ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6677-1]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared pursuant to the Environmental
Review Process (ERP), under section 309 of the Clean Air Act and
Section 102(2)(c) of the National Environmental Policy Act as amended.
Requests for copies of EPA comments can be directed to the Office of
Federal Activities at 202-564-7167. An explanation of the ratings
assigned to draft environmental impact statements (EISs) was published
in FR dated April 7, 2006 (71 FR 17845).
Draft EISs
EIS No. 20060125, ERP No. D-FRC-L05235-WA, Baker River Hydroelectric
Project, Application to Relicense the Upper Baker and Lower Baker
Developments, Mt. Baker-Snoqualmie National Forest, Baker River,
Whatcom and Skagit Counties, WA.
Summary: Although EPA had no objections to the proposed project,
EPA recommended that updated information be provided in the final EIS
on the CWA 401 water quality certification. Rating LO.
EIS No. 20060160, ERP No. D-BPA-L08064-OR, Klondike III Wind Project
(300 megawatts {MW{time} ) and Biglow Canyon Wind Farm (400 megawatts
{MW{time} ) Integration Project, Construction and Operation of a
Double-Circuit 230-Kilovolt (kV) Transmission, Sherman County, OR.
Summary: EPA expressed environmental concern about wetland impacts
and requested additional information on tribal consultations and
outcomes, and extent of public involvement in the project planning.
Rating EC1.
EIS No. 20060163, ERP No. DB-COE-K36100-CA, American River Watershed
Project, Post Authorization Decision Document, Folsom Dam Raise, Folsom
Bridge Project, Propose to Construct a Permanent Bridge and Roadway
across the American River, City of Folsom, Sacramento County, CA.
Summary: EPA expressed environmental concerns about impacts to air
quality and requested additional information related to mitigation and
partnerships with local transportation agencies to reduce the traffic
impacts in the area. Rating EC2.
Final EISs
EIS No. 20060145, ERP No. F-COE-D35060-PA, Allegheny and Ohio Rivers
Commercial Sand and Gravel Dredging Operations, Granting and Extending
Permits for Continuance of Dredging and US Army COE Section 10 and 404
Permits Issuance, PA.
Summary: EPA continues to express environmental concerns about
shallow river bottom impacts and CWA Section 404 issues. EPA requested
the adoption of an adaptative management process, additional conceptual
mitigation, and permit restrictions.
EIS No. 20060169, ERP No. F-FRC-C03015-00, Crown Landing Liquefied
[[Page 38641]]
Natural Gas Terminal, Construct and Operate in Gloucester County, NJ
and New Castle County, DE; and Logan Lateral Project, Construct and
Operate a New Natural Gas Pipeline and Ancillary Facilities in
Gloucester County, NJ and Delaware, PA.
Summary: While EPA has no objection to the proposed action, EPA did
request clarification on mitigation plans for wetlands and shallow
water habitat impacts, as well as a Clean Air Act General Conformity
Analysis.
EIS No. 20060175, ERP No. F-FRC-G03029-LA, Creole Trail Liquefied
National Gas (LNG) Terminal and Pipeline Project, Construction and
Operation, Cameron, Calcasieu, Beauregard, Allen, Jefferson, Davis and
Acadia Parishes, LA.
Summary: EPA expressed environmental concerns about uncertainties
over the evaluation of dredged material and requested that a Record of
Decision not be issued until these concerns are adequately addressed.
EIS No. 20060176, ERP No. F-FRC-G03028-00, Port Arthur Liquefied
Natural Gas (LNG) Project, Construction and Operation, U.S. Army COE
Section 10 and 404 Permits, (FERC/EIS-0182D), Jefferson and Orange
Counties TX and Cameron, Calcasieu and Beauregard Parishes, LA.
Summary: EPA does not object to the preferred action.
EIS No. 20060202, ERP No. F-NOA-E86003-00, Snapper Grouper Fishery,
Amendment 13C to the Fishery Management Plan, Phase Out Overfishing of
Snowy Grouper, Golden Tilefish, Vermilion Snapper and Sea Bass,
Implementation, South Atlantic Region.
Summary: EPA does not object to the proposed action.
EIS No. 20060210, ERP No. F-UAF-K11109-AZ, Barry M. Goldwater Range
(BMGR), Integrated Natural Resources Management Plan (INRMP),
Implementation, Yuma, Pima, and Maricopa Counties, AZ.
Summary: No formal comment letter was sent to the preparing agency.
EIS No. 20060224, ERP No. F-GSA-L80018-WA, Peace Arch Port of Entry
Redevelopment Project, Improvements to Security, Safety and
Functionality, Canadian Border in Blaine, Whatcom County, WA.
Summary: EPA's previous issues were resolved, therefore EPA does
not object to the proposed action.
Dated: July 3, 2006.
Ken Mittelholtz,
Environmental Protection Specialist, Office of Federal Activities.
[FR Doc. E6-10678 Filed 7-6-06; 8:45 am]