State of Nevada; Denial of Petition for Rulemaking

Note: EPA no longer updates this information, but it may be useful as a reference or resource.



PDF Version (6 pp, 75K, About PDF)


[Federal Register: January 31, 2008 (Volume 73, Number 21)]
[Proposed Rules]
[Page 5762-5767]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr31ja08-17]

========================================================================
Proposed Rules
                                                Federal Register
________________________________________________________________________

This section of the FEDERAL REGISTER contains notices to the public of
the proposed issuance of rules and regulations. The purpose of these
notices is to give interested persons an opportunity to participate in
the rule making prior to the adoption of the final rules.

========================================================================



[[Page 5762]]



NUCLEAR REGULATORY COMMISSION

10 CFR Part 51

[Docket No. PRM-51-9]


State of Nevada; Denial of Petition for Rulemaking

AGENCY: Nuclear Regulatory Commission.

ACTION: Petition for rulemaking: denial.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC or Commission) is
denying a petition for rulemaking submitted by the State of Nevada
(PRM-51-9). The petition requests that NRC modify its regulation
setting criteria for adoption of an environmental impact statement
prepared by the Secretary of the Department of Energy in proceedings
for issuance of a construction authorization and materials license with
respect to a geologic repository. The petitioner asserts that the
current regulation must be ``corrected'' because it is at odds with a
recent court of appeals decision. Further, petitioner asserts that
certain litigation procedures that will be used in the proceedings to
consider the adoption question violate the National Environmental
Policy Act of 1969, as amended (NEPA). NRC is denying the petition
because the court found no reason for NRC to correct its adoption
criteria and because the petition does not demonstrate that NRC's
litigation procedures violate NEPA. Commissioner Gregory B. Jaczko's
vote on this denial is included in Appendix I to this notice.

ADDRESSES: Publicly available documents related to this petition,
including the petition for rulemaking, the comments received, and NRC's
letter of denial to the petitioner may be viewed electronically on
public computers in NRC's Public Document Room (PDR), 01F21, One White
Flint North, 11555 Rockville Pike, Rockville, Maryland. The PDR
reproduction contractor will copy documents for a fee.
    Publicly available documents created or received at NRC after
November 1, 1999, are also available electronically at the NRC's
Electronic Reading Room at http://www.nrc.gov/reading-rm/adams.html.
From this site, the public can gain entry into the NRC's Agencywide
Documents Access and Management System (ADAMS), which provides text and
image files of NRC's public documents. If you do not have access to
ADAMS or if there are problems in accessing the documents located in
ADAMS, contact the PDR reference staff at (800) 387-4209, (301) 415-
4737 or by e-mail to pdr@nrc.gov.

FOR FURTHER INFORMATION CONTACT: Jerry Bonanno, Office of the General
Counsel, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001,
telephone (301) 415-1328 or Toll Free: 1-800-368-5642, e-mail:
jxb5@nrc.gov.

SUPPLEMENTARY INFORMATION:

Introduction

    On April 8, 2005, the State of Nevada (petitioner or the State)
submitted a ``Petition by the State of Nevada to Amend 10 CFR 51.109''
(petition), which was docketed as a petition for rulemaking under 10
CFR 2.802 of the Commission's regulations (PRM-51-9). The petition was
noticed on August 12, 2005 (70 FR 47148) with a public comment period
that closed on October 26, 2005. Three comment letters were received.
The petition requests amendments to the Commission's regulation at 10
CFR 51.109 governing NRC's adoption of the Department of Energy's (DOE)
final environmental impact statement (FEIS), and any supplements
thereto, which accompanied the Secretary of Energy's (the Secretary)
recommendation to the President that the Yucca Mountain, Nevada (YM)
site be approved for the development of a geologic repository.
Petitioner believes that the current regulation is contrary to the
NEPA, the Nuclear Waste Policy Act of 1982, as amended (NWPA), and the
decision of the U.S. Court of Appeals for the District of Columbia
Circuit in Nuclear Energy Institute, Inc. v. Environmental Protection
Agency, 373 F.3d 1251 (D.C. Cir. 2004) (NEI).

