Environmental Impacts Statements; Notice of Availability
Note: EPA no longer updates this information, but it may be useful as a reference or resource.
[Federal Register: January 19, 2007 (Volume 72, Number 12)]
[Notices]
[Page 2512-2513]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr19ja07-48]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6683-2]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or http://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 01/08/2007 through 01/12/2007
Pursuant to 40 CFR 1506.9.
EIS No. 20070007, Draft EIS, NPS, NM, Bandelier National Monument,
Ecological Restoration Plan, Reestablish Healthy, Sustainable
Vegetative Conditions within the Pinon-Juniper Woodland, Los Alamos and
Sandoval Counties, NM, Comment Period Ends: 03/19/2007, Contact: John
Mack 505-672-3861-Ext 568.
EIS No. 20070008, Draft EIS, AFS, 00, Great Basin Creek South Rangeland
Management Projects, Management of 12 Livestock Grazing Allotments,
Bridgeport Ranger District, Lyon and Mineral Counties, NV and Mono
County, CA, Comment Period Ends: 03/05/2007, Contact: David Loomis 775-
884-8132.
EIS No. 20070009, Final EIS, AFS, 00, Antelope-Pardee 500kV
Transmission Project, Construct, Operate and Maintain a New 25.6 mile
500kV Transmission Line, Right-of-Way Permit and Special Use
Authorization, Angeles National Forest, Los Angeles County, CA, Wait
Period Ends: 02/20/2007, Contact: John Boccio 415-703-2641.
EIS No. 20070010, Final EIS, FHW, LA, East-West Corridor Highway
Component, from I-130 to Louis Armstrong International Airport, to
Central Business District (CBD), Jefferson, Orleans and St. Charles
Parishes, LA, Wait Period Ends: 02/20/2007, Contact: Robert Mahoney
225-757-7624.
EIS No. 20070011, Draft EIS, FHW, MI, I-94 Jackson Freeway
Modernization Project, Improvements between Michigan State Route-60
(MI-60) and Sargent Road, Funding and NPDES and U.S. Army COE Section
404 Permits Issuance, Jackson County, MI, Comment Period Ends: 02/20/
2007, Contact: David Calabrese 517-702-1825.
Amended Notices
EIS No. 20060471, Draft EIS, FHW, IL, Prairie Parkway Study,
Transportation System Improvement between Interstate 80 (I-80) and
Interstate 88 (I-88) Grundy, Kendall and Kane Counties, IL, Comment
Period Ends: 02/28/2007, Contact: Matt Fuller 217-492-4625. Revision of
FR Notice Published 11/17/2006: Extending Comment Period from 01/16/
2007 to 02/28/2007.
EIS No. 20060490, Draft EIS, OSM, 00, Black Mesa Project, Revisions to
the Life-of-Mine Operation and Reclamation for the Kayenta and Black
Mesa Surface-Coal Mining Operations, Right-of-Way Grant, Mohave,
Navajo, Coconino and Yavapai Counties, AZ and Clark County, NV, Comment
Period Ends: 02/06/2007, Contact: Peter A.
[[Page 2513]]
Rutledge 303-844-1400 Ext. 1440. Revision to FR Notice Published 12/01/
2006: Extending Comment Period 01/22/2007 to 02/06/2007.
EIS No. 20060542, Draft EIS, FRC, 00, Spokane River and Post Falls
Hydroelectric Project, Applications for two New Licenses for Existing
14.75 (mw) Post Falls No. 12606 and 122.9 (mw) Spokane River No. 2545,
Kootenai and Benewah Counties, ID and Spokane, Lincoln and Stevens
Counties, WA, Comment Period Ends: 03/06/2007, Contact: John Blair 202-
502-6092. Revision of FR Notice Published 01/05/2007: Correction to
Comment Period from 02/20/2007 to 03/06/2007.
Dated: January 16, 2007.
Clifford Rader,
Environmental Protection Specialist, Office of Federal Activities.
[FR Doc. E7-695 Filed 1-18-07; 8:45 am]
BILLING CODE 6560-50-P
![[logo] US EPA](http://www.epa.gov/epafiles/images/logo_epaseal.gif)