.

    The above FAA EIS should have appeared in the 01-21-2005 Federal 
Register.

EIS No. 050019, Final EIS, AFS, AK, Shoreline Outfitter/Guide Plan, 
Commercial Permits Issuance for Shoreline-Based Activities on National 
Forest System Lands, Admiralty Island National Monument, Hoonah, Sitka 
and Juneau Ranger Districts, Tongass National Forest, AK, Wait Period 
Ends: February 28, 2005, Contact: Bill Tremblay (907) 772-5877.
EIS No. 050020, Draft EIS, USN, FL, Navy Air-To-Ground Training at Avon 
Park Air Force Range, To Conduct Air-to-Ground Ordnance Delivery and 
Training, Fleet Forces Command's Fleet Readiness Training Program 
(FRTP), Polk and Highlands Counties, FL, Comments Period Ends: March 
14, 2005, Contact: Will Sloger (843) 820-5797.
EIS No. 050021, Draft EIS, NRC, WI, Generic-License Renewal for Point 
Beach Nuclear Plant, Units 1 and 2, Supplement 23, to NUREG-1437 (TAC 
Nos. MC2049 and MC2050), Lake Michigan, Manitowoc County, WI, Comment 
Period Ends: April 13, 2005, Contact: Stacey Imboden (301) 415-2462.
EIS No. 050022, Draft EIS, AFS, WA, Methow Transmission Project, 
Construction of New Transmission Line or Reconstruction an Existing 
Line, Okanogan and Wenatchee National Forests, Methow Valley Ranger 
District, Okanogan County, WA, Comment Period Ends: March 15, 2005, 
Contact: Jan Flatten (509) 826-3277.
EIS No. 050023, Final EIS, DOE, SC, Savannah River Site Construction 
and Operation of a Mixed Oxide (MOX) Fuel Fabrication Facility, NUREG-
1767, Aiken, Barnwell and Allendale Counties, SC, Wait Period Ends: 
February 28, 2005, Contact: Matthew Blevins (301) 415-7684.
EIS No. 050024, Draft EIS, AFS, CO, Gold Camp Road Plan, Develop a 
Feasible Plan to Manage the Operation of Tunnel #3 and the 8.5 
mile Road Segment, Pike National Forest, Pikes Peak Ranger District, 
Colorado Springs, El Paso County, CO, Comment Period Ends: March 29, 
2005, Contact: Frank Landis (719) 477-4203.
EIS No. 050025, Final EIS, UAF, TX, Relocation of the C-5 Formal 
Training Unit from Altus Air Force Base, Oklahoma to Lackland Air Force 
Base, Bexar County, TX, Wait Period Ends: February 28, 2005, Contact: 
Lt.Col. Dee Anderson (210) 671-2907.
EIS No. 050026, Draft EIS, BIA, WI, Beloit Casino Project, To Expand to 
Tribal Governmental Revenue Base, St. Croix Chippewa Indians of 
Wisconsin and Bad River Band of the Lake Superior Tribe of Chippewa 
Indians, Rock County, WI, Comment Period Ends: March 14, 2005, Contact: 
Herb Nelson (612) 713-4400.
EIS No. 050027, Final EIS, BLM, AK, Northeast National Petroleum 
Reserve Alaska Amended Integrated Activity Plan, To Amend 1998 
Northeast Petroleum Reserve, To Consider Opening Portions of the BLM-
Administrated Lands, North Slope Borough, AK, Wait Period Ends: 
February 28, 2005, Contact: Susan Childs (907) 271-1985.
EIS No. 050028, Draft Supplement EIS, FHW, AK, Juneau Access 
Transportation Project, Improvements in the Lynn Canal/Taiya Inlet

[[Page 4120]]

Corridor between Juneau and Haines/Skagway, Updated Information, 
Special-Use-Permit and COE Section 10 and 404 Permits, Tongass National 
Forest, Klondike Gold Rush National Historic Park, Haines States 
Forest, City and Borough of Juneau, Haines Borough, Cities Haines and 
Skagway, AK, Comment Period Ends: 03/21/2005, Contact: Tim Haugh (907) 
586-7430.

Amended Notices

EIS No. 050014, Final EIS, FAA, CA, Los Angeles International Aiport 
Proposed Master Plan Improvements, Alternative D Selected, Enhanced 
Safety and Security Plan, Los Angeles County, CA, Wait Period Ends: 
February 22, 2005, Contact: David B. Kessler (310) 725-3615.

    Revision of FR Notice Published on 01/21/2004: Correction to EIS 
Status from Draft to Final.

EIS No. 040544, Draft Supplemental EIS, FHW, UT, Legacy Parkway 
Project, Construction from I-215 at 2100 North in Salt Lake City to I-
15 and US 89 near Farmington, Updated Information, Funding and US Army 
COE Section 404 Permit, Salt Lake and Davis Counties, UT, Comment 
Period Ends: March 4, 2005, Contact: Gregory Punske (801) 963-0182.

    Revision of FR Notice Published on 12/03/2004: CEQ Comment Period 
Ending 02/01/2005 has been Extended to 03/04/2005.

    Dated: January 25, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 05-1635 Filed 1-27-05; 8:45 am]
BILLING CODE 6560-50-M 

 
 


Local Navigation


Jump to main content.