National Oil and Hazardous Substance; Pollution Contingency Plan; National Priorities List

Note: EPA no longer updates this information, but it may be useful as a reference or resource.


PDF Version (6 pp, 124K, About PDF)

[Federal Register: July 27, 2009 (Volume 74, Number 142)]
[Rules and Regulations]
[Page 36943-36948]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr27jy09-5]

=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 300
[EPA-HQ-SFUND-2009-0501; FRL-8934-2]

National Oil and Hazardous Substance; Pollution Contingency Plan;
National Priorities List

AGENCY: Environmental Protection Agency.
ACTION: Direct Final Notice of Deletion of the Southern California Edison,
Visalia Pole Yard Superfund Site from the National Priorities List.

-----------------------------------------------------------------------

SUMMARY: The Environmental Protection Agency (EPA) Region IX, is
publishing a Direct Final Notice of Deletion for the Southern
California Edison (SCE), Visalia Pole Yard Superfund Site (Site)
located in northeastern Visalia, Tulare County, California, from the
National Priorities List (NPL). The NPL, promulgated pursuant to
Section 105 of the Comprehensive Environmental Response, Compensation,
and Liability Act (CERCLA) of 1980, as amended, is an appendix of the
National Oil and Hazardous Substances Pollution Contingency Plan (NCP).
This direct final deletion is being published by EPA with the
concurrence of the State of California, through the Department of Toxic
Substance Control (DTSC), because EPA has determined that all
appropriate response actions under CERCLA, other than operation,
maintenance, and five-year reviews, have been completed. However, this
deletion does not preclude future actions under Superfund.

DATES: This direct final deletion is effective September 25, 2009
unless EPA receives adverse comments by August 26, 2009. If adverse
comment(s) are received, EPA will publish a timely withdrawal of the
Direct Final Deletion in the Federal Register informing the public that
the deletion will not take effect.

ADDRESSES: Submit your comments, identified by Docket ID no. EPA-HQ-
SFUND-2009-0501 by one of the following methods:

[[Page 36944]]

    • http://www.regulations.gov. Follow online instructions for
submitting comments.
    • E-mail: lane.jackie@epa.gov.
    • Fax: (415) 947-3528.
    • Mail: Jackie Lane, Community Involvement Coordinator, U.S. EPA
Region IX (SFD 6-3), 75 Hawthorne Street, San Francisco, California 94105.
    • Phone: (415) 972-3236.
    • Hand delivery: U.S. EPA Region IX (SFD 6-3), 75 Hawthorne
Street, San Francisco, California 94105. Deliveries are only accepted
during regular office days and hours of operation (Monday through
Friday, 8 a.m. to 5 p.m.). Special arrangements will need to be made
with EPA staff for deliveries of boxed information.
    Instructions: Direct your comments to Docket ID no. EPA-HQ-SFUND-
2009-0501 EPA's policy is that all comments received will be included
in the public docket without change and may be made available online at
http://www.regulations.gov, including any personal information
provided, unless the comment includes information claimed to be
Confidential Business Information (CBI) or other information whose
disclosure is restricted by statute. Do not submit information that you
consider to be CBI, or otherwise protected, through http://
www.regulations.gov or e-mail. The http://www.regulations.gov Web site
is an ``anonymous access'' system, which means that EPA will not know
your identity or contact information unless it is provided in the body
of your comment. If you send an e-mail comment directly to EPA, without
going through http://www.regulations.gov, your e-mail address will be
automatically captured and included as part of the publicly available
docket on the Internet. EPA recommends that all submittals include your
name and other contact information (i.e., e-mail and/or physical
address and phone number). Please note that electronic file submittals
should be free of any physical defects and computer viruses and avoid
the use of special characters and any form of encryption. If technical
difficulties prevent EPA from reading your comment and cannot contact
you for clarification, EPA may not be able to consider your comment.
    Docket: All documents in the docket are listed in the http://
www.regulations.gov index; however, some information is not publicly
available (e.g., CBI or other information restricted by disclosure
statute). Certain other materials, such as copyrighted materials, will
be publicly available only in hard copy. All other publicly available
docket materials are available either electronically http://
www.regulations.gov or hard copy at the Site Information repositories below:

U.S. EPA Superfund Records Center, 95 Hawthorne Street, San Francisco,
California 94105-3901, (415) 536-2000.
Tulare County Public Library, 200 West Oak Street, Visalia, CA 93291,
(818) 952-0603.