Background

A. Statutory and Regulatory Background of Sec.  51.109

    Section 114(f)(4) of the NWPA provides that ``[a]ny [EIS] prepared
in connection with a repository proposed to be constructed by the
Secretary under this subtitle shall, to the extent practicable, be
adopted by the Commission in connection with the issuance by the
Commission of a construction authorization and license for such
repository'' (emphasis added). The statute further provides that ``[t]o
the extent such statement is adopted by the Commission, such adoption
shall be deemed to also satisfy the responsibilities of the Commission
under the [NEPA] and no further consideration shall be required, except
that nothing in this subsection shall affect any independent
responsibilities of the Commission to protect public health under the
Atomic Energy Act of 1954 (42 U.S.C. 2011 et seq.).'' In 1988-89, NRC
conducted a rulemaking to set out the standards and procedures that
would be used in licensing proceedings for determining whether NRC's
adoption of DOE's FEIS is practicable. See, 53 FR 16131; May 5, 1988
(proposed rule); 54 FR 27864; July 3, 1989 (final rule). In that
rulemaking, NRC determined that the NWPA had altered NRC's ordinary
NEPA responsibilities in such a manner as to narrow the scope of NRC's
independent review of environmental issues that had been decided by DOE
in its FEIS. As summarized by the Commission in the final rule,

    [T]he Commission continues to emphasize its view that its role
under NWPA is oriented toward health and safety issues and that, in
general, nonradiological environmental issues are intended to be
resolved in advance of NRC licensing decisions through the actions
of the Department of Energy, subject to Congressional and judicial
review in accordance with NWPA and other applicable law. The
Commission anticipates that many environmental questions would have
been, or at least could have been, adjudicated in connection with an
environmental impact statement prepared by DOE, and such questions
should not be reopened in proceedings before NRC.

54 FR at 27865.
    Accordingly, NRC's 1989 final rule established, in a new 10 CFR
51.109, ``Public hearings in proceedings for issuance of materials
license with

[[Page 5763]]

respect to a geologic repository,'' procedures and criteria for
implementing the statutory directive to adopt DOE's FEIS to the extent
practicable. Under Sec.  51.109(a)(1), the NRC staff must present its
position on whether it is practicable to adopt, without further
supplementation, DOE's FEIS upon publication of the notice of hearing
in the Federal Register. Under Sec.  51.109(a)(2), parties to a
proceeding are given the opportunity to submit contentions asserting
that it is not practicable to adopt:

    (a)(2) Any other party to the proceeding who contends that it is
not practicable to adopt the DOE [FEIS], as it may have been
supplemented, shall file a contention to that effect within thirty
(30) days after the publication of the notice of hearing in the
Federal Register. Such contention must be accompanied by one or more
affidavits which set forth factual and/or technical bases for the
claim that, under the principles set forth in paragraphs (c) and (d)
of this section, it is not practicable to adopt the DOE [FEIS], as
it may have been supplemented. The presiding officer shall resolve
disputes concerning adoption of the DOE [FEIS] by using, to the
extent possible, the criteria and procedures that are followed in
ruling on motions to reopen under Sec.  2.236 of this chapter.

10 CFR 51.109(a)(2)(2007).\1\ The criteria governing the practicability
of adoption are set forth in Sec.  51.109(c):
---------------------------------------------------------------------------

    \1\ In 2004, Sec.  51.109(a)(2) was revised to reference a new
section number for motions to reopen as part of the Commission's
revision of its rules of practice in adjudicatory proceedings. See
69 FR 2182, 2276 (January 14, 2004). The standards for reopening
were not changed.

    (c) The presiding officer will find that it is practicable to
adopt any environmental impact statement prepared by the Secretary
of Energy in connection with a geologic repository proposed to be
constructed under Title I of the Nuclear Waste Policy Act of 1982,
as amended, unless:
    (1)(i) The action proposed to be taken by the Commission differs
from the action proposed in the license application submitted by the
Secretary of Energy; and
    (ii) The difference may significantly affect the quality of the
human environment; or
    (2) Significant and substantial new information or new
considerations render such environmental impact statement
inadequate.

