DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12608-000]
Alternatives Unlimited, Inc.; Notice Soliciting Scoping Comments
January 25, 2006.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Exemption from Licensing.
b. Project No.: P-12608-000.
c. Date filed: August 15, 2005.
d. Applicant: Alternatives Unlimited, Inc.
e. Name of Project: Alternatives Hydro Power Project.
f. Location: On the Mumford River, in the Town of Northbridge,
Worcester County, Massachusetts. The project would not use federal land.
g. Filed Pursuant to: Public Utility Regulatory Policies Act of
1978, 16 U.S.C. sections 2705 and 2708.
h. Applicant Contact: Kathleen D. Hervol. Beals and Thomas, Inc.
Reservoir Corporate Center, 144 Turnpike Road (Route 9), Southborough,
MA 01772-2104, (508) 366-0560.
i. FERC Contact: Stefanie Harris, (202) 502-6653 or
stefanie.harris@ferc.gov.
j. Deadline for filing scoping comments: February 24, 2006.
All documents (original and eight copies) should be filed with:
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
Scoping comments may be filed electronically via the Internet in
lieu of paper. The Commission strongly encourages electronic filings.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site (http://www.ferc.gov)
under the ``eFiling'' link.
k. This application is not ready for environmental analysis at this
time.
l. Description of Project: The Alternatives Hydro Power Project
would consist of: (1) The existing 127-foot-long by 15.5-foot-high Ring
Shop Dam consisting of a concrete 9.5-foot-high spillway topped with
2.5-foot-high flashboards, a waste gate, and two inlet structures
located at the north and south ends of the spillway, (2) an existing
1.3-acre reservoir enlarged to 2 acres with a normal full pond
elevation of 285.1 feet above mean sea level, (3) a restored 8-foot-
wide head gated intake structure, (4) a new 23-foot by 6-foot metal
service platform (to be enclosed for a future powerhouse) located at
the south side of the dam containing three generating units with a
total installed capacity of 45 kilowatts; and (5) appurtenant
facilities. The restored project would have an average annual
generation of 340 megawatt-hours.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at http://www.ferc.gov
using the
"eLibrary" link. Enter the docket number excluding the last three digits
in the docket number field to access the document. For assistance, contact
FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-
866-208-3676, or for TTY, (202) 502-8659. A copy is also available for
inspection and reproduction at the address in item h above.
n. You may also register online at http://www.ferc.gov/
esubscribenow.htm
to be notified via email of new filings
and issuances related to this or other pending projects. For
assistance, contact FERC Online Support.
o. Scoping Process: The Commission staff intends to prepare a
single Environmental Assessment (EA) for the Alternatives Hydro Power
Project in accordance with the National Environmental Policy Act. The
EA will consider both site-specific and cumulative environmental
impacts and reasonable alternatives to the proposed action.
Commission staff do not propose to conduct any on-site scoping
meetings at this time. Instead, we are soliciting comments,
recommendations, and information, on the Scoping Document (SD).
Copies of the SD outlining the subject areas to be addressed in the
EA were distributed to the parties on the Commission's mailing list.
Copies of the SD may be viewed on the Web at http://www.ferc.gov
using the ``eLibrary'' link. Enter the docket number excluding the last
three digits in the docket number field to access the document. For
assistance, call 1-866-208-3676 or for TTY, (202) 502-8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6-1249 Filed 1-31-06; 8:45 am]