FOR FURTHER INFORMATION CONTACT: Charnjit Bhullar, Remedial Project
Manager, U.S. EPA Region IX (SFD 7-3), 75 Hawthorne Street, San
Francisco, California 94105, (415) 972-3960.

SUPPLEMENTARY INFORMATION:

Table of Contents

I. Introduction
II. NPL Deletion Criteria
III. Deletion Procedures
IV. Basis for Site Deletion
V. Deletion Action

I. Introduction

    EPA Region IX is publishing this Direct Final Notice of Deletion of
the Southern California Edison, Visalia Pole Yard Superfund Site (EPA
ID No. CAD980816466), hereinafter VPY or Site, from the National
Priorities List (NPL). The NPL constitutes Appendix B of 40 CFR part
300, which is the Oil and Hazardous Substances Pollution Contingency
Plan (NCP), which EPA promulgated pursuant to section 105 of the
Comprehensive Environmental Response, Compensation and Liability Act
(CERCLA) of 1980, as amended. EPA maintains the NPL as the list of
sites that appear to present a significant risk to public health,
welfare, or the environment. Sites on the NPL may be the subject of
remedial actions financed by the Hazardous Substance Superfund (Fund).
As described in 300.425(e)(3) of the NCP, sites deleted from the NPL
remain eligible for Fund-financed remedial actions if conditions at a
deleted site or new information warrant such action.
    Because EPA considers this action to be noncontroversial and
routine, this action will be effective September 25, 2009 unless EPA
receives adverse comments by August 26, 2009. Along with this direct
final Notice of Deletion, EPA is co-publishing a Notice of Intent to
Delete in the ``Proposed Rules'' section of the Federal Register. If
adverse comments are received within the 30-day public comment period
on this deletion action, EPA will publish a timely withdrawal of this
direct final Notice of Deletion before the effective date of the
deletion, and the deletion will not take effect. EPA will, as
appropriate, prepare a response to comments and continue with the
deletion process on the basis of the Notice of Intent to Delete and the
comments already received. There will be no additional opportunity to comment.
    Section II of this document explains the criteria for deleting
sites from the NPL; Section III discusses the procedures that EPA is
using for this action; Section IV discusses how the Southern California
Edison, Visalia Pole Yard Superfund Site meets the NPL deletion criteria;
and Section V discusses EPA's action to delete the Site from the NPL.

II. NPL Deletion Criteria

    The NCP establishes the criteria that EPA uses to delete sites from
the NPL. In accordance with 40 CFR 300.425(e), sites may be deleted
from the NPL where no further response is appropriate. In making such a
determination pursuant to 40 CFR 300.425(e), EPA will consider, in
consultation with the state, whether any of the following criteria have
been met:
    (1) Responsible parties or other parties have implemented all
appropriate response actions required;
    (2) All appropriate response under CERCLA has been implemented, and
no further response action by responsible parties is appropriate; or
    (3) The remedial investigation has shown that the release poses no
significant threat to public health or the environment and, therefore,
taking of remedial measures is not appropriate.
    Pursuant to CERCLA section 121(c) and the NCP, EPA conducts five-
year reviews to ensure the continued protectiveness of remedial actions
where hazardous substances, pollutants, or contaminants remain at a
site above levels that allow for unlimited use and unrestricted
exposure. EPA conducts such five-year reviews even if a site is deleted
from the NPL. EPA may initiate further action to ensure continued
protectiveness at a deleted site if new information becomes available
that indicates it is appropriate. Whenever there is a significant
release from a site deleted from the NPL, the deleted site may be
restored to the NPL without application of the hazard ranking system.

III. Deletion Procedures

    The following procedures were followed for deletion of this Site:
    (1) The EPA consulted with the State of California's Department of
Toxic Substances Control (DTSC) prior to developing this Direct Final
Notice of Deletion and Notice of Intent to Delete being co-published in
the ``Proposed Rules'' section of the Federal Register.

