Availability of the Final Supplemental Environmental Impact Statement for the Boston Harbor Inner Harbor Maintenance Dredging Project
Note: EPA no longer updates this information, but it may be useful as a reference or resource.
[Federal Register: June 2, 2006 (Volume 71, Number 106)]
[Notices]
[Page 32059-32060]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr02jn06-41]
-----------------------------------------------------------------------
DEPARTMENT OF DEFENSE
Department of the Army; Corps of Engineers
Availability of the Final Supplemental Environmental Impact
Statement for the Boston Harbor Inner Harbor Maintenance Dredging Project
AGENCY: Department of the Army, U.S. Army Corps of Engineers, DOD.
ACTION: Notice of availability.
-----------------------------------------------------------------------
SUMMARY: The U.S. Army Corps of Engineers, New England District has
prepared a Final Supplemental Environmental Impact Statement to
maintenance dredge the following Federal navigation channels: The Main
Ship Channel upstream of Spectacle Island to the Inner Confluence, the
upper Reserved Channel, the approach to the Navy Dry Dock, a portion of
the Mystic River, and a portion of the Chelsea River (previously
permitted) in Boston Harbor, MA. Maintenance dredging of the navigation
channels landward of Spectacle Island is needed to remove shoals and
restore the Federal navigation channels to their authorized depths.
Materials dredged from the Federal channels will either be disposed at
the Massachusetts Bay Disposal Site (for the material suitable for
unconfined open water disposal) or, for the material not suitable for
unconfined open water
[[Page 32060]]
disposal, in confined aquatic disposal (CAD) cell(s). Major navigation
channel improvements (deepening) were made in 1999 through 2001 in the
Reserved Channel, the Mystic River, Inner Confluence and the Chelsea
River. A Final EIS prepared for this previous navigation improvement
project in June of 1995 identified selected use of CAD cells in the
Mystic River, Inner Confluence, and Chelsea River were investigated. A
new CAD cell for the proposed maintenance project will be constructed
in the Mystic River and in the Main Ship Channel just below the Inner
Confluence.
DATES: Submit comments on or before July 1, 2006.
ADDRESSES: If you wish to receive a copy of the FSEIS, Executive
Summary, or provide comments on the FSEIS, please contact Mr. Michael
F. Keegan, U.S. Army Corps of Engineers, New England District, Programs
& Civil Project Management Branch, 696 Virginia Road, Concord, MA 01742.
FOR FURTHER INFORMATION CONTACT: Mr. Michael Keegan, (978) 318-8087.
SUPPLEMENTARY INFORMATION: The U.S. Army Corps of Engineers is
authorized by the various River and Harbor Acts and Water Resources
Development Acts to conduct maintenance dredging of the Federal
navigation channels and anchorage areas in Boston Harbor.
Dated: May 23, 2006.
Curtis L. Thalken,
Colonel, Corps of Engineers, New England District.
[FR Doc. 06-5058 Filed 6-1-06; 8:45am]
BILLING CODE 3710-24-M