10 CFR 51.109(c) (2007).

B. DOE's FEIS

    The NWPA, inter alia, establishes a process for the
characterization, siting, construction, and operation of a geologic
repository at the YM site. As relevant here, when site characterization
activities are completed, the Secretary of Energy may recommend site
approval to the President and any such recommendation must be
accompanied by a FEIS. See, section 114(a)(1) of the NWPA. Then, the
President may recommend the site to the Congress and must include a
copy of the documents comprising the basis of the Secretary's
recommendation, including the FEIS. See, section 114(a)(2). The State
is then given an opportunity to submit a notice of disapproval of the
site designation which, however, may be overcome by a joint resolution
of the Congress approving the recommended repository site. See,
sections 115 and 116 of the NWPA. If the site designation is permitted
to take effect under the provisions of section 115, the Secretary of
Energy shall submit an application for a construction authorization to
NRC. See, section 114(b) of the NWPA. In February 2002, the Secretary
issued the Final Environmental Impact Statement for a Geologic
Repository for the Disposal of Spent Nuclear Fuel and High-Level
Radioactive Waste at Yucca Mountain, Nye County, Nevada and recommended
the YM site to the President. The President then recommended the YM
site to the Congress. In April 2002, the State of Nevada submitted a
notice of disapproval to the Congress. However, Congress approved the
site designation by a Joint Resolution signed by the President on July
23, 2002. Public Law 107-200, 116 Stat. 735 (2002) (codified at 42
U.S.C. 10135 note (Supp. IV 2004)).

C. The NEI Decision

    Thereafter, the State of Nevada sought court review of the
Secretary's decision to recommend the YM site to the President, the
President's decision to recommend the YM site to the Congress, and
DOE's FEIS, which had been used to support both recommendations. In
response, DOE argued that the Joint Resolution had rendered moot
Nevada's challenges to the Secretary's and the President's
recommendations, with the result that Nevada's claims that the FEIS was
inadequate could not be considered as part of the challenges to these
recommendations. Further, DOE argued that, insofar as the FEIS might be
used to support future DOE and NRC decisions, the FEIS was unripe for
review because there was no final agency action affecting the State at
that time.
    In the litigation resulting in the NEI decision, the State's
challenges to the Secretary's and the President's recommendations and
to the FEIS were combined with other issues raised by the State and
with other lawsuits concerning the YM repository, including challenges
to both the Environmental Protection Agency's final standards (66 FR
32,074; June 13, 2001) and NRC's final regulations for the proposed
geologic repository at YM (66 FR 55,732; November 2, 2001). However,
NRC's procedures and criteria for adoption of DOE's FEIS were not
issues raised in any of the lawsuits and NRC's rationale for adoption
of the Sec.  51.109 procedures and criteria was neither briefed nor
argued by NRC. NRC did describe in its brief its regulatory adoption
process in the context of an issue raised by Nevada concerning NRC's
regulation at 10 CFR 63.341, which required DOE to include the results
of its projections of peak dose in its FEIS.\2\ See, Brief for the
Federal Respondents, State of Nevada v. U.S. Nuclear Regulatory
Commission, Nos. 01-1116 and 03-1058, June 6, 2003, at 44-45. In
resolving this issue, the court noted NRC's statement ``that it has
imposed no categorical limitation on any challenge to DOE's peak dose
calculations and that, under its regulations, parties to the proceeding
may challenge the practicability of adopting aspects of DOE's EIS,
including the peak dose calculations, based on substantial new
information to the contrary.'' 375 F.3d 1251, at 1300 (internal
quotations omitted).
---------------------------------------------------------------------------

    \2\ In 2005, NRC proposed to eliminate Sec.  63.341 as part of
its proposed amendments to 10 CFR Part 63. See, 70 FR 53313
(September 8, 2005).
---------------------------------------------------------------------------

    In NEI, the court agreed with DOE that Congress' enactment of the
Joint Resolution had rendered moot issues raised concerning the
Secretary's and the President's recommendation of the YM site. See 373
F.3d at 1309. Thus, the court held that ``[i]nsofar as Nevada's instant
challenge to the FEIS is intended to reverse the decision to select the
Yucca site, the challenge is moot * * *'' 373 F.3d at 1312. However,
the court noted the anticipated use of the FEIS in future
decisionmaking related to YM, including its potential adoption by NRC
in NRC's licensing proceeding, and considered whether the court should
review the FEIS because it might be used to support future decisions.
The court determined that the FEIS was not ripe for review under the
two-part test used to determine ripeness: The fitness of the issue for
judicial decision and the hardship to the parties of withholding court
consideration. Under the first prong of the test, the court noted that
it was unclear to what extent NRC would adopt the FEIS and whether the
FEIS would require supplementation prior to any adoption. The court
concluded that ``[o]ur review of the FEIS therefore would benefit from
postponing consideration until the FEIS has been used to support a
specific, concrete, and final decision.'' 373 F.3d at 1313. Under