[[Page 36945]]

    (2) EPA provided DTSC 30 working days for its review and comment of
this Notice and the Notice of Intent to Delete and, following its
review, DTSC concurs with the deletion of the Site from the NPL.
    (3) Concurrently with the publication of this Direct Final Notice
of Deletion, a notice of availability of the parallel Notice of Intent
to Delete is being published in a major local newspaper, the Visalia
Times-Delta. The newspaper notice announces the 30-day public comment
period concerning the Notice of Intent to Delete the Site from the NPL.
    (4) The EPA has placed copies of supporting documents for the
proposed site deletion in the Deletion Docket and made these documents
available for public inspection and copying at the Site Information
Repositories identified above.
    (5) If adverse comments are received within the 30-day public
comment period on this deletion action, EPA will publish a timely
notice of withdrawal of this Direct Final Notice of Deletion before its
effective date and it will not take effect; otherwise, EPA will prepare
a response to comments and continue with the deletion process on the
basis of the Notice of Intent to Delete and the comments it has already
received.
    Deletion of a site from the NPL does not itself create, alter, or
revoke any individual's rights or obligations. Deletion of a site from
the NPL does not in any way alter EPA's right to take enforcement
actions, as appropriate. The NPL is designed primarily for
informational purposes and to assist EPA management. Section
300.425(e)(3) of the NCP states that the deletion of a site from the
NPL does not preclude eligibility for future response actions, should
future conditions warrant such actions.

IV. Basis for Site Deletion

    The following information provides EPA's basis for deleting the
Site from the NPL:

Site Background and History

    The VPY Site is located at 432 North Ben Maddox Way in northeastern
Visalia, Tulare County, California. The Site is bounded on the north by
East Goshen Avenue, and on the west by North Ben Maddox Way. Visalia is
located approximately midway between Fresno and Bakersfield in the
Central Valley of California and is a growing metropolitan area with a
population of approximately 110,000. Agriculture is the dominant
industry in the region and walnuts, olives, and citrus are the primary crops.
    The geologic strata underlying the VPY are composed of alluvial-fan
deposits from the Kaweah River and its distributaries. The three
hydrostratigraphic units beneath the site include: A shallow aquifer
(30 to 50 feet bgs; dewatered since the 1980s), a shallow aquitard (50
to 75 feet bgs), an intermediate aquifer (75 to 100 feet bgs), an
intermediate aquitard (100 to 125 feet bgs), and a deep aquifer (125 to
about 180 feet bgs). Both aquitards generally consist of silty sand and
clay materials, whereas the aquifers are composed primarily of fine-
grained and coarse-grained sands. When saturated, the shallow aquitard
restricts vertical groundwater movement. Aquifer testing of the
intermediate hydrostratigraphic unit indicated a transmissivity of
approximately 50,000 gallons per day per foot (gpd/ft). Short-term
pumping from the deeper aquifer affects hydrostatic water elevation
levels in the intermediate aquifer.
    From 1925 to 1980, the Southern California Edison Company operated
a fabrication yard to produce wooden poles for use in the distribution
of electricity throughout the utility's service territory. Western red
cedar trees were logged and transported to the yard, debarked, sized,
shaped, and chemically preserved to resist attack from fungi and
insects. The chemical preservation treatment process consisted of
immersion of the wooden poles in heated tanks of preservative fluid.
The treatment system consisted of two above-grade dip tanks, one in-
ground full treatment tank, a fluid heating system, hot and cold fluid
storage tanks, and underground product transfer lines. SCE primarily
used creosote to treat its utility poles. However, in 1968, SCE began
using pentachlorophenol (PCP), since PCP treated poles looked
``cleaner'' and were felt to be more suitable for use in an urban
environment. A solution of pentachlorophenol and diesel (petroleum
hydrocarbons) was substituted as the preservative for the wood
preservation process, which contained low levels of dioxin and furan
byproduct impurities of the PCP manufacturing process.
    During the service life of the VPY, significant volumes of chemical
preservatives were released into subsurface soils and groundwater.
Groundwater contamination was first discovered in an on-site well in
1966. Hydrogeologic investigations were conducted between 1966 and 1975
to determine the nature and extent of contamination.
    The types of chemicals found at the VPY include creosote compounds,
PCP, and its associated impurities including octachlorodibenzo-P-
dioxin. The sources of chemical release of creosote and PCP were
primarily leakage from piping between the storage tanks and treatment
tanks and cracks in the treatment tanks.
    In 1989, the VPY was added to the Federal Superfund National
Priorities List (NPL) (54 FR 13296) by the United States Environmental
Protection Agency (USEPA).
    Cleanup activities were first initiated in 1975, with the
installation of extraction wells to remove contaminated groundwater and
discharge to publicly owned treatment works (POTW). This action was
followed by construction of the slurry wall in 1976-77, to prevent
further downgradient migration of Wood Treating Chemicals (WTCs) in
groundwater. In 1981, all treating facilities were demolished and
approximately 2,300 cubic yards of contaminated soil were removed and
disposed of into an off-site Class 1 disposal facility. Additionally,
an on-site water treatment plant (WTP) consisting of filtration and
adsorption system was built in 1985 and was successful in removing the
chemicals of concern (COC) from the treated groundwater. The WTP was
modified with additional filtration and gravity separation in 1987,
which optimized plant performance by minimizing hazardous waste
generation. The WTP pumped, treated, and discharged an average of 0.36
million gallons per day between 1985 and 1997. In 1997 the construction
and operation of the Visalia Steam Remediation Project (VSRP) began and
the volume of water treated increased to approximately 0.5 million
gallons per day. The treated effluent was now discharged to Mill Creek
under a National Pollutant Discharge Elimination System (NPDES) permit.
    Currently there are no specific redevelopment plans for the Site.
The City of Visalia has purchased all of the surrounding property
formerly owned by SCE and has indicated an interest in purchasing the
subject property (Site) after it is deleted from the NPL. It is
understood the City would expand their current General Services
operations to include the Site.

