ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6674-7]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared pursuant to the Environmental
Review Process (ERP), under section 309 of the Clean Air Act and
section 102(2)(c) of the National Environmental Policy Act as amended.
Requests for copies of EPA comments can be directed to the Office of
Federal Activities at 202-564-7167.
An explanation of the ratings assigned to draft environmental impact
statements (EISs) was published in FR dated April 7, 2006 (71 FR 17845).
Draft EISs
EIS No. 20050548, ERP No. D-NPS-E65078-NC, North Shore Road, Great
Smoky Mountains National Park, General Management Plan, Implementation,
Fontana Dam, Swain County, NC.
Summary: EPA expressed environmental concerns about the potential
for adverse impacts to water and air quality. In particular, acid
generation from highly mineralized rock which has the potential to
produce acid drainage impacting wetlands and aquatic life.
Rating EC1.
EIS No. 20060022, ERP No. D-FTA-L40230-WA, South Valley Corridor
Project, Improvement to Existing Urban Transportation System, Light
Rail Transit (LRT), Right-of-Way Grant, City of Liberty Lake, Spokane
County, WA.
Summary: EPA has no objections to the proposed project.
Rating LO.
EIS No. 20060063, ERP No. D-FHW-K40259-CA, Big Bear Lake Bridge
Replacement Project, near Big Bear Lake on CA-18 from Kilopost 71.1/
71.9, Realignment and Widening Roadways, U.S. COE section 404 Permit,
Funding, San Bernardino National Forest, San Bernardino County, CA.
Summary: EPA has no objections to the proposed project.
Rating LO.
EIS No. 20060064, ERP No. D-AFS-D65035-PA, Williow Creek All-Terrain
Vehicle Trail Expansion, Improvements, located in Marshburg/Stickney
Intensive Use Area, Alleghany National Forest, McKean County, PA.
Summary: EPA has environmental concerns about impacts to air
quality, wetlands, terrestrial habitat, historic resources, public
health and safety, and suggested clarification of ``forest level'' air
emissions as well as injury/death statistics pertinent to Allegheny NF.
The final EIS should include specific information on wetland location,
delineation and location of impacted terrestrial habitat resources.
Rating EC2.
EIS No. 20060073, ERP No. D-NRS-G31004-AR, Little Red River Irrigation
Project, Develop a Water Management Plan for Irrigation Purposes in
Seary, U.S. Army COE section 404 Permit, Raft Creek, White County, AR.
Summary: EPA does not object to the proposed action.
Rating LO.
EIS No. 20060055, ERP No. DS-AFS-J65438-WY, Dean Project Area, Proposes
to Implement Multiple Resource Management Actions, New Information to
Disclose Direct, Indirect, and Cumulative Environmental Impacts, Black
Hills National Forest, Bearlodge Ranger District, Sundance, Crook
County, WY.
Summary: The Supplemental EIS did not address EPA's environmental
concerns about impacts to water quality from timber harvest, runoff,
soil erosion and sediment losses and cumulative impacts to vegetation
and wildlife
[[Page 25172]]
habitat from other large-scale vegetation management projects.
Rating EC2.
Final EISs
EIS No. 20050429, ERP No. F-BLM-J02046-UT, Castle Peak and Eightmile
Flat Oil and Gas Expansion Project, Expansion of Crude Oil and Natural
Gas Development and Production Programs, Right-of-Way Grant, Duchesne
and Uintah Counties, UT.
Summary: The approved action has deferred drilling near riparian
areas until needed information from an ongoing survey is collected. EPA
continues to express environmental concerns about the potential for
adverse impacts to regional visibility and the adequacy of proposed
mitigation based on the results of analysis in the EIS indicating
adverse long term and cumulative air impacts from the project.
EIS No. 20060043, ERP No. F-AFS-J65443-CO, Rock Creek Integrated
Management Project, Propose Treatment to Address Mountain Beetle
Epidemics, and to Reduce Wildfires within the Rock Creek Analysis Area,
Medicine Bow-Routt National Forests and Thunder Basin National
Grassland, Glenwood Springs Resource Area, Routt and Grand Counties, CO.
Summary: The Final EIS addressed EPA's concerns with specific
treatments, applications and priorities under the HFA. Other comments
were not addressed, and EPA continues to express environmental concerns
about potential impacts to water quality from construction of up to 25
miles of road in an area with existing watershed impacts.
EIS No. 20060078, ERP No. F-NOA-G90016-TX, PROGRAMMATIC--Texas National
Estuarine Research Reserve and Management Plan, Mission-Aransas
Estuary, Site Designation, Federal Approval, TX.
Summary: No formal comment letter was sent to the preparing agency.
EIS No. 20060080, ERP No. F-AFS-L65476-WA, Methow Transmission Project,
Construction of New Transmission Line or Reconstruction an Existing
Line, Okanogan and Wenatchee National Forests, Methow Valley Ranger
District, Okanogan County, WA.
Summary: EPA continues to express environmental concerns about
potential impacts to habitat, resulting from construction of a new
substation in the Gold Creek area.
Dated: April 25, 2006.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E6-6430 Filed 4-27-06; 8:45 am]