[[Page 5764]]

the second prong of the test, the court concluded that ``withholding
consideration of Nevada's substantive claims at this time imposes no
hardship on Nevada * * * [because] Nevada may raise its substantive
claims against the FEIS if and when NRC or DOE makes * * * a final
decision.'' Id. In reaching this conclusion as to hardship, the court
stated that ``we rely on the assurances of counsel for both NRC and DOE
at oral argument that Nevada will be permitted to raise its substantive
challenges to the FEIS in any NRC proceeding to decide whether to adopt
the FEIS and in any DOE proceeding to select a transportation
alternative.'' Id.

The Petition

    The petitioner agrees that Sec.  51.109 ``in most respects tracks
the language of [section 114(f)(4) of the NWPA]'' on which it is based.
Petition at 2. However, the petitioner claims that this regulation also
adds three special provisions not found in the statute: (1) Special
procedures for litigation of NEPA issues; (2) allowance for adoption of
DOE supplements to the FEIS; and (3) special standards that specify in
some detail precisely when NRC will adopt the FEIS. The petitioner
believes that the Commission must conduct a rulemaking to eliminate the
``special litigation procedures'' and to correct the ``special adoption
standards.'' The petition makes no further reference to the second
``special provision'' and suggests no rule change with respect to this
provision. There is no apparent reason why Congress would have intended
to exclude supplements to the FEIS in its requirement for NRC to adopt
DOE's FEIS to the extent practicable, so we do not regard this
provision of the regulation as being within the petition for
rulemaking.
    To correct the criteria for assessing the practicability of
adoption, petitioner requests that the Commission add a new paragraph
(h) to Sec.  51.109:

    Nothing in this section shall be construed to limit the ability
of any party or interested governmental participant to challenge in
a licensing hearing any environmental impact statement (including
any supplement thereto) prepared by the Secretary of Energy on the
ground that such statement violates NEPA or the regulations of the
Council on Environmental Quality, provided that the challenge is not
barred by traditional principles of federal collateral estoppel.
Collateral estoppel shall not bar the admission of a NEPA contention
if the standards in subparagraphs (c)(1) and (c)(2) of this section
are met, provided that the change in the proposed action or new
information or considerations became known after the litigation in
question.

    Petitioner further proposes that the Commission delete Sec. 
51.109(a)(2), with the result that the admission of NEPA contentions
will be guided by the same principles in 10 CFR 2.309(f) that apply to
other kinds of contentions.

Public Comments on the Petition

    Three comment letters were received on the petition. The Board of
Lincoln County Commissioners supports the petition for the reasons
advanced in the petition, noting that it expects to participate in an
NRC proceeding which will examine NRC's independent review of the FEIS.
The National Association of Regulatory Utility Commissioners (NARUC)
expressed the view that Nevada's substantive issues on the FEIS could
be considered in NRC's licensing proceeding without any need to amend
the regulations because, inter alia, ``the Court of Appeals provided
the State the right to have consideration be given to outstanding
concerns with the EIS prepared for the Yucca Mountain repository when *
* * the NRC prepares its own EIS for the licensing decision.'' \3\ DOE
does not think that Nevada's requested rulemaking is warranted because
``[t]he regulation at issue comports with NRC's responsibilities under
both NEPA and the NWPA, and nothing in the NEI case supports Nevada's
claim that the regulation must be revised.''
---------------------------------------------------------------------------

    \3\ It is not clear whether NARUC recognizes that NRC may adopt
DOE's EIS to the extent practicable, rather than prepare its own
EIS.
---------------------------------------------------------------------------

