Jump to main content.


Environmental Impacts Statements; Notice of Availability

Note: EPA no longer updates this information, but it may be useful as a reference or resource.


 [Federal Register: July 28, 2006 (Volume 71, Number 145)]
[Notices]
[Page 42846-42847]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr28jy06-51]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6677-6]
 
Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7167 or http://www.epa.gov/compliance/nepa/
Weekly receipt of Environmental Impact Statements
Filed July 17, 2006 Through July 21, 2006
Pursuant to 40 CFR 1506.9.
EIS No. 20060300, Draft EIS, AFS, CO, White River National Forest 
Travel Management Plan, To Accommodate and Balance Transportation 
Needs, Implementation, Eagle, Garfield, Gunnison, Mesa, Moffat, Pitkin, 
Rio Blanco, Routt and Summit Counties, CO

    Comment Period Ends: October 25, 2006, Contact: Wendy Haskins 970-
945-3303.

EIS No. 20060301, Final EIS, NPS, ID, Minidoka Internment National 
Monument (Former Minidoka Relocation Center) , General Management Plan, 
Implementation, Jerome County, ID

    Wait Period Ends: August 28, 2006, Contact: Anna Tamura 206-220-4157.

EIS No. 20060302, Final EIS, NPS, FL, Fort King National Historic 
Landmark, Special Resource Study, Implementation, Second Seminole War 
Site, City of Ocala, Marion County, FL

    Wait Period Ends: August 28, 2006, Contact: Tim Bemisderfer 404-
562-3124 Ext. 693.

EIS No. 20060303, Final EIS, NOA, GA, Gray's Reef National Marine 
Sanctuary Draft Management Plan (DMP), Address Current Resource 
Conditions and Compatible Multiple Uses, Located 17.5 Nautical mile off 
Sapelo Island, GA

    Wait Period Ends: August 28, 2006, Contact: Elizabeth Moore 301-
713-3125 Ext 270.

EIS No. 20060304, Final EIS, AFS, ID, Clear Prong Project, Timber 
Harvest, Temporary Road Construction, Road Maintenance, Road 
Decommissioning, Thinning of Sub-Merchantable Tree, and Prescribed 
Fire, Boise National Forest, Cascade Ranger District, Valley County, ID

    Wait Period Ends: August 28, 2006, Contact: Keith Dimmett 208-382-7400.

EIS No. 20060305, Draft EIS, GSA, VT, New U.S. Border Station and 
Commercial Port of Entry Route I-91 Derby Line, Design and 
Construction, Vermont

    Comment Period Ends: September 11, 2006, Contact: Glenn C. Rotondo 
617-565-5694.

EIS No. 20060306, Final EIS, FHW, FL, Indian Street Bridge PD&E Study, 
New Bridge Crossing of the South Fork of the St. Lucie River County 
Road 714 (Martin Highway)/SW 36th Street/Indian Street from Florida's 
Turnpike to East of Willoughby Boulevard, Martin County, FL

    Wait Period Ends: August 28, 2006, Contact: J. Chris Richter 850-
942-9650 Ext 3022.

EIS No. 20060307, Draft Supplement, FHW, WA, WA-99 Alaskan Way Viaduct 
and Seawall Replacement Project, Additional Information and Evaluation 
of Construction Plan, Provide Transportation Facility and Seawall with 
Improved Earthquake Resistence, U.S. Army COE Section 10 and 404 
Permits, Seattle, WA

    Comment Period Ends: September 22, 2006, Contact: Margaret 
Kucharski 206-6382-6356.

EIS No. 20060308, Draft EIS, FTA, TX, Southeast Corridor Project, 
Proposed Fixed-Guideway Transit System, Funding, Metropolitan Transit 
Authority (METRO) of Harris County, Houston, Harris County, TX

    Comment Period Ends: September 11, 2006, Contact: John Sweek 817-
978-0550.

EIS No. 20060309, Draft EIS, NOA, 00, Pacific Coast Groundfish Fishery 
Management Plan, Proposed Acceptable Biological Catch and Optimum Yield 
Specifications and Management Measures for the 2007-2008 Pacific Coast 
Groundfish Fishery and Amendment 16-4 Rebuilding Plans for Seven 
Depleted Pacific Coast Groundfish Species, WA, OR and CA

    Comment Period Ends: September 11, 2006, Contact: Robert Lohn 206-
625-6150.

[[Page 42847]]

EIS No. 20060310, Final EIS, IBR, NM, Long-Term Miscellaneous Purposes 
Contract Abstract, To Use Carlsbad Project Water for Purposes Other 
than Irrigation, Eddy County, NM

    Wait Period Ends: August 28, 2006, Contact: Marsha Carra 505-462-3602.

EIS No. 20060311, Draft EIS, NPS, UT, Utah Museum of Natural History, 
Construction and Operation, New Museum Facility at University of Utah, 
Salt Lake City, UT

    Comment Period Ends: September 28, 2006, Contact: Bridger Call 801-
355-8816.

EIS No. 20060312, Draft EIS, AFS, CA, SPI Road Project, Construction of 
an Access Road Across National Forest Land, Special Use Permit, Six 
Rivers National Forest, Lower Trinity Ranger District, Trinity County, CA

    Comment Period Ends: September 11, 2006, Contact: Katherine Worn 
707-441-3561.

EIS No. 20060313, Draft EIS, BIA, MT, Kerr Hydroelectric Project, 
Proposed Drought Management Plan, Implementation, Flathead Lake, MT

    Comment Period Ends: September 11, 2006, Contact: Jeffery Loman 
202-208-7373.

    Dated: July 25, 2006.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E6-12136 Filed 7-27-06; 8:45 am]
BILLING CODE 6560-50-P 

 
 


Local Navigation


Jump to main content.