Environmental Impact Statement Adoption: Douglas County, KS
AGENCY: Federal Highway Administration (FHWA), DOT.
ACTION: Notice of intent.
-----------------------------------------------------------------------
SUMMARY: The FHWA is issuing this notice to advise the public of its
intent to adopt an existing Final Environmental Impact Statement in
accordance with the Council on Environmental Quality regulations, 40
CFR 1506.3. The Final EIS has been prepared and approved by the U.S.
Army Corps of Engineers, Kansas City District, for the South Lawrence
Trafficway located in Lawrence, Kansas.
FOR FURTHER INFORMATION CONTACT: Mr. Wendall L. Meyer, Assistant
Division Administrator, FHWA, Kansas Division Office, 6111 SW., 29th
Street, Topeka, KS 66614, Telephone: (785) 228-2544; or Mr. Corky
Armstrong, Road Design Engineer, Kansas Department of Transportation,
Dwight D. Eisenhower Building, 700 SW Harrison Street, Topeka, KS
66603-3754, Telephone: (785) 296-3901.
SUPPLEMENTARY INFORMATION: The FHWA, in cooperation with the Kansas
Department of Transportation (KDOT), intends to adopt an approved Final
EIS for the South Lawrence Trafficway located in Lawrence, Kansas. The
EIS was prepared by the U.S. Army Corps of Engineers, Kansas City
District, as part of a Section 404 Permit Application, Permit
Application Number 200101697. The Notice of Intent for the EIS appeared
in the FR, Volume 66, Number 152, August 7, 2001. The project consists
of construction of a new section of K-10 Highway beginning in Douglas
County at the existing K-10/U.S. 59 Highway interchange in southwest
Lawrence extending approximately six miles north and east to a location
on the existing K-10 alignment near the eastern edge of the City of
Lawrence. The preferred alternative would replace the existing K-10
route through Lawrence with a limited access freeway along the southern
edge of the city on an alignment identified as 32nd Street Alignment B.
The EIS considered the social, environmental, and economic impacts of
the project. The No-Action alternative and five roadway corridors with
a total of twelve reasonable build alternative alignments were
evaluated and discussed in the Draft and Final EIS. The FHWA will also
prepare and coordinate the distribution of a Draft and Final Section
4(f) Evaluation for the project, in accordance with 49 U.S.C. 303.
These documents will evaluate the reasonable alternatives to determine
if they are feasible and prudent as they relate to section 4(f). In
addition, FHWA will prepare its own Record of Decision for the South
Lawrence Trafficway alternative in accordance with 40 CFR 1505.2.
Comments or questions concerning these proposed actions should be
directed to the FHWA or KDOT at the addresses provided above.
(Catalog of Federal Domestic Assistance Program Number 20.205,
Highway Planning and Construction. The regulations implementing
Executive Order 12372 regarding intergovernmental consultation on
Federal programs and activities apply to this program.)
Issued on: April 3, 2006.
Wendell L. Meyer,
Assistant Division Administrator, Topeka, Kansas.
[FR Doc. 06-3376 Filed 4-7-06; 8:45 am]