Remedial Investigation (RI)/Feasibility Study (FS)

    In 1987, SCE and the State signed an agreement requiring the
utility to perform a study to determine the nature and extent of site
contamination and to recommend alternatives for final cleanup action.

[[Page 36946]]

    The Remedial Investigation (RI) (Geraghty & Miller, 1992a) found a
distribution of wood treating chemicals (WTCs) in both the vadose zone
and saturated zone at the VPY. Additionally, at that time, a non-
aqueous phase diesel hydrocarbon plume covered a horizontal area
approximately 2.1 acres in size and extended vertically to
approximately 125 feet below ground surface (bgs).
    WTCs in the vadose zone and were found to be concentrated near
points of release from immersion tanks and piping. Horizontal-radial
dispersion of WTCs is believed to have occurred in the shallow vadose
zones by capillary action of fine grained soils and transported
laterally from the source area occurred during times when the vadose
zone was saturated. Historical water table elevation levels were about
30 feet bgs and are currently measured at approximately 80 feet bgs.
Depression of the regional water table elevation level initially
occurred during the state-wide drought of the 1980's, and continues to
decline from increased regional groundwater pumping for residential,
agricultural, and industrial uses.
    The Feasibility Study (FS) (Geraghty & Miller, 1992b) recommended
enhanced in-situ biodegradation (EISB) in addition to continuing the
pump-and-treat system as the recommended remedial action alternative.

Selected Remedy

    The remedial action objectives for the site are:
    • Prevent the migration of pole treating chemicals, present
in unsaturated soil, to groundwater;
    • Prevent occupational exposure to soil with constituent
concentrations exceeding health-based concentrations;
    • Prevent residential and occupational exposure to
groundwater with chemical concentrations above remediation goals; and
    • Prevent dermal occupational exposure to groundwater with
chemical concentrations above remediation goals.
    The State approved a Remedial Action Plan (RAP) in 1994 and EPA
signed a Record of Decision (ROD) on June 10, 1994. The major
components of the selected remedy described in the ROD include: In-situ
bioremediation, pilot test of steam remediation, property access
restrictions, and deed restrictions. The goals of the remedy are to
remediate soils to industrial/commercial use levels and to remediate
groundwater to drinking water standards. The contaminants of concern
for both soil and groundwater are Pentachloropenol (PCP),
Benzo(a)Pyrene, and TCDDeqv.

Response Actions

    In 1997, before implementing the remedy, the Visalia Steam
Remediation Project (VSRP), a pilot study approved by DTSC and
concurred by EPA, was initiated which used steam injection technique
called Dynamic Underground Stripping (DUS) to mobilize chemicals of
concern (COCs). The pilot study operated in two phases between May 1997
and June 2000. Phase 1 operations focused on the intermediate aquifer,
with injection and extraction wells screened between 80 and 100 feet
bgs. Phase 2 operations began in November 1998 and included steam
injection and extraction below the intermediate aquitard, with
injection wells screened between 125 and 145 feet bgs. Phase 2
operations continued until the COC removal rate precipitously dropped
in June 2000.
    Following cessation of the VSRP, an enhanced biological degradation
system was installed and operated (SCE, 2001) to augment existing
physical processes that were initiated by DUS and to encourage natural
biological processes to flourish. This system was in operation from
June 2000 until March 2004 and included vadose zone bioventing and
saturated zone biosparging coupled with continued groundwater pump-and-
treat operation. Construction completion of the enhanced biological
degradation system was documented in the 2001 Preliminary Close Out
Report (PCOR).
    A post-remediation surface soil investigation was conducted at the
Site in November 2004. Results for tetrachlorodibenzo-p-dioxin (TCDD)
were detected at slightly above Site cleanup standard at four
locations. As a result, and following recommendations of the 2005 Five-
Year Review, contaminated surface soils between zero and ten feet below
grade were removed in July 2006 and remaining soils were verified with
confirmatory sampling to be below ROD cleanup standards.

