North Baja Pipeline, LLC; Notice of Availability/Completion of the Draft Environmental Impact Statement/Report and Draft Land Use Plan Amendment for the Proposed North Baja Pipeline Expansion Project
Note: EPA no longer updates this information, but it may be useful as a reference or resource.
[Federal Register: September 29, 2006 (Volume 71, Number 189)]
[Notices]
[Page 57501-57503]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr29se06-72]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[FERC Docket Nos. CP06-61-000; CP01-23-003]
North Baja Pipeline, LLC; Notice of Availability/Completion of
the Draft Environmental Impact Statement/Report and Draft Land Use Plan
Amendment for the Proposed North Baja Pipeline Expansion Project
September 22, 2006.
The environmental staffs of the Federal Energy Regulatory
Commission (FERC or Commission), the California State Lands Commission
(CSLC), and the Bureau of Land Management (BLM) (Agency Staffs) have
prepared the draft environmental impact statement/environmental impact
report and draft land use plan amendment (draft EIS/EIR/plan amendment)
to address North Baja Pipeline, LLC's (North Baja) proposed expansion
of its natural gas pipeline system.
The draft EIS/EIR/plan amendment was prepared as required by the
National Environmental Policy Act (NEPA), the California Environmental
Quality Act, and the Federal Land Management and Policy Act. The
purpose of this document is to inform the public and the permitting
agencies about the potential adverse and beneficial environmental
impacts of the proposed North Baja Pipeline Expansion Project (Project
or proposed Project) and its alternatives, and recommend mitigation
measures that would reduce the significant adverse impacts to the
maximum extent possible, and, where feasible, to a less than
significant level. The Agency Staffs have concluded that if the Project
is constructed and operated in accordance with applicable laws and
regulations, North Baja's proposed mitigation, and the Agency Staffs'
additional mitigation recommendations, it would be an environmentally
acceptable action.
The FERC is the lead Federal agency and will use the document to
consider the environmental impacts that could result if it issues North
Baja a Certificate of Public Convenience and Necessity and a
Presidential Permit amendment under sections 7 and 3, respectively, of
the Natural Gas Act. The CSLC is the lead State agency and will use the
document to consider North Baja's application to amend its existing
right-of-way lease across the State's Sovereign and School Lands in
conjunction with the environmental impacts that could result from any
part of the Project in California.
The BLM is participating as a cooperating agency in the preparation
of this document because the Project would cross Federal land under the
jurisdiction of the Palm Springs-South Coast, El Centro, and Yuma Field
Offices. The Bureau of Reclamation (BOR) is also a cooperating agency
in the preparation of this document because lands administered by the
BOR would be crossed by the Project. Under section 185(f) of the
Mineral Leasing Act of 1920, the BLM has the authority to issue Right-
of-Way Grants for all affected Federal lands. The draft EIS/EIR/plan
amendment will be used by the BLM to consider whether to amend North
Baja's existing Right-of-Way Grant and issue Temporary Use Permits for
the installation of approximately 67.4 miles of pipeline and ancillary
facilities across Federal lands managed by the BLM, the BOR, and the
U.S. Fish and Wildlife Service (FWS). The draft EIS/EIR/plan amendment
will also be used by the BLM to consider amending the California Desert
Conservation Area Plan (as amended), which would be necessary for
pipeline construction outside of designated utility corridors, as well
as amending the Yuma District Resource Management Plan, which would be
necessary for pipeline construction across the Milpitas Wash Special
Management Area.
The BLM proposes to adopt the draft EIS/EIR/plan amendment per
Title 40 Code of Federal Regulations (CFR) part 1506.3 to meet its
responsibilities under NEPA and its planning regulations per Title 43
CFR part 1610. The BLM will present separate Records of Decision for
the Right-of-Way Grant and the plan amendments for the North Baja
Pipeline Expansion Project after the issuance of the final
environmental impact statement/environmental impact report and proposed
land use plan amendment (final EIS/EIR/proposed plan amendment). The
concurrence or non-concurrence of the BOR and the FWS would be
considered in the BLM's decision.
The existing North Baja system is currently certificated by the
FERC to transport 512,500 dekatherms per day (Dthd) of natural gas in a
southbound direction. Once completed, the expanded system would be
capable of transporting up to 2,932,000 Dthd (2,753 million standard
cubic feet per day) of natural gas from planned liquefied natural gas
(LNG) storage and vaporization terminals located on the Baja California
coast in Mexico in a northbound direction for delivery to customers in
California and Arizona. In addition to the new volumes from the LNG
terminals, North Baja would continue to offer southbound gas
transportation service for several existing shippers.
