[Federal Register: June 9, 2006 (Volume 71, Number 111)]
[Notices]
[Page 33446]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr09jn06-32]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6675-9]
Notice of Intent: Intent to Prepare a Supplemental Environmental Impact
Statement (SEIS) for the Chuitna Coal Project in Southcentral Alaska
AGENCY: U.S. Environmental Protection Agency.
Purpose: In accordance with section 102(2)(C) of the National
Environmental Policy Act (NEPA), EPA, as the lead Federal agency, has
identified a need to prepare a Supplemental Environmental Impact
Statement (SEIS) and therefore issues this Notice of Intent in
accordance with 40 CFR 1501.7.
For a Copy of the Scoping Document and to be Placed on the Project
Mailing List Contact: Hanh Shaw, Project Manager, Office of Water and
Watersheds (OWW-130), U.S. EPA Region 10, 1200 Sixth Avenue, Seattle,
Washington 98101, Telephone: (206) 553-0171, Fax: (206) 553-0165, E-
mail: shaw.hanh@epa.gov.
SUMMARY: The Chuitna Coal Project (Project) is located on State of
Alaska land in the Beluga Coal Field, approximately 45 miles west of
Anchorage, Alaska. The Project is based on the development of a 1
billion ton, ultra low sulfur, subbituminous coal resource. The
proposed Project includes a surface coal mine and associated support
facility, mine access road, coal transport conveyor, personnel housing,
air strip facility, a logistic center, and coal export terminal. The
proposed coal mine is located approximately 10 miles inland from the
Native Village of Tyonek and Cook Inlet. The project proponent, PacRim
Coal, LP, predicts a coal production rate of approximately 15 million
tons per year, and a 25-year mine life based on current estimated coal
reserves.
A previous Project design was evaluated in an EIS and permitted by
most of the applicable State and Federal regulatory programs in the
early 1990s, although the Project did not proceed to development. There
have been substantial changes in the Project design and in the
regulatory requirements since this project went through the first
permitting and EIS process. Therefore, a comprehensive, stand-alone
Supplemental EIS will be prepared for the new proposal.
The administrative actions that the SEIS must address include
issuing an EPA Clean Water Act (CWA) National Pollutant Discharge
Elimination System (NPDES) new source permit and a U.S. Army Corps of
Engineers CWA section 404 and Rivers and Harbors Act section 10 permit.
The SEIS will also address issues related to the Alaska Surface Coal
Mining Control and Reclamation Act (ASCMCRA) permit, which governs all
aspects of the mining operation and infrastructure. The U.S. Army Corps
of Engineers and the State of Alaska are participating as cooperating
agencies in the NEPA process.
Alternatives: The alternatives to be evaluated include: The ``no
action'' alternative, wastewater discharge alternatives and alternative
discharge locations. In addition, the SEIS will evaluate mine access
road and conveyor alignment alternatives, and coal export terminal
alternatives. Additional alternatives may be developed based on
comments received during scoping.
Scoping: The public scoping period begins with the publication of
this Notice and concludes July 24, 2006. EPA invites Federal agencies,
Native Tribes, State and local governments, and members of the public
to comment on the scope of the SEIS. Scoping meetings for the purpose
of identifying issues to be evaluated in the SEIS will be held in Kenai
on July 10, in Anchorage on July 11, and in the Tyonek and Beluga
communities on July 12, 2006. The exact locations and times of the
meetings will be announced in local papers. The public is invited to
attend and identify issues that should be addressed in the SEIS. A
scoping document that explains in greater detail the project and
alternatives identified at this time will be sent to known interested
parties. The public can obtain a copy of the scoping document by
contacting Hanh Shaw at the phone number, e-mail address, and mailing
address listed at the above in this notice.
How to Comment: EPA invites public comment on the proposed scope of
this SEIS. Comments may be submitted by mail, electronic mail, or fax,
to Hanh Shaw at the contact information above, by July 24, 2006.
Estimated Date of DSEIS Release: February 2007.
Responsible Official: Ron Kreizenbeck, Deputy Regional Administrator.
Dated: June 6, 2006.
Robert W. Hargrove,
Division Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E6-8998 Filed 6-8-06; 8:45 am]