Environmental Impacts Statements; Notice of Availability
Note: EPA no longer updates this information, but it may be useful as a reference or resource.
[Federal Register: February 23, 2007 (Volume 72, Number 36)]
[Notices]
[Page 8154-8155]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr23fe07-33]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6684-3]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or http://www.epa.gov/compliance/nepa/.
Weekly Receipt of Environmental Impact Statements Filed 02/12/2007
through 02/16/2007 Pursuant to 40 CFR 1506.9
EIS No. 20070052, Draft EIS, NPS, PA, Valley Forge National Historical
Park, General Management Plan, Implementation, King of Prussia, PA,
Comment Period Ends: 04/09/2007, Contact: Deirdre Gibson 610-783-1047
EIS No. 20070053, Draft EIS, AFS, ID, Sun Valley Resort (Bald Mountain)
2005 Master Plan--Phase I Project, Implementation, Special-Use-Permits,
Sawtooth National Forest, Blaine County, ID, Comment Period Ends: 04/
09/2007, Contact: Carol Brown 208-727-5000
EIS No. 20070054, Final EIS, NPS, UT, Utah Museum of Natural History,
Construction and Operation, New Museum Facility at University of Utah,
Salt Lake City, UT , Wait Period Ends: 03/26/2007, Contact: Roxanne
Runkel 303-969-2377
EIS No. 20070055, Draft EIS, AFS, ID, Idaho Cobalt Project, Development
of Two Underground Mines, a Waste Disposal Site and Associated
Facilities, Approval of Plan-of-Operation, Salmon-Cobalt Ranger
District, Salmon-Challis National Forest, Lemhi County, ID, Comment
Period Ends: 04/24/2007, Contact: Ray Henderson 208-756-5231
EIS No. 20070056, Draft EIS, FHW, LA, I-49 South Project, from Raceland
to the Westbank Expressway Route U.S. 90, Funding, Coast Guard Bridge
Permit, U.S. Army COE Section 10 and 404 Permits, Jefferson, Lafourche,
and St. Charles Parishes, LA, Comment Period Ends: 04/09/2007, Contact:
Mark Stinson 225-757-7617
EIS No. 20070057, Final EIS, FHW, NC, Winston-Salem Northern Beltway,
(Eastern Section) U.S. 52 south to I-40 Business and I-40 Business
south to U.S. 311, Improvements to the Surface Transportation Network,
TIP Project Nos. U2579 and U-2579A, Forsyth County, NC (THIS EIS
#20070057 AND EIS #20070058 ARE COMBINED IN A SINGLE
DOCUMENT.), Wait Period Ends:
[[Page 8155]]
03/26/2007, Contact: John F. Sullivan 919-856-4346
EIS No. 20070058, Second Final Supplement, FHW, NC, Western Section of
the Winston-Salem Northern Beltway, Updated Information, U.S. 158 north
to U.S. 52, TIP Project No. R-2247, Forsyth County, NC (THIS EIS
#20070058 AND EIS 20070057 ARE COMBINED IN A SINGLE DOCUMENT.)
, Wait Period Ends: 03/26/2007, Contact: John F. Sullivan 919-856-4346
EIS No. 20070059, Final EIS, NPS, NV, Clean Water Coalition Systems
Conveyance and Operations Program, (SCOP) Construction, Operation and
Maintenance, Boulder Islands North is the Selected Alternative, City of
Las Vegas, NV, Wait Period Ends: 03/26/2007, Contact: Michael Boyles
702-293-8978
EIS No. 20070060, Final EIS, AFS, WI, Twentymile Restoration Project
Area, Restore Northern Hardwood Forests to an Uneven-aged Condition,
Great Divide Ranger District, Chequamegon-Nicolet National Forest,
Ashland and Bayfield Counties, WI, Wait Period Ends: 03/26/2007,
Contact: Debra Proctor 715-634-4821
EIS No. 20070061, Draft EIS, BLM, CA, Mountain View IV Wind Energy
Project, Construction and Operation, Wind Turbine Generators on Public
Lands in Section 22 and 28 and Private Land Section 27, Right-of-Way
Grant and Conditional Use Permit in the City of Palm Springs, CA,
Comment Period Ends: 04/09/2007, Contact: Greg Hill 760-251-4840
EIS No. 20070062, Final EIS, NPS, NE, Niobrara National Scenic River
General Management Plan, Implementation, Brown, Cherry, Keya Paha and
Rock Counties, NE, Wait Period Ends: 03/26/2007, Contact: Paul Hedren
402-336-3970
EIS No. 20070063, Draft Supplement, USN, 00, Introduction of F/A 18 E/F
(Super Hornet) Aircraft, Updated Information, Construction and
Operation of an Outlying Landing Field, Naval Air Station (NAS) Oceana,
VA; Marine Corps Air Station (MCAS) Cherry Point, NC, Comment Period
Ends: 04/24/2007, Contact: Francine Blend 757-322-4332
EIS No. 20070064, Draft Supplement, FHW, AR, US 67 Construction, U.S.
67/167 to I-40 West/I-430 Interchange around the North Little Rock
Metropolitan Area, New and Updated Information, Funding, Pulaski
County, AR, Comment Period Ends: 04/12/2007, Contact: Randal Looney
501-324-6430
Dated: February 20, 2007.
Ken Mittelholtz,
Environmental Protection Specialist, Office of Federal Activities.
[FR Doc. E7-3112 Filed 2-22-07; 8:45 am]
BILLING CODE 6560-50-P
![[logo] US EPA](http://www.epa.gov/epafiles/images/logo_epaseal.gif)