The draft EIS/EIR/plan amendment addresses the potential
environmental effects of the construction and operation of the
following facilities proposed by North Baja:
? 79.8 miles of pipeline loop \1\ (B-Line) adjacent to North
Baja's existing pipeline (A-Line) consisting of 11.7 miles of 42-inch-
diameter pipeline extending from the existing Ehrenberg Compressor
Station at milepost (MP) 0.0 in La Paz County, Arizona to the existing
Rannells Trap at MP 11.7 in Riverside County, California, and 68.1
miles of 48-inch-diameter pipeline extending from Rannells Trap to an
interconnection at the U.S.-Mexico border at MP 79.8 in Imperial
County, California;
---------------------------------------------------------------------------
\1\ A loop is a segment of pipeline that is usually installed
adjacent to an existing pipeline and connected to it at both ends.
The loop allows more gas to be moved through the system.
---------------------------------------------------------------------------
? Less than 0.1 mile (about 20 feet) of 36-inch-diameter
pipeline (SoCal Gas Company [SoCal Gas]
Interconnect) to connect the B-
Line to the existing SoCal Gas system within the proposed Blythe Meter
Station site at MP 0.5 in Riverside County;
[[Page 57502]]
? 0.6 mile of 10-inch-diameter pipeline lateral \2\ (Blythe
Energy Interconnect Lateral [BEI Lateral]) extending from the proposed
Blythe Meter Station site to an interconnection with the existing
Blythe Energy Facility I supply pipeline in Riverside County;
---------------------------------------------------------------------------
\2\ A lateral pipeline typically takes gas from the main system
to deliver it to a customer, local distribution system, or another
interstate transmission system.
---------------------------------------------------------------------------
? 45.7 miles of 16-inch-diameter pipeline lateral (Imperial
Irrigation District [IID]
Lateral) extending from MP 74.5 of the B-Line
near the existing Ogilby Meter Station to the existing IID El Centro
Generating Station in Imperial County;
? Modifications at its existing Ehrenberg Compressor Station
and the existing Ogilby Meter Station to allow northbound flow of
natural gas;
? Metering modifications at its existing El Paso Natural Gas
Company (El Paso) Meter Station at the Ehrenberg Compressor Station
site to allow LNG-source gas to be delivered into the El Paso system;
? One meter station (Blythe Meter Station) in Riverside
County to measure gas delivery from the North Baja system to SoCal Gas
and the BEI Lateral;
? One odorant facility at the existing Ogilby Meter Station
to odorize the natural gas before delivery into the SoCal Gas system;
? One meter station (El Centro Meter Station) at the
existing IID El Centro Generating Station to measure gas delivery from
the North Baja system to the IID;
? One tap where the IID Lateral would connect to the B-Line
in Imperial County;
? Three pig \3\ launchers;
---------------------------------------------------------------------------
\3\ A pig is an internal tool that can be used to clean and dry
a pipeline and/or to inspect it for damage or corrosion.
---------------------------------------------------------------------------
? Four pig receivers;
? Nine remote manual valves with automatic shutdown
capability on the B-Line, adjacent to the existing A-Line valve sites;
and
? Four remote manual valves with automatic shutdown
capability on the IID Lateral.
Comment Procedures and Public Meetings
Any person wishing to comment on the draft EIS/EIR/plan amendment
is encouraged to do so. To expedite the Agency Staffs' receipt and
consideration of your comments, electronic submission of comments is
strongly recommended. See Title 18 CFR 385.2001(a)(1)(iii) and the
instructions on the FERC Internet Web site (http://www.ferc.gov) under
the eFiling link and the link to the User's Guide. Before you can
submit comments, you will need to create a free account by clicking on
``Sign-up'' under ``New User.'' You will be asked to select the type of
submission you are making. This type of submission is considered a
``Comment on Filing.'' Comments submitted electronically must be
submitted by December 28, 2006.
If you wish to mail comments, please mail your comments so that
they will be received in Washington, DC on or before December 28, 2006.
Please carefully follow these instructions to ensure that your comments
are received and properly recorded:
? Send an original and two copies of your comments to:
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888
First St., NE., Room 1A, Washington, DC 20426;
? Reference Docket Nos. CP06-61-000 and CP01-23-003;
? Label one copy of your comments for the attention of Gas 1, DG2E; and
? Send an additional copy of your letter to:
Tom Filler, California State Lands Commission, 100 Howe Avenue,
Suite 100 South, Sacramento, CA 95825.
Your letter to the CSLC should reference CA State Clearinghouse No.
2006081127.
In addition to or in lieu of sending written comments, the FERC,
the CSLC, and the BLM invite you to attend two public meetings the
Agency Staffs will conduct in the Project area to receive comments on
the draft EIS/EIR/plan amendment. Both meetings will begin at 7 p.m.
(PST), and are scheduled as follows:
------------------------------------------------------------------------
Date Location
------------------------------------------------------------------------
Tuesday, December 5, 2006................. Vacation Inn, 2015
Cottonwood Circle, El
Centro, CA 92243. (760) 352-
9700.