Cleanup Goals

    The cleanup goals from the ROD are the following:

------------------------------------------------------------------------
                                                          Ground water
                                         Soil (mg/kg)       (μg/L)
------------------------------------------------------------------------
Petanchlorophenol (PCP)..............           17                   1
Benzo(a)Pyrene.......................            0.39                0.2
TCDDeqv..............................            0.001              30
------------------------------------------------------------------------

The QA/QC program used throughout the design, construction, and
operation of the remediation systems was outlined in a DTSC and EPA
approved Quality Assurance Project Plan (QAPP). This program enabled
EPA to determine that all analytical results reported were accurate and
adequate and ensure satisfactory execution of the remedial action
requirements consistent with the ROD.
    Duplicate soil and groundwater samples were collected in accordance
with the QAPP. Matrix spike, duplicate, and blank samples were analyzed
by the laboratory, and the resulting data were provided to DTSC and
EPA. The QA/QC program was also used for the quarterly groundwater
monitoring program and cleanup standard attainment demonstration period.
    During VSRP operations, the various forms of WTC removal or
destruction were documented through continuous monitoring systems and
regular volume measurements. These included:
    • Non-aqueous Phase Product recovery
    • Vapor-phase removal
    • Liquid-phase removal
    Non-aqueous Phase product was recovered from both dissolved air
flotation and oil-water separation methods and transferred to storage
tanks where the volume measurements were made. Vapor-phase recovery was
measured as both total hydrocarbons and CO2 equivalents of
oxidized hydrocarbons via continuous emissions analyzer systems. Liquid
phase removal was measured through a total organic carbon analyzer.
    Quarterly groundwater monitoring was conducted from 1985 through
June 2007 within, and outside the boundaries of the area subjected to
steam remediation operations. Monitoring of extraction wells within and
on the edge of the WTC plume was used as a tool to assess the success
of WTC removal. Monitoring of offsite wells was conducted to ensure
WTCs were not

[[Page 36947]]

escaping the groundwater extraction system.
    Groundwater monitoring data from June 2004 through June 2007 were
used to verify that all ROD groundwater cleanup standards had been met.
    The Remedial Action Completion Report (SCE, 2008) documented that
the post-remediation groundwater monitoring and soil removal actions
performed met the ROD cleanup standards for soil and groundwater.
    The Final Close Out Report (FCOR) was signed on May 19, 2009.

Operation and Maintenance

    A ``Covenant to Restrict Use of Property, Environmental
Restriction'', between Southern California Edison and the Department of
Toxic Substances Control (DTSC), was recorded in Tulare County,
California on May 23, 2007. This Covenant satisfies the ROD requirement
for property access restrictions and a deed restriction. The Covenant
outlines use restrictions (as well as Site operation and maintenance
(O&M) activities). As remedial action objectives are based on
industrial cleanup standards, prohibited Site uses include: Residences,
human hospitals, schools, and day care centers for children. Prohibited
activities include: Soil disturbance greater than ten feet bgs, and the
installation of water wells for any purpose. The Covenant requires the
Site owner to conduct an annual inspection of the property and prepare
an Annual Inspection Report, describing how all of the site
restrictions are being complied with. The Annual Report must certify
that the property is being used in a manner consistent with the
Covenant, and must be submitted to DTSC by June 15th of each year.

Five-Year Review

    A statutory Five-Year Review was completed in September 2005 (DTSC/
USEPA, 2005), pursuant to EPA's Comprehensive Five-Year Review Guidance
(OSWER No. 9355.7-03B-P, June 2001). The Five-Year Review concluded
that remedial actions taken at the Site were protective of human health
and the environment in the short term, and institutional controls were
needed in order to ensure long term human health protectiveness. A
``Covenant to Restrict Use of Property, Environmental Restriction'',
between SCE and DTSC, was recorded in Tulare County, California on May
23, 2007.
    The Five-Year Review also recommended an evaluation of contaminated
surface soil; soils which were later removed and any remaining soils
were verified with confirmatory sampling to be below the cleanup
standards prescribed in the ROD. The next Five-Year Review will be
completed by September 2010.