Reasons for Denial

A. The Adoption Standards in Sec.  51.109(c)

    With regard to the ``special adoption standards'' in Sec. 
51.109(c), petitioner notes that both Nevada and the Council on
Environmental Quality (CEQ) had objected to NRC's criteria for
determining that it is practicable to adopt the FEIS. In comments
submitted at the time of the 1988-89 rulemaking, Nevada and CEQ argued
that NEPA does not allow NRC to adopt the FEIS without a full and
independent review of the FEIS. Further, Nevada also disagreed, and
continues to disagree, with NRC's position in that rulemaking that in
the NWPA, Congress intended to alter NRC's ordinary NEPA obligations
and lessened the need for NRC to conduct a fully independent review of
the FEIS prior to adoption. In support of its position, the petitioner
cites the statements of two Senators made during the congressional
debates leading to the NWPA, statements considered by NRC in its
rulemaking but rejected as ``less illuminating'' than the legislative
history stemming from the House of Representatives' consideration of
the issues. See, 53 FR 16137.
    The State's main basis for requesting rulemaking stems from the NEI
court's discussion of NRC's potential adoption of the FEIS. The
petitioner notes the court's observations that Nevada may raise its
substantive claims against the FEIS when it is used by NRC to support a
future construction authorization or licensing decision, and that NRC
counsel had assured the court that Nevada would be permitted to raise
its substantive challenges to the FEIS in any NRC proceeding to decide
whether to adopt the FEIS. The petitioner further notes the court's
statement that NWPA's mandate that the FEIS be adopted by NRC ``to the
extent practicable'' * * * ``cannot reasonably be interpreted to permit
NRC to premise a construction-authorization or licensing decision upon
an EIS that does not meet the substantive requirements of the NEPA or
[CEQ's] NEPA regulations.'' 373 F.3d at 1314.
    Finally, the petitioner notes the court's rejection of the position
taken in a letter from NRC counsel to the court that Sec.  51.109(c)
only affected issues that could be raised and litigated in NRC
administrative proceedings and not issues that could be raised on
judicial review. See, Petition at 5; 373 F.3d 1314. Rather, the court
stated, ``Nevada's claims have not been adjudicated on the merits here
and presumably will not have been passed upon by any court prior to the
relevant NRC proceedings. The claims thus would certainly raise `new
considerations' with regard to any decision to adopt the FEIS.'' Id.
The petitioner believes that ``any Commission interpretation of 10 CFR
51.109 at odds with counsel's representation at oral argument would
clearly be unlawful'' and asserts that ``[NRC's] current regulation is
directly at odds with [its counsel's and the court's] interpretation,''
so that the Commission must correct the regulation. Petition at 5-6.
    Petitioner's assertion that Sec.  51.109(c) must be ``corrected''
because it is ``directly at odds'' with the interpretation of this
regulation by the NEI court directly contradicts what the court itself
said on the subject of any need for the Commission to amend its
regulations. The court stated:

    Government counsel's unequivocal representation to the court
during oral argument that Nevada will not be foreclosed from raising
substantive claims against the FEIS in administrative proceedings
comports with the terms of the regulation and reflects a reasonable
and compelling interpretation.

[[Page 5765]]

Therefore, on the record at hand, there is no reason to assume that
the regulation will bar consideration of Nevada's substantive claims
in the relevant NRC administrative proceedings.

373 F.3d at 1314.
    Far from suggesting that NRC's regulation needed to be amended to
accommodate the court's interpretation of the regulation, the court
expressed its satisfaction that there was no reason to assume that the
present language of the regulation would bar consideration of Nevada's
substantive claims. This conclusion follows the court's explicit
consideration of the language of the Sec.  51.109(c) criteria. The
court focused on the second criterion; i.e., that it might not be
practicable for NRC to adopt the FEIS if ``significant and substantial
new information or new considerations render such environmental impact
statement inadequate.'' The court noted that ``Government counsel
assured the court that NRC will not construe the `new information or
new considerations' requirement to preclude Nevada from raising
substantive claims against the FEIS in administrative proceedings.''
Id. Further, the court observed that ``Nevada's claims have not been
adjudicated on the merits here and presumably will not have been passed
upon by any court prior to the relevant NRC proceedings. The claims
thus would certainly raise `new considerations' with regard to any
decision to adopt the FEIS.'' Id.\4\ There is no need for the
Commission to expend the resources needed for a rulemaking to
``correct'' a rule which the court gave no indication of needing
correction. NRC will treat Nevada's substantive claims against the FEIS
as ``new considerations'' within the framework of Sec.  51.109(c).
---------------------------------------------------------------------------

    \4\ At the same time, the court recognized that ``[t]he NWPA's
mandate that the FEIS be adopted by NRC `to the extent practicable'
is intended to avoid duplication of the environmental review
process.'' 373 F.3d 1251.
---------------------------------------------------------------------------

    Although the petitioner frames its request for correction of Sec. 
51.109(c) in terms of a supposed need to bring the regulation into line
with the views of the court, the petitioner may actually be seeking to
raise once again the issues the State and CEQ raised in comments made
during the 1988-89 rulemaking. The petition raises no issues that were
not raised and fully considered in that rulemaking. The Commission's
rationale for the adoption criteria issued as part of that rulemaking
was not before the court in NEI and the court, as explained above,
found nothing amiss with the criteria. The court's decision presents no
reasons for the Commission to reexamine the basis of that rulemaking.

