Jump to main content.


Environmental Impacts Statements; Notice of Availability

Note: EPA no longer updates this information, but it may be useful as a reference or resource.


 [Federal Register: May 26, 2006 (Volume 71, Number 102)]
[Notices]
[Page 30399-30400]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr26my06-73]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6675-5]

Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7167 or http://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements
Filed May 15, 2006 through May 19, 2006
Pursuant to 40 CFR 1506.9.
EIS No. 20060197, Final EIS, FHW, CO, US Highway 160, Transportation 
Improvements from Junction US 160/550 Durango--East to Bayfield, U.S. 
Army COE Section 404 Permit, La Plata County, CO, Wait Period Ends: 
June 26, 2006, Contact: Joseph R. Duran 720-963-3006.
EIS No. 20060198, Final EIS, AFS, MT, Helena National Forest Noxious 
Weed Treatment Project, Implementation, Lewis and Clark, Broadwater, 
Powell, Jefferson and Meagher Counties, MT, Wait Period Ends: June 26, 
2006, Contact: Dennis Heffner 406-495-3727.
EIS No. 20060199, Final EIS, AFS, MI, Huron-Manistee National Forests, 
Land and Resource Management Plan, Implementation, Several Counties, 
MI, Wait Period Ends: June 26, 2006, Contact: Jeffery G. Pullen 231-
775-3183.
EIS No. 20060200, Draft EIS, COE, 00, Programmatic--Ohio River Mainstem 
System Study, System Investment Plan (SIP) for Maintaining Safe, 
Environmentally Sustainable and Reliable Navigation on the Ohio River, 
IL, IN, OH, KY, PA and WV, Comment Period Ends: July 18, 2006, Contact: 
Veronica Rife 502-315-6785.
EIS No. 20060201, Final EIS, NRS, AR, Little Red River Irrigation 
Project, Develop a Water Management Plan for Irrigation Purposes in 
Seary, U.S. Army COE Section 404 Permit, Raft Creek, White County, AR, 
Wait Period Ends: June 26, 2006, Contact: Belinda Bell 501-301-3149.
EIS No. 20060202, Final EIS, NOA, 00, Snapper Grouper Fishery, 
Amendment 13C to the Fishery Management Plan, Phase Out Overfishing of 
Snowy Grouper, Golden Tilefish, Vermilion Snapper and Sea Bass, 
Implementation, South Atlantic Region , Wait Period Ends: June 26, 
2006, Contact: Dr. Roy E. Crabtree 727-824-5301.
EIS No. 20060203, Draft EIS, BLM, WY, Maysdorf Coal Lease by 
Application (LBA) Tract, (Federal Coal Application WYW154432), 
Implementation, Campbell Counties, WY, Comment Period Ends: July 25, 
2006, Contact: Nancy Doelger 307-261-7627.
EIS No. 20060204, Draft EIS, AFS, OR, Mt. Hood National Forest and 
Columbia River Gorge National Scenic Area, Site-Specific Invasive Plant 
Treatments, Forest Plan Amendments #16, Mt. Hood National 
Forest and Columbia River Gorge National Scenic Area, Clackamas, Hood 
River, Multnomah and Wasco Counties, OR, Comment Period Ends: July 13, 
2006, Contact: Jennie O'Connor 503-668-1645.
EIS No. 20060205, Draft EIS, AFS, PA, Allegheny National Forest, 
Proposed Revised Land and Resource Management Plan, Implementation, 
Elk, Forest, McKean and Warren Counties, PA, Comment Period Ends: 
August 28, 2006, Contact: William Connelly 814-723-5150.
EIS No. 20060206, Draft EIS, FRC, MS, Clean Energy Liquefied Natural 
Gas (LNG) Import Terminal and Natural Gas Pipeline Facilities, 
Construction and Operation, US Army COE Section 10 and 404 Permits, 
(FERC/EIS-0192D), Port of Pascagoula, Jackson County, MS, Comment 
Period Ends: July 10, 2006, Contact: Todd Sedmak 1-866-208-3372.
EIS No. 20060207, Draft EIS, FRC, MS, Casotte Landing Liquefied Natural 
Gas (LNG) Import and Interstate Natural Gas Transmission Facilities, 
Construction and Operation, U.S. Army COE Section 404 Permit,

[[Page 30400]]