Community Relations Activities

    Community involvement activities included the development of a
Community Relations Plan (CRP), prior to initiation of the RI/FS
activities. The CRP included development of a community profile and a
list of key local contacts. The community profile indicated the
surrounding area was mainly businesses which had little interest in the
site cleanup activities. Notification of the issuance of the Draft ROD
was made and copies of the Draft ROD were made publicly available at
the local public library, DTSC and USEPA Region IX Superfund Records
Center. A Public Notice was also placed in the local newspaper. A
Public Meeting was held in Visalia, California on October 13, 1993, to
provide information on the proposed cleanup. There were no members of
the public in attendance at the meeting. A meeting was also held with
members of the Visalia City Council, to apprise them of the proposed
site cleanup activities. The Council members were supportive of the
proposed cleanup actions and deletion of this site from the NPL.
    Notification to the public of the initiation and completion of the
2005 Five-Year Review was made through a Public Notice in the Visalia
Times-Delta newspaper. A copy of the completed Five-Year Review was
placed in the Tulare County Library, USEPA Region IX Superfund Records Center.
    Public participation activities for this Site have been satisfied
as required in CERCLA 113(k) and Section 117. All documents and
information which EPA relied on or considered in recommending this
deletion are available for the public to review at the information
repositories identified above.

Determination That the Site Meets the Criteria for Deletion From the NCP

    This site meets all the site completion requirements specified in
OSWER Directive 9320.2-09-A-P, Close Out Procedures for National
Priorities List Sites. Specifically, that the following actions
specified in the ROD have been implemented: (1) SCE applied an
aggressive steam remediation technology to remove COCs in Site soils
and groundwater beneath the site; (2) a post-remediation soil
investigation verified meeting soil cleanup standards prescribed in the
ROD; (3) groundwater has been monitored on a site-wide basis, and the
monitoring results from June 2004 through June 2007 show that cleanup
standards specified in the ROD have been met, and; (4) a Land Use
Covenant between DTSC and SCE has been recorded with Tulare County that
restricts site uses and activities.
    The NCP specifies that EPA may delete a site from the NPL if ``all
appropriate Fund-financed response under CERCLA has been implemented,
and no further response action by responsible parties is appropriate.''
40 CFR 300.425(e)(1)(ii). EPA, with the concurrence from the State of
California, DTSC, believes that this criterion for deletion has been
met. Consequently, EPA is deleting this Site from the NPL. Documents
supporting this action are available in the Site repositories.

V. Deletion Action

    The EPA, with concurrence of the State of California, DTSC, has
determined that all appropriate response actions under CERCLA, other
than operation, maintenance, monitoring and five-year reviews have been
completed. Therefore, EPA is deleting the Site from the NPL.
    Because EPA considers this action to be noncontroversial and
routine, EPA is taking it without prior publication. This action will
be effective September 25, 2009 unless EPA receives adverse comments by
August 26, 2009. If adverse comments are received within the 30-day
public comment period, EPA will publish a timely withdrawal of this
direct final notice of deletion before its effective date of deletion,
and it will not take effect; otherwise, EPA will prepare a response to
comments and continue with the deletion process on the basis of the
notice of intent to delete and the comments already received. There
will be no additional opportunity to comment.

List of Subjects in 40 CFR Part 300

    Environmental protection, Air pollution control, Chemicals,
Hazardous substances, Hazardous waste, Intergovernmental relations,
Penalties, Reporting and recordkeeping requirements, Superfund, Water
pollution control, Water supply.

    Dated: July 15, 2009.
Laura Yoshii,
Acting Regional Administrator, Region IX.

• For the reasons set out in this document, 40 CFR part 300 is amended as
follows:

PART 300--[AMENDED]

• 1. The authority citation for part 300 continues to read as follows:

    Authority: 33 U.S.C. 1321(c)(2); 42 U.S.C. 9601-9657; E.O.
12777, 56 FR 54757, 3 CFR,

[[Page 36948]]

1991 Comp., p. 351; E.O. 12580, 52 FR 2923; 3 CFR, 1987 Comp., p. 193.

Appendix B to Part 300 [Amended]

• 2. Table 1 of Appendix B to part 300 is amended by removing ``Southern
California Edison Co. (Visalia) Visalia, CA.''

[FR Doc. E9-17562 Filed 7-24-09; 8:45 am]
BILLING CODE 6560-50-P

 
 