B. The Litigation Procedures in Sec.  51.109(a)(2)

    With regard to the ``special litigation procedures,'' the
petitioner notes that Sec.  51.109(a)(2) conditions the admissibility
of a contention which asserts that NRC should not adopt the FEIS on
satisfaction, to the extent possible, of the standards for reopening a
closed record under 10 CFR 2.326. The petitioner asserts that the
principal difference between this standard and the contention standard
in 10 CFR 2.309(f) that applies to other issues is that the former
requires submission of admissible evidence, while the latter does not.
The petitioner asserts that NRC's creation of ``special litigation
procedures'' violates NEPA: ``Section 102(2)(C) of NEPA requires that
an FEIS must be considered in the `existing agency review processes'
[emphasis added], not some different review process applicabl[e] only
to NEPA where interested persons must satisfy additional pleading
requirements that would otherwise not apply.'' Petition at 6 (citing
Calvert Cliffs, 449 F.2d 1109 (D.C. Cir. 1971); 40 CFR 1505.1; Aberdeen
& Rockfish R. Co. v. SCRAP, 422 U.S. 289, 320 (1975)).
    The relevant portion of section 102(2)(C) of the NEPA states that
copies of the requisite ``detailed statement'' must ``accompany the
proposal through the existing agency review processes.'' \5\ This
language does not require that an agency establish one uniform agency
process for all NEPA reviews. Here, NRC has adopted a contention
standard in Sec.  51.109(a)(2) which takes account of the NWPA's effect
on its NEPA responsibilities as explained in its 1988-89 rulemaking. In
the relevant portion of the Calvert Cliffs decision, the question
before the court was ``whether the [Atomic Energy] Commission is
correct in thinking that its NEPA responsibilities may be carried out
in toto outside the hearing process--whether it is enough that
environmental data and evaluations merely accompany the application
through the review process, but receive no consideration whatever from
the hearing board.'' Calvert Cliffs, 449 F.2d at 1117 (internal
quotation marks omitted). In the discussion that follows, the court
focused on the meaning of the term ``accompany,'' not whether changes
in agency procedures for considering NEPA issues would be inconsistent
with the ``existing agency review process'' language. The court
concluded that the word ``accompany'' meant that the detailed statement
must be considered during the agency review process. In Aberdeen, the
Court held that an oral hearing held before an agency made a
recommendation or report on a proposal for Federal action was not an
``existing agency review process'' under section 102(2)(C) of the NEPA
and thus, a FEIS was not required to be available during this hearing.
See, 422 U.S. at 320-21. Thus, the Supreme Court's discussion in
Aberdeen focuses on when the FEIS must be made available, not whether
the term ``existing agency review process'' means that one contention
standard must apply to all NEPA reviews in all cases before an agency.
In short, the case law cited by the petitioner does not provide a
reason for NRC to delete Sec.  51.109(a)(2) from its regulations.
---------------------------------------------------------------------------

    \5\ The CEQ regulation at 40 CFR 1505.1 is based on the
statutory language and requires that agency procedures require
``that relevant environmental documents * * * accompany the proposal
through existing agency review processes so that agency officials
use the statement in making decisions.''
---------------------------------------------------------------------------

Conclusion

    The NEI court found no need for NRC to amend its regulations for
the purpose of allowing the State to have its substantive claims
examined in NRC's licensing proceeding for a potential YM repository.
Petitioner's claims that NRC's adoption criteria violate the NEPA or
the NWPA were addressed in the 1988-89 rulemaking and petitioner offers
no new arguments for the Commission's consideration. Nor does the
petitioner provide adequate legal support for NRC to amend its
litigation procedures. Given this, it would be an unwise expenditure of
resources for the Commission to conduct a rulemaking on this matter.
    For these reasons, the Commission denies PRM-51-9.

    Dated at Rockville, Maryland, this 25th day of January 2008.

    For the Nuclear Regulatory Commission.
Annette L. Vietti-Cook,
Secretary of the Commission.

