Notice of Application Accepted for Filing and Soliciting Motions To Intervene, Protests, and Comments

Note: EPA no longer updates this information, but it may be useful as a reference or resource.


 [Federal Register: December 4, 2006 (Volume 71, Number 232)]
[Notices]
[Page 70377-70379]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr04de06-51]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Notice of Application Accepted for Filing and Soliciting Motions
To Intervene, Protests, and Comments

November 27, 2006.
    Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
    a. Type of Application: Preliminary Permit.
    b. Project No.: 12747-000.

[[Page 70378]]

    c. Date filed: October 31, 2006.
    d. Applicant: San Diego Water Authority.
    e. Name of Project: San Vicente Pumped Storage Project.
    f. Location: The project would be located on San Vicente Reservoir
and San Vicente River in San Diego County, California.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contacts: Mr. Paul Gebert, San Diego Water Authority,
4677 Overland Avenue, San Diego, CA 92123, phone: (858)-522-67551.
    i. FERC Contact: Robert Bell, (202) 502-4126.
    j. Deadline for filing comments, protests, and motions to
intervene: 60 days from the issuance date of this notice.
    The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person in the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
    k. Description of Project: There are three alternatives for the
proposed project: Iron Mountain Alternative, Foster Canyon Alternative,
and East Reservoir Alternative. Specific details about each of these
alternatives are described below.

Applicable To All Alternatives

    All of the alternatives will have the same lower reservoir
consisting of: (1) An existing dam to be raised to a dam height of 274
feet, and a length of 1,120 feet with the possibility that the dam
could be raised to be 337 feet high with a length of 1,442 feet; and
(2) an existing impoundment increased to a surface area of 1,360 acres,
having a storage capacity of 142,00 acre-feet with a normal maximum
water surface elevation of 704 feet mean sea level (msl), and also the
possibility to further increase the surface area to 1,667 acres, having
a storage capacity of 247,000 acre-feet with a normal maximum water
surface elevation of 767 feet msl.

Iron Mountain Alternative

    (1) A proposed 235-foot-high, 1,250-foot-long upper dam, (2) a
proposed upper reservoir with a surface area of 93 acres having a
storage capacity of 8,070 acre-feet and a normal maximum water surface
elevation of 2,110 feet msl, (3) a proposed 12,300-foot-long, 20-foot-
long concrete power tunnel, (4) two proposed 300-foot-long steel lined
penstocks, (5) a proposed powerhouse containing two generating units
having a total installed capacity of 550 megawatts, (6) a proposed
3,300-foot-long, 24-foot-diameter concrete tailrace, (7) a proposed
2,600-foot-long, 230 kilovolt transmission line, and (8) appurtenant
facilities.

Foster Canyon Alternative

    (1) A proposed 215-foot-high, 4,500-foot-long upper dam, (2) a
proposed upper reservoir with a surface area of 100 acres having a
storage capacity of 12,200 acre-feet and a normal maximum water surface
elevation of 1,490 feet msl, (3) a proposed 3,000-foot-long, 20-foot-
long concrete power tunnel, (4) two proposed 300-foot-long steel lined
penstocks, (5) a proposed powerhouse containing two generating units
having a total installed capacity of 480 megawatts, (6) a proposed
2,700-foot-long, 24-foot-diameter concrete tailrace, (7) a proposed
2,600-foot-long, 230 kilovolt transmission line, and (8) appurtenant
facilities.

East Reservoir Alternative

    (1) A proposed 200-foot-high, 2,200-foot-long upper dam, (2) a
proposed upper reservoir with a surface area of 60 acres having a
storage capacity of 6,800 acre-feet and a normal maximum water surface
elevation of 1,600 feet msl, (3) a proposed 6,000-foot-long, 20-foot-
long concrete power tunnel, (4) two proposed 300-foot-long steel lined
penstocks, (5) a proposed powerhouse containing two generating units
having a total installed capacity of 570 megawatts, (6) a proposed
2,600-foot-long, 24-foot-diameter concrete tailrace, (7) a proposed
2,600-foot-long, 230 kilovolt transmission line, and (8) appurtenant
facilities.
    The proposed project would have a maximum estimated annual
generation of up to 1,000 gigawatt-hours, which would be sold to a
local utility.
    l. Locations of Application: A copy of the application is available
for inspection and reproduction at the Commission in the Public
Reference Room, located at 888 First Street, NE., Room 2A, Washington
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at http://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, call toll-free 1-866-208-3676 or e-mail 
FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item h
above.
    m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
    n. Competing Preliminary Permit: Anyone desiring to file a
competing application for preliminary permit for a proposed project
must submit the competing application itself, or a notice of intent to
file such an application, to the Commission on or before the specified
comment date for the particular application (see 18 CFR 4.36).
Submission of a timely notice of intent allows an interested person to
file the competing preliminary permit application no later than 30 days
after the specified comment date for the particular application. A
competing preliminary permit application must conform with 18 CFR
4.30(b) and 4.36.
    o. Competing Development Application: Any qualified development
applicant desiring to file a competing development application must
submit to the Commission, on or before a specified comment date for the
particular application, either a competing development application or a
notice of intent to file such an application. Submission of a timely
notice of intent to file a development application allows an interested
person to file the competing application no later than 120 days after
the specified comment date for the particular application. A competing
license application must conform with 18 CFR 4.30(b) and 4.36.
    p. Notice of Intent: A notice of intent must specify the exact
name, business address, and telephone number of the prospective
applicant, and must include an unequivocal statement of intent to
submit, if such an application may be filed, either a preliminary
permit application or a development application (specify which type of
application). A notice of intent must be served on the applicant(s)
named in this public notice.
    q. Proposed Scope of Studies under Permit: A preliminary permit, if
issued, does not authorize construction. The term of the proposed
preliminary permit would be 36 months. The work proposed under the
preliminary permit would include economic analysis, preparation of
preliminary engineering plans, and a study of environmental impacts.
Based on the results of these studies, the Applicant would decide
whether to proceed with the preparation of a development application to
construct and operate the project.
    r. Comments, Protests, or Motions to Intervene: Anyone may submit

[[Page 70379]]

comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
    Comments, protests and interventions may be filed electronically
via the Internet in lieu of paper; See 18 CFR 385.2001 (a)(1)(iii) and
the instructions on the Commission's web site under ``e-filing'' link.
The Commission strongly encourages electronic filing.
    s. Filing and Service of Responsive Documents: Any filings must
bear in all capital letters the title ``COMMENTS'', ``RECOMMENDATIONS
FOR TERMS AND CONDITIONS'', ``PROTEST'',''COMPETING APPLICATION'' OR
``MOTION TO INTERVENE'', as applicable, and the Project Number of the
particular application to which the filing refers. Any of the above-
named documents must be filed by providing the original and the number
of copies provided by the Commission's regulations to: The Secretary,
Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426. A copy of any motion to intervene must also be
served upon each representative of the Applicant specified in the
particular application.
    t. Agency Comments: Federal, State, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.

Magalie R. Salas,
Secretary.
[FR Doc. E6-20472 Filed 12-1-06; 8:45 am]
BILLING CODE 6717-01-P 

 
 