DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12608-000]
 
Alternatives Unlimited, Inc.; Notice Soliciting Scoping Comments

January 25, 2006.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Exemption from Licensing.
    b. Project No.: P-12608-000.
    c. Date filed: August 15, 2005.
    d. Applicant: Alternatives Unlimited, Inc.
    e. Name of Project: Alternatives Hydro Power Project.
    f. Location: On the Mumford River, in the Town of Northbridge, 
Worcester County, Massachusetts. The project would not use federal land.
    g. Filed Pursuant to: Public Utility Regulatory Policies Act of 
1978, 16 U.S.C. sections 2705 and 2708.
    h. Applicant Contact: Kathleen D. Hervol. Beals and Thomas, Inc. 
Reservoir Corporate Center, 144 Turnpike Road (Route 9), Southborough, 
MA 01772-2104, (508) 366-0560.
    i. FERC Contact: Stefanie Harris, (202) 502-6653 or 
stefanie.harris@ferc.gov.
    j. Deadline for filing scoping comments: February 24, 2006.
    All documents (original and eight copies) should be filed with: 
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 
First Street, NE., Washington, DC 20426.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    Scoping comments may be filed electronically via the Internet in 
lieu of paper. The Commission strongly encourages electronic filings. 
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's 
Web site (http://www.ferc.gov) Exit Disclaimer under the ``eFiling'' link.
    k. This application is not ready for environmental analysis at this 
time.
    l. Description of Project: The Alternatives Hydro Power Project 
would consist of: (1) The existing 127-foot-long by 15.5-foot-high Ring 
Shop Dam consisting of a concrete 9.5-foot-high spillway topped with 
2.5-foot-high flashboards, a waste gate, and two inlet structures 
located at the north and south ends of the spillway, (2) an existing 
1.3-acre reservoir enlarged to 2 acres with a normal full pond 
elevation of 285.1 feet above mean sea level, (3) a restored 8-foot-
wide head gated intake structure, (4) a new 23-foot by 6-foot metal 
service platform (to be enclosed for a future powerhouse) located at 
the south side of the dam containing three generating units with a 
total installed capacity of 45 kilowatts; and (5) appurtenant 
facilities. The restored project would have an average annual 
generation of 340 megawatt-hours.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at http://www.ferc.gov Exit Disclaimer using the 
"eLibrary" link. Enter the docket number excluding the last three digits 
in the docket number field to access the document. For assistance, contact 
FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-
866-208-3676, or for TTY, (202) 502-8659. A copy is also available for 
inspection and reproduction at the address in item h above.
    n. You may also register online at http://www.ferc.gov/
esubscribenow.htm Exit Disclaimer to be notified via email of new filings 
and issuances related to this or other pending projects. For 
assistance, contact FERC Online Support.
    o. Scoping Process: The Commission staff intends to prepare a 
single Environmental Assessment (EA) for the Alternatives Hydro Power 
Project in accordance with the National Environmental Policy Act. The 
EA will consider both site-specific and cumulative environmental 
impacts and reasonable alternatives to the proposed action.
    Commission staff do not propose to conduct any on-site scoping 
meetings at this time. Instead, we are soliciting comments, 
recommendations, and information, on the Scoping Document (SD).
    Copies of the SD outlining the subject areas to be addressed in the 
EA were distributed to the parties on the Commission's mailing list. 
Copies of the SD may be viewed on the Web at http://www.ferc.gov Exit Disclaimer 
using the ``eLibrary'' link. Enter the docket number excluding the last 
three digits in the docket number field to access the document. For 
assistance, call 1-866-208-3676 or for TTY, (202) 502-8659.

Magalie R. Salas,
Secretary.
[FR Doc. E6-1249 Filed 1-31-06; 8:45 am]
BILLING CODE 6717-01-P 

 
 