Appendix I--Commissioner Jaczko's Comments on SECY-07-0159, Denial of a
Petition for Rulemaking (PRM-51-9)--State of Nevada

    I approve in part and disapprove in part the recommendation to
proceed with option 2 which would deny the rulemaking petition while
offering the assurance that the NRC will interpret the existing
regulations to allow substantive claims to the Department of
Energy's (DOE) Final Environmental Impact Statement (FEIS). Instead,
I approve a combination of options 1 and 2. The original regulations
governing the agency's review of the FEIS were based upon an
assumption of how the site selection process for a potential
repository would unfold. But because the judicial review of
environmental

[[Page 5766]]

issues did not happen as we envisioned, I believe we should grant
the petition and fix the corresponding regulations to appropriately
reflect that the entire FEIS will be open for litigation in any NRC
administrative proceeding regarding a repository application. At the
same time, I believe the notice of the proposed rule should explain
that the agency will interpret the regulations in a manner
consistent with this approach should the rulemaking not be completed
in time for a hearing on a potential Yucca Mountain license
application.
    Based upon the history of this issue, I think granting the
petition and amending our regulations is the right answer in this
case. First, it is important to remember that the NRC could have
originally interpreted the Nuclear Waste Policy Act (NWPA) to allow
the NRC to handle the adoption of DOE's FEIS in the same manner it
currently handles the adoption of any other federal agency EIS in
the NEPA review process. The NWPA's direction to avoid duplicative
environmental analysis does not necessarily equate to a direction to
eliminate most, if not all, of the FEIS from the NRC's hearing
process. I believe we should treat DOE's FEIS in the same manner as
we treat any other FEIS submitted by a similarly situated regulated
entity. In this case, that would mean defending the agency's
independent review of the entire FEIS--not just limited portions of
it--in the NRC's administrative proceedings. Commenters, including
the Council on Environmental Quality, said as much in comments to
this rulemaking and I find their logic persuasive. Had the agency
opted for that interpretation in the proposed rulemaking, perhaps we
would not find ourselves facing this petition today.
    NRC's rationale for not doing so, however, while not ideal, made
sense in the context of what the agency thought would happen with
the FEIS. According to the rulemaking history, section 51.109 of
NRC's regulations was based, at least in large part, upon the theory
that the administrative litigation of NEPA issues at the NRC should
be limited because many of these issues should have already had the
opportunity to be litigated in another forum. Thus, legal doctrines
which prevent issues and claims from being re-litigated, such as res
judicata and collateral estoppel, would prevent the re-litigation of
these issues in NRC hearings. This was premised upon NRC's
expectation that an interested person would have had an opportunity
to legally challenge DOE's FEIS after it was used to support the
recommendations of Yucca Mountain as a site for a repository by the
Secretary of Energy and the President.
    With that expectation in mind, the regulations were then
designed to ensure that the environmental issues in any NRC
proceeding on the proposed repository would appropriately focus on
issues that were new--that were not able to be raised at the earlier
opportunity to challenge the FEIS. So the regulations adopted in
section 51.109 focused not on the entire FEIS, as would be the
normal NRC practice, but on the NRC's decision to adopt the FEIS.
The regulations limited challenges to NRC's adoption decision to
those issues that had changed from the original application, or that
were issues raising ``significant and substantial new information''
since that earlier opportunity to challenge the FEIS. This makes
sense if any of the other issues regarding the FEIS had already had
the opportunity to be challenged. Given that presumption, it also
explains why the regulations direct the Board to use the higher
standards governing a motion to reopen when ruling upon the issues
raised regarding adoption of the FEIS--because litigating the FEIS
in NRC's administrative proceeding was seen as re-opening the record
on an already litigated FEIS.
    All that being said, as is often the case, actual events
regarding judicial review of environmental issues transpired
differently. Instead of the FEIS being used to support the
recommendation of Yucca Mountain as a site for a repository, there
was a Joint Resolution of Congress approving the Yucca Mountain site
designation. This change of events, according to the Federal Court
of Appeals decision in Nuclear Energy Institute, Inc. v.
Environmental Protection Agency, 373 F.3d 1251 (D.C. Circuit 2004),
rendered any such challenge to the FEIS' support for the Yucca
Mountain site moot; and to the extent the NRC may rely upon the
FEIS, rendered challenges unripe because the NRC had not reached a
decision regarding adopting or relying upon the FEIS in a way that
could have yet harmed the parties.
    It was part of this discussion that led the NRC and DOE to
assure the court that the parties would have an opportunity during
NRC's administrative hearing to raise substantive challenges to the
