DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application Ready for Comments, Recommendations, Terms
and Conditions, and Prescriptions and Establishing a Revised Procedural
Schedule for Relicensing
May 18, 2006.
Take notice that the following hydroelectric application and
applicant-prepared environmental assessment has been filed with the
Commission and is available for public inspection.
a. Type of Applications: New Major Licenses.
b. Project Nos.: 12606-000 and 2545-091.
c. Date Filed: July 28, 2005.
d. Applicant: Avista Corporation.
[[Page 29948]]
e. Name of Projects: (1) Post Falls and (2) Spokane River
Development of the Spokane River.
f. Location: Post Falls--on the Spokane River and Coeur d'Alene
Lake in portions of Kootenai and Benewah counties, Idaho. The project
occupies Federal lands under the supervision of the U.S. Bureau of
Indian Affairs, and may occupy lands under the supervision of the U.S.
Forest Service and the U.S. Bureau of Land Management.
Spokane River Developments--on the Spokane River in portions of
Steven and Lincoln counties, Washington. No Federal lands are included.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Bruce F. Howard, License Manager, Avista
Corporation, 1411 East Mission, P.O. Box 3727, Spokane, Washington
99220-3727; telephone: (509) 495-2941.
i. FERC Contact: John S. Blair, at (202) 502-6092,
john.blair@ferc.gov.
j. Deadline for filing comments, recommendations, terms and
conditions, and prescriptions is 60 days from the issuance date of this
notice; reply comments are due 105 days from the issuance date of this
notice.
All documents (original and eight copies) should be filed with:
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
The Commission's Rules of Practice require all intervenors filing
with the Commission to serve a copy of that document on each person on
the official service list for the project. Further, if an intervenor
files comments or documents with the Commission relating to the merits
of an issue that may affect the responsibilities of a particular
resource agency, they must also serve a copy of the document on that
resource agency.
Comments, recommendations, terms and conditions, and prescriptions
may be filed electronically via the Internet in lieu of paper. The
Commission strongly encourages electronic filings. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
(http://www.ferc.gov)
under the ``e-Filing'' link.
k. This application has been accepted for filing.
l. The Post falls hydroelectric development, has a seasonal storage
capacity consisting of the 40,402 acre Coeur d'Alene Lake with a usable
storage capacity of 223,100 acre-feet. The facility is composed of a
431-foot-long, 31-foot-high dam across the north channel of the Spokane
River, a 127-foot-long, 25-foot-high dam across the south channel, and
a 215-foot-long, 64-foot-high dam across the middle channel; six 56-
foot-long, 11.25-foot-diameter penstocks; and a 6-unit powerhouse
integral to the middle channel dam with a generator nameplate capacity
of 14.75 megawatts.
The Spokane River Developments include four hydroelectric developments
(HED) with a total authorized capacity of 122.92 MW as follows:
(1) Upper Falls HED is a run-of-river facility consisting of a 366-
foot-long, 35.5-foot-high dam across the north channel of the Spokane
River; a 70-foot-long, 30-foot-high intake structure across the south
channel; an 800-acre-foot reservoir; a 350-foot-long, 18-foot-diameter
penstock; and a single-unit powerhouse with a generator nameplate
capacity of 10 MW.
(2) Monroe Street HED is a run-of-river facility consisting of a
240-foot-long, 24-foot-high dam; a 30-acre-foot reservoir; a 332-foot-
long, 14-foot-diameter penstock; and an underground single-unit
powerhouse with a generator nameplate capacity of 14.82 MW.
(3) Nine Mile HED is a run-of-river facility consisting of a 466-
foot-long, 58-foot-high dam; a 4,600 acre-foot reservoir; a 120-foot-
long, 5 foot-diameter diversion tunnel; and a 4-unit powerhouse with a
nameplate capacity of 26.4 MW.
(4) Long Lake HED is a storage-type facility consisting of a 593-
foot-long, 213-foot-high main dam; a 247-foot-long, 108-foot-high
cutoff dam; a 105,080-acre-foot reservoir; four 236-foot-long, 16-foot-
diameter penstocks; and a 4-unit powerhouse with a nameplate capacity
of 71.7 MW.
m. A copy of the application is available for review in the
Commission's Public Reference Room or may be viewed on its Web site:
http://www.ferc.gov,
using the ``eLibrary'' link. Enter the
docket number excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676, or for TTY,
(202) 502-8659. A copy is also available for inspection and
reproduction at the address in item h above.
You may also register online at http://www.ferc.gov/docs-filing/
esubscription.asp
to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
n. Anyone may submit comments or recommendations in accordance with
the requirements of Rules of Practice and Procedure, 18 CFR 385.210,
386.211, and 385.214. In determining the appropriate action to take,
the Commission will consider all comments and recommendations filed,
but only those who have filed a motion to intervene in accordance with
the Commission's Rules may become a party to the proceeding.
All filings must (1) bear in all capital letters the title
``COMMENTS,'' ``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' ``TERMS AND
CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, recommendations, terms and conditions or prescriptions must
set forth their evidentiary basis and otherwise comply with
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the
application directly from the applicant. A copy of all filings in
reference to this application must be accompanied by proof of service
on all persons listed in the service list prepared by the Commission in
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
o. Procedural Schedule (supercedes Procedural Schedule notice dated
August 5, 2005) The application will be processed according to the
following schedule. Revisions to the schedule may be made as appropriate.
Notice soliciting comments, recommendations, terms and conditions,
and prescriptions: May 18, 2006.
Comments, recommendations, terms and conditions, and prescriptions
due: 60 days from issuance date of this notice.
Reply comments on recommendations, terms and conditions, and
prescriptions due: 105 days from issuance date of this notice.
Notice of availability of draft EIS: December 30, 2006.
Notice of availability of final EIS: June 30, 2007.
Ready for Commission's decision on the application: September 30, 2007.
Magalie R. Salas,
Secretary.
[FR Doc. E6-7960 Filed 5-23-06; 8:45 am]