Wednesday, December 6, 2006............... Blythe City Council Chamber,
235 North Broadway, Blythe,
CA 92225. (760) 922-6161.
------------------------------------------------------------------------
These meetings will be posted on the FERC's calendar located at
http://www.ferc.gov/EventCalendar/EventsList.aspx. Interested groups
and individuals are encouraged to attend and present written or oral
comments on the draft EIS/EIR/plan amendment. Transcripts of the
meetings will be prepared.
After the comments are reviewed, any significant new issues are
investigated, and necessary modifications are made to the draft EIS/
EIR/plan amendment, a final EIS/EIR/proposed plan amendment will be
published and distributed by the Agency Staffs. The final EIS/EIR/
proposed plan amendment will contain the Agency Staffs' responses to
comments timely received on the draft EIS/EIR/plan amendment.
Comments will be considered by the FERC, the CSLC, and the BLM, but
will not serve to make the commenter a formal party to the proceeding.
Any person seeking to become a formal party to the proceeding must file
a motion to intervene pursuant to Rule 214 of the FERC's Rules of
Practice and Procedure (Title 18 CFR part 385.214).
Anyone may intervene in this proceeding based on the draft EIS/EIR/
plan amendment. You must file your request to intervene as specified
above.\4\ You do not need intervenor status to have your comments
considered and responded to.
---------------------------------------------------------------------------
\4\ Interventions may also be filed electronically via the
Internet in lieu of paper. See the previous discussion on filing
comments electronically.
---------------------------------------------------------------------------
The draft EIS/EIR/plan amendment has been placed in the public
files of the FERC and the CSLC and is available for public inspection at:
Federal Regulatory Energy Commission, Public Reference Room, 888 First
St. NE.; Room 2A, Washington, DC 20426; (202) 208-1371.
California State Lands Commission, 100 Howe Avenue, Suite 100 South,
Sacramento, CA 95825; (916) 574-1938.
The draft EIS/EIR/plan amendment is also available for viewing on
the FERC and CSLC Web sites at the Internet addresses below.
http://www.ferc.gov
http://www.slc.ca.gov
A limited number of copies of the draft EIS/EIR/plan amendment are
available from the FERC's Public Reference Room identified above. These
copies may be requested in hard copy or as .pdf files on compact disk.
In addition, copies of the draft EIS/EIR/plan amendment have been
mailed to Federal, State, and local government agencies; elected
officials; Native American tribes; affected landowners; local libraries
and newspapers; intervenors to the FERC's proceeding; and other
interested parties. Hard copies of the draft EIS/EIR/plan amendment can
be viewed at the following libraries in the Project area:
Yuma County Library District, 350 3rd Avenue, Yuma, AZ 85364.
Palo Verde Valley Library, 125 W. Chanslorway, Blythe, CA 92225.
El Centro Public Library, 539 State Street, El Centro, CA 92243.
[[Page 57503]]
Hemet Public Library, 510 E. Florida Avenue, Hemet, CA 92543.
Holtville City Library, 101 E. 6th Street, Holtville, CA 92250.
Imperial Public Library, 200 W. 9th Street, Imperial, CA 92251.
City of Rancho Mirage Public Library, 42-520 Bob Hope Drive, Rancho
Mirage, CA 92270.
Glen Avon Library, 9244 Galena Street, Riverside, CA 92509.
Palo Verde District Library, 701 Silver Spur Road, Rollins Hills
Estates, CA 90274.
Additional information about the Project is available from the
FERC's Office of External Affairs at 1-866-208-FERC or on the FERC
Internet Web site (http://www.ferc.gov) using the eLibrary link. Click
on the eLibrary link, click on ``General Search,'' and enter the docket
number excluding the last three digits in the Docket Number field. Be
sure you have selected an appropriate date range. For assistance,
please contact FERC Online Support at FERCOnlineSupport@ferc.gov or
toll free at 1-866-208-3676, or for TTY, contact (202) 502-8659. The
eLibrary link on the FERC Internet Web site also provides access to the
texts of formal documents issued by the FERC, such as orders, notices,
and rule makings.
In addition, the FERC now offers a free service called
eSubscription that allows you to keep track of all formal issuances and
submittals in specific dockets. This can reduce the amount of time you
spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. To register for this service, go to the eSubscription
link on the FERC Internet Web site.
Information concerning the involvement of the CSLC in the EIS/EIR
process may be obtained from Tom Filler, Project Manager, at (916) 574-
1938, or on the CSLC Internet Web site at http://www.slc.ca.gov.
Information concerning the proposed land use plan amendments and
the involvement of the BLM in the EIS/EIR and plan amendment process
may be obtained from Lynda Kastoll, Project Manager, at (760) 337-4421.
Magalie R. Salas,
Secretary.
[FR Doc. E6-16002 Filed 9-28-06; 8:45 am]
BILLING CODE 6717-01-P