FEIS. And it is this assurance from NRC counsel that generated the
petition for rulemaking. In essence, the petitioners do not
understand how NRC's current regulations can be in accord with the
assurance the court relied upon--that parties would have the
opportunity at the NRC to substantively challenge the FEIS. Because
current NRC regulations limit challenges to NRC's decision about
adoption of the FEIS rather than the FEIS itself; and further limit
those challenges to require they be based upon significant and
substantial new information, it is easy to see how our stakeholders
might be confused. Add to that the direction in the current
regulations that the Boards are directed to review any challenge to
the decision regarding adoption using the standards that govern re-
opening a record--which is an intentionally higher bar for review--
and there can be little question that the current regulations are
confusing in light of the discussion in front of the court and the
relied upon assurance that substantive issues regarding the FEIS
could, in fact, be raised in NRC proceedings.
    For all of these reasons, it appears to me that the best way to
transparently resolve the real question presented--the question of
what issues surrounding the FEIS can be challenged in a prospective
hearing on an application for a construction authorization--is to
grant this petition and ensure that the regulations transparently
capture precisely how the environmental review will be conducted in
NRC's administrative proceeding. The earlier rulemaking was based
upon assumptions, but we can now answer the questions with the
benefit of knowing now what we did not know then.
    I recognize that the timing of the agency's decision on this
petition is not ideal because an application for a repository may be
submitted before this rulemaking would end. That is especially
unfortunate in this particular situation where the petition was
filed in 2005. Had we granted this petition at the close of the
public comment period in October 2005, we likely would now be voting
on the final rule instead of voting on this petition. I am hopeful
that the staff's work to improve the rulemaking process will include
ways to improve the timeliness of the petition process so we are not
in this unfortunate position in the future.
    But we are where we are, and with that in mind, I believe the
notice that grants the petition for rulemaking should indicate that,
if the rulemaking is not resolved prior to the receipt of an
application for a repository, the agency intends to interpret the
regulations in a manner consistent with the court's decision--as the
staff has drafted in the notice accompanying option 2--with some
additional clarification. The notice should also explain that
section 51.109(c), which indicates that challenges to the NRC's
adoption decision are to be based upon ``significant and substantial
new information'', will be interpreted in a manner that recognizes,
as the court did, that claims regarding DOE's FEIS have not been
adjudicated on the merits and thus, would certainly raise ``new
considerations'' with regard to any decision to adopt the FEIS. The
notice should also make it clear that the current direction in
section 51.109(a) that the presiding officer should, to the extent
possible, use the criteria for ruling on a motion to reopen in
resolving disputes regarding the adoption of the FEIS, is rendered
moot. The notice should clearly state that it is not possible to
rely upon criteria used for a motion to reopen given the relevant
history of this matter where there was no opportunity to originally
open these issues. Instead, the contention admissibility should be
determined by reliance upon section 2.309(f), the agency's current
contention standard.
    I appreciate that because these regulations have not yet been
interpreted and applied in any proceeding, the agency has more
flexibility to interpret them now without recreating them in a new
rulemaking--and thus the recommendation for option 2. But this is
not a situation where the regulations intent could have been
clearer; this is a situation where the interpretation of the
regulations will essentially require the agency to exercise great
latitude in applying them in a manner consistent with the discussion
in court. Transparency should dictate that we, at least, try to
correct this situation through the appropriate rulemaking channels
regardless of the impacts of the timing of this decision. We should
not let the prospect of a potential application complicate what is
clearly the right answer. We can and should deal with the possible
complications of an intervening application

[[Page 5767]]

by providing appropriate guidance should the rulemaking not resolve
itself in time. But the two are not mutually exclusive and thus, I
support a combination of options 1 and 2--granting the petition and
clarifying in the notice the agency's regulatory interpretation of
the existing regulations should they be required to be used prior to
completion of the rulemaking.
    Also, this paper should be reviewed for a release determination
and, at a minimum, the voting record and SRM from this paper should
be made publicly available five business days after the letter is
sent to the petitioner, as is current practice for release of
information regarding decisions on rulemaking petitions.
    Gregory B. Jaczko.

[FR Doc. E8-1751 Filed 1-30-08; 8:45 am]

BILLING CODE 7590-01-P

 
 