(FERC/EIS-0193D), near the City of Pascagoula, Jackson County, MS, 
Comment Period Ends: July 10, 2006, Contact: Todd Sedmak 1-866-208-3372.
EIS No. 20060208, Draft EIS, AFS, 00, Heavenly Mountain Resort Master 
Plan Amendment 2005 (MPA 05), Improve and Enhance the Resorts Over 
Winter and Summer Recreation Opportunities, Special-Use-Permit, Lake 
Tahoe Basin, El Dorado County, CA and Douglas County, NV, Comment 
Period Ends: July 17, 2006, Contact: Matt Dickinson 530-543-2769.
EIS No. 20060209, Draft EIS, NPS, PA, Flight 93 National Memorial, 
Designation of Crash Site to Commemorate the Passengers and Crew of 
Flight 93, Implementation, Stonycreek Township, Somerset County, PA, 
Comment Period Ends: July 17, 2006, Contact: Jeff Reinbold 814-443-4557.
EIS No. 20060210, Final EIS, UAF, AZ, Barry M. Goldwater Range (BMGR), 
Integrated Natural Resources Management Plan (INRMP), Implementation, 
Yuma, Pima, and Maricopa Counties, AZ, Wait Period Ends: June 26, 2006, 
Contact: Carol Heathington 623-856-8492.
EIS No. 20060211, Draft EIS, DOE, 00, Strategic Petroleum Reserve 
Expansion, Site Selection of Five New Sites: Chacahoula and Clovelly, 
in Lafourche Parish, LA; Burinsburg, Claiborne County, MS; Richton, 
Perry County, MS; and Stratton Ridge, Brazoria County, TX and Existing 
Site Bayou Choctaw, Iberville Parish, LA, West Hackberry, Cameron and 
Calcasieu Parishes, LA; and Big Hill, Jefferson County, TX, Comment 
Period Ends: July 10, 2006, Contact: Donald Silawsky 202-586-1892.
EIS No. 20060212, Draft EIS, AFS, CA, Freeman Project, Reduce Hazardous 
Fuel and Improving Forest Health, Implementation, Lake Recreation Area, 
Beckworth Ranger District, Plumas National Forest, Plumas County, CA, 
Comment Period Ends: July 10, 2006, Contact: Sabrina Stadler 530-836-7141.
EIS No. 20060213, Draft EIS, CGD, MA, Northeast Gateway Deepwater Port 
License Application to Import Liquefied Natural Gas (LNG) (USCG-2005-
22219), Massachusetts Bay, City of Gloucester, MA, Comment Period Ends: 
July 10, 2006, Contact: Mark Prescott 202-267-0225.
EIS No. 20060214, Final EIS, NRC, NY, Generic--License Renewal of 
Nuclear Plants for Nine Mile Point Nuclear Station, Units 1 and 2, 
Supplement 24 to NUREG 1437, Implementation, Lake Ontario, Oswego 
County, NY, Wait Period Ends: June 26, 2006, Contact: Samuel Hernandez 
301-415-4049.
EIS No. 20060215, Final EIS, AFS, AK, Whistle Stop Project, Provide 
Access to Backcountry Recreation Area on National Forest, System (NFS) 
Lands, on the Kenai Peninsula between Portage and Moose Pass, Chugach 
National Forest, Kenai Peninsula Borough, AK , Wait Period Ends: June 
26, 2006, Contact: Adam McClory 907-754-2352.
EIS No. 20060216, Final EIS, IBR, 00, Programmatic--Platte River 
Recovery Implementation Program, Assessing Alternatives for the 
Implementation of a Basinwide, Cooperative, Endangered Species Recovery 
Program, Four Target Species: Whooping Crane, Interior Least Tern, 
Pipping Plover and Pallid Sturgeon, NE, WY, and CO, Wait Period Ends: 
June 26, 2006, Contact: Curt Brown 303-445-2096.

Amended Notices

EIS No. 20060191, Final EIS, FAA, FL, Panama City-Bay County 
International Airport (PFN), Proposed Relocation to a New Site, NPDES 
Permit and U.S. Army COE Section 404 Permit, Bay County, FL, Wait 
Period Ends: July 5, 2006, Contact: Virginia Lane 407-872-6331 Ext. 
129. Revision to FR Notice Published May 19, 2006: Comment Period 
Extended from June 19, 2006 to July 5, 2006.

    Dated: May 23, 2006.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E6-8146 Filed 5-25-06; 8:45 am]
BILLING CODE 6560-50-P 

 
 


Local Navigation


Jump to main content.