Jump to main content.


Environmental Impacts Statements; Notice of Availability

Note: EPA no longer updates this information, but it may be useful as a reference or resource.



[Federal Register: January 4, 2008 (Volume 73, Number 3)]
[Notices]
[Page 861]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr04ja08-25]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6694-6]

Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or http://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements
Filed 12/24/2007 Through 12/28/2007
Pursuant to 40 CFR 1506.9.
EIS No. 20070547, Draft Supplement, COE, TX, Central City Project,
Proposed Modification to the Authorized Projects which provides Flood
Damage Reduction, Habitat Improvement, Recreation and Urban
Revitalization, Upper Trinity River Central City, Upper Trinity River
Basin, Trinity River, TX, Comment Period Ends: 02/19/2008, Contact:
Saji Alummuttil 817-886-1764.
EIS No. 20070548, Final EIS, NPS, CO, Rocky Mountain National Park, Elk
and Vegetation Management Plan, Implementation, Grand and Larimer
Counties, CO, Wait Period Ends: 02/04/2008, Contact: Vaughn L. Baker
970-586-1206.
EIS No. 20070549, Final EIS, BLM, UT, Chapita Wells-Stagecoach Area
Natural Gas Development, Drilling and Production Operations of Natural
Gas Wells and Associated Access Road, and Pipelines, Uintah County, UT,
Wait Period Ends: 02/04/2008, Contact: Stephanie Howard 435-781-4469.
EIS No. 20070550, Draft EIS, FHW, MN, US-14 Reconstruction Project,
Improvement to Truck Highway 14 from Front Street in New Ulm to
Nicollet County Road 6 in North Mankato Brown and Nicollet Counties,
MN, Comment Period Ends: 03/15/2008, Contact: Cheryl Martin 651-291-6120.
EIS No. 20070551, Final EIS, BLM, UT, Greater Deadman Bench Oil and Gas
Producing Region, Proposes to Develop Oil and Gas Resources, Right-of-
Way Grants and Applications for Permit to Drill, Vernal, Uintah County,
UT, Wait Period Ends: 02/04/2008, Contact: Stephanie Howard 435-781-4469.
EIS No. 20070552, Final EIS, FHW, MN, Scott County State Aid Highway
(CSAH) 21 Project, Extension from CSAH 42 in Prior Lake to CSAH 18 at
Southbridge Parkway in Shakopee, U.S. Army COE Section 404 Permit,
Scott County, MN, Wait Period Ends: 02/04/2008, Contact: Cheryl Martin
651-291-6120.
EIS No. 20070553, Final EIS, BLM, WY, Rawlins Field Office Planning
Area Resource Management Plan, Addresses the Comprehensive Analysis of
Alternatives for the Planning and Management of Public Land and
Resource Administered by (BLM), Albany, Carbon, Laramie and Sweetwater
Counties, WY, Wait Period Ends: 02/04/2008, Contact: Ken Peacock 307-
775-6113.
EIS No. 20070554, Final EIS, FRC, CO, High Plains Expansion Project,
(Docket No. CP07-207-000) Natural Gas Pipeline Facility, Construction
and Operation, U.S. Army COE 404, Weld, Adams, and Morgan Counties, CO,
Wait Period Ends: 02/04/2008, Contact: Andy Black 1-866-208-3372.
EIS No. 20070555, Draft EIS, DHS, CA, U.S. Border Patrol San Diego
Sector, Proposed Construction, Operation, and Maintenance of Tactical
Infrastructure, San Diego County, CA, Comment Period Ends: 02/19/2008,
Contact: Gregory Giddens 202-344-2450.
EIS No. 20070556, Final EIS, NGB, MS, Camp Shelby Joint Force Training
Center, Implementation of Installation Mission Support Activities,
Renewal of Special Use Permit, De Soto National Forest, in portions of
Forrest, George and Perry Counties, MS, Wait Period Ends: 02/04/2008,
Contact: Alisa Dickson 703-607-9620.
EIS No. 20070557, Final EIS, IBW, TX, PROGRAMMATIC--Rio Grande Flood
Control Projects, Proposing a Range of Alternatives for Maintenance
Activities and Future Improvements, along the Texas-Mexico Border, Wait
Period Ends: 02/04/2008, Contact: Daniel Borunda 915-832-4767.
EIS No. 20070558, Final EIS, NPS, VA, Great Falls Park General
Management Plan, Implementation, George Washington Parkway, Fairfax
County, VA, Wait Period Ends: 2/04/2008, Contact: David Vela 703-289-2500.

Amended Notices

EIS No. 20070450, Draft Supplement, WAP, 00, Big Stone II Power Plant
and Transmission Project, Addresses the Impacts of Changes to the
Proposed Action relative to Cooling Alternatives and the Use of
Groundwater as Backup Water Source, U.S. Army COE Section 10 and 404
Permits, Grant County, SD and Big Stone County, MN , Comment Period
Ends: 02/28/2008, Contact: Nancy Werdel 720-962-7251.
Revision of FR Notice Published 10/26/2007: Extending Comment Period
from 12/10/2007 to 02/28/2008
EIS No. 20070484, Draft EIS, FHW, 00, Interstate-94, I-43, I-894, and
WI-119 (Airport Spur) I-94/USH 41 Interchange to Howard Avenue, To
Address Freeway System's Deteriorated Conditions, Funding and U.S. Army
COE Section 404 Permit, Kenosha, Racine and Milwaukee Counties, WI and
Lake County, IL, Comment Period Ends: 01/25/2008, Contact: David Scott
608-829-7522.
Revision Notice Published on 11/16/2007: Extending Comment Period from
12/31/2007 to 01/25/2008

    Dated: December 31, 2007.
Clifford Rader,
Environmental Protection Specialist, Office of Federal Activities.
[FR Doc. E7-25638 Filed 1-3-08; 8:45 am]
BILLING CODE 6560-50-P

 
 


Local Navigation


Jump to main content.