Application To Voluntarily Transfer Export Authority EPCOR Merchant and Capital (U.S.) Inc.
Note: EPA no longer updates this information, but it may be useful as a reference or resource.
[Federal Register: August 24, 2006 (Volume 71, Number 164)]
[Notices]
[Page 50050-50051]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr24au06-38]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. EA-260-B]
Application To Voluntarily Transfer Export Authority EPCOR
Merchant and Capital (U.S.) Inc.
AGENCY: Office Electricity Delivery and Energy Reliability, DOE.
ACTION: Notice of Application.
-----------------------------------------------------------------------
SUMMARY: EPCOR Merchant and Capital (U.S.) Inc. (EMC) has applied to
voluntarily transfer to EPCOR Energy Marketing (U.S.) Inc. (EEM) its
authority to transmit electric energy from the United States to Canada
pursuant to section 202(e) of the Federal Power Act.
DATES: Comments, protests or requests to intervene must be submitted
on or before September 8, 2006.
ADDRESSES: Comments, protests or requests to intervene should be
addressed as follows: Office of Electricity Delivery and Energy
Reliability, Mail Code: OE-20, U.S. Department of Energy, 1000
Independence Avenue, SW., Washington, DC 20585-0350 (FAX 202-586-5860).
FOR FURTHER INFORMATION CONTACT: Steven Mintz (Program Office) 202-
586-9506 or Michael Skinker (Program Attorney) 202-586-2793.
SUPPLEMENTARY INFORMATION: Exports of electricity from the United
States to a foreign country are regulated and require authorization
under section 202(e) of the Federal Power Act (FPA) (16 U.S.C. 824a(e)).
On April 8, 2002, the Department of Energy (DOE) issued Order No.
EA-260 authorizing EMC to transmit electric energy from the United
States to Canada as a power marketer using existing international
electric transmission facilities. That two-year authorization expired
on April 8, 2004. On July 8, 2004, DOE received an application from EMC
to renew its authorization to transmit electric energy from the United
States to Canada. On October 13, 2004, that renewal was granted in
Order No. EA-260-A and will expire on April 9, 2009.
On July 13, 2006, DOE received an application from EMC to
voluntarily transfer its export authority to EEM. EEM was formed to
assume the duties previously undertaken by EMC, including the exporting
of electric energy to Canada. EEM is a Delaware corporation with its
principal place of business in Calgary, Alberta, Canada. EEM is an
indirect, wholly-owned subsidiary of EPCOR Utilities Inc. of Edmonton,
Alberta, Canada. EEM is a power marketer that does not own or control
any electric generation or transmission facilities nor does it have a
franchised service territory in the United States.
In OE Docket No. EA-260-B, EEM proposes to export electric energy
to Canada and to arrange for the delivery of those exports over the
international transmission facilities currently owned by Basin Electric
Power Cooperative, Bonneville Power Administration, Eastern Maine
Electric Cooperative, International Transmission Company, Joint Owners
of the Highgate Project, Long Sault, Inc., Maine Electric Power
Company, Maine Public Service Company, Minnesota Power, Inc., Minnkota
Power Cooperative, New York Power Authority, Niagara Mohawk Power
Corporation, Northern States Power, and Vermont Electric Transmission
Company and Vermont Electric Transmission Co.
The construction of each of the international transmission
facilities to be utilized by EEM, as more fully described in its
application, has previously been authorized by a Presidential permit
issued pursuant to Executive Order 10485, as amended.
The applicant has requested expedited processing of this
application so that it may proceed with the proposed transfer.
Accordingly, DOE has shortened the public comment period to 15 days.
Procedural Matters: Any person desiring to become a party to this
proceeding or to be heard by filing comments or protests to this
application should file a petition to intervene, comment or protest at
the address provided above in accordance with 385.211 or 385.214 of the
Federal Energy Regulatory Commission's Rules of Practice and Procedures
(18 CFR 385.211, 385.214). Fifteen copies of each petition and protest
should be filed with the DOE on or before the date listed above.
Comments on the EMC application to voluntarily transfer their
export authorization to EEM should be clearly
[[Page 50051]]
marked with Docket EA-260-B. Additional copies are to be filed directly
with Lee Bui, Transaction Accounting Assistant, EPCOR Energy Marketing
(U.S.) Inc., EPCOR Place, 8th Floor, 505 2nd Street, SW., Calgary,
Alberta T2P 1N8, Canada and Sandra E. Rizzo, Esq. Preston Gates Ellis,
& Rouvelas Meeds, LLP, 1735 New York Avenue, NW., Suite 500,
Washington, DC 20006.
A final decision will be made on this application after the
environmental impacts have been evaluated pursuant to the National
Environmental Policy Act of 1969, and a determination is made by the
DOE that the proposed action will not adversely impact on the
reliability of the U.S. electric power supply system.
Copies of this application will be made available, upon request,
for public inspection and copying at the address provided above or by
e-mailing Odessa Hopkins at Odessa.hopkins@hq.doe.gov.
Issued in Washington, DC, on August 17, 2006.
Anthony J. Como,
Director, Permitting and Siting Office of Electricity Delivery and
Energy Reliability.
[FR Doc. E6-14044 Filed 8-23-06; 8:45 am]