Quality Assurance Project Plan Checklist
| Revision: | QAPP Category: | Project Number: |
| Grant Title: | |||
| Author/P.I.: | Project Officer: | ||
| Date Review Submitted: | Date Review Requested: | ||
| Date Review Completed: | Reviewed by: | ||
Major deficiencies (defined here as the absence of relevant information) were found in
the following elements:
| Title & Approval Sheet | Analytical Methods | ||
| Table of Contents | Quality Control | ||
| Distribution List | Instrument/ Equipment Testing | ||
| Project/Task Organization | Instrument Calibration & Frequency | ||
| Problem Definition/Background | Inspection/Acceptance for Supplies | ||
| Project/Task Description | Data Acquisition (Non-Direct) | ||
| Data Quality Objectives | Data Management | ||
| Special Training/Certification | Assessments & Response Actions | ||
| Documentation & Records | Reports to Management | ||
| Sampling Process Design | Data Review, Validation & Verification | ||
| Sampling Method | Validation and Verification Methods | ||
| Sample Handling | Reconciliation with User Requirements |
Conclusion / Recommendation:
| Acceptable | Acceptable with minor revisions | Unacceptable with major revisions |
| Revision: | QAPP Category: | Project Number: |
| Grant Title: | |||
| Author/P.I.: | Project Officer: | ||
| Date Review Submitted: | Date Review Requested: | ||
| Date Review Completed: | Reviewed by: | ||
Major deficiencies (defined here as the absence of relevant information) were found in
the following elements:
| Title & Approval Sheet | Analytical Methods | ||
| Table of Contents | Quality Control | ||
| Distribution List | Instrument/ Equipment Testing | ||
| Project/Task Organization | Instrument Calibration & Frequency | ||
| Problem Definition/Background | Inspection/Acceptance for Supplies | ||
| Project/Task Description | Data Acquisition (Non-Direct) | ||
| Data Quality Objectives | Data Management | ||
| Special Traing/Certification | Assessments & Response Actions | ||
| Documentation & Records | Reports to Management | ||
| Sampling Process Design | Data Review, Validation & Verification | ||
| Sampling Method | Validation and Verification Methods | ||
| Sample Handling | Reconciliation with User Requirements |
Conclusion / Recommendation:
| Acceptable | Acceptable with minor revisions | Unacceptable with major revisions |
| IA = Included & Acceptable,
NI=Not Included, IU = Included &Unacceptable, NA=Not Applicable |
IA | NI | IU | NA | Comments |
| A1. Title & Approval Sheet | |||||
| Title | |||||
| Organization's name | |||||
| Dated signature of project manager | |||||
| Dated signature of QA officer | |||||
| Other signatures, as needed | |||||
| A2. Table of Contents | |||||
| A3. Distribution List | |||||
| A4. Project / Task Organization | |||||
| Identifies key individuals & responsibilities (data users, decision makers, project QA Manager, Subcontractors , etc.) | |||||
| Organization chart shows lines of authority & reporting responsibilities | |||||
| A5. Problem Definition / Background | |||||
| Clearly states problem or decision to be resolved | |||||
| Historical & background information | |||||
| A6. Project / Task Description | |||||
| Lists measurements to be made | |||||
| Cites applicable technical, regulatory, or program-specific quality standards, criteria, or objectives | |||||
| Notes special personnel or equipment requirements | |||||
| Provides work schedule | |||||
| Notes required project & QA records/ reports | |||||
| A7. Quality Objectives & Criteria for Measurement Data | |||||
| States project objectives and limits, both qualitatively & quantitatively | |||||
| States & characterizes measurement quality objectives as to applicable action levels or criteria | |||||
| A8. Special Training Requirements/Certifications | |||||
| A9. Documentation & Records | |||||
| Lists information & records to be included in data report (e.g. raw data, field logs, results of QC checks, problems encountered) | |||||
| States requested lab turnaround time | |||||
| Gives retention time and location for records and reports | |||||
| B1. Sampling Process Design (Experimental Design) | |||||
| Types and number of samples required | |||||
| Sampling network design & rationale for design | |||||
| Sampling locations & frequency of sampling | |||||
| Sample matrices | |||||
| Classification of each measurement parameter as either critical or needed for information only | |||||
| Validation study information, for non-standard situations | |||||
| B2. Sampling Method Requirements | |||||
| Identifies sample collection procedures & methods | |||||
| Lists equipment needs | |||||
| Identifies support facilities | |||||
| Identifies individuals responsible for corrective action | |||||
| B3. Sample Handling & Custody Requirements | |||||
| Notes sample handling requirements | |||||
| Notes chain of custody procedures, if required | |||||
| B4. Analytical Methods Requirements | |||||
| Identifies analytical methods to be followed (with all options) & required equipment | |||||
| Provides validation information for non-standard methods | |||||
| Identifies individuals responsible for corrective action | |||||
| B5. Quality Control (QC) Requirements | |||||
| Identifies QC procedures & frequency for each sampling, analysis, or measurement technique, as well as associated acceptance criteria and corrective action | |||||
| References procedures used to calculate QC statistics ( precision, bias & accuracy) | |||||
| B6. Instrument/ Equipment Testing, Inspection & Maintenance Requirements | |||||
| Identifies acceptance testing of sampling and measurement systems | |||||
| Describes equipment needing calibration and frequency for such calibration | |||||
| Notes availability & location of spare parts | |||||
| B7. Instrument Calibration & Frequency | |||||
| Identifies equipment needing calibration and frequency for such calibration | |||||
| Notes required calibration standards and/or equipment | |||||
| Cites calibration records & manner traceable to equipment | |||||
| B8. Inspection/Acceptance Requirements for Supplies & Consumables | |||||
| States acceptance criteria for supplies & consumables | |||||
| Notes responsible individuals | |||||
| B9. Data Acquisition Requirements for Non-Direct Measurements | |||||
| Identifies type of data needed from non-measurement sources (e.g. computer data bases & literature files) along with acceptance criteria for their use | |||||
| Describes any limitations of such data | |||||
| B10. Data Management | |||||
| Describes standard record keeping & data storage and retrieval requirements | |||||
| Checklist or standard forms attached to QAPP | |||||
| Describes data handling equipment & procedures used to process, compile, and analyze data ( e.g., required computer hardware & software) | |||||
| C1. Assessments & Response Actions | |||||
| Lists required number, frequency & type of assessments, with approximate date and names of responsible personnel | |||||
| Identifies individuals responsible for corrective action | |||||
| C2. Reports to Management | |||||
| Identifies the preparer and recipients of reports | |||||
| Identifies frequency and distribution of reports for: | |||||
| Project Status | |||||
| Results of performance evaluations & audits | |||||
| Results of periodic data quality assessments | |||||
| Any significant QA problems | |||||
| D1. Data Review, Validation, & Verification | |||||
| States criteria for accepting, rejecting, or qualifying data | |||||
| Includes project-specific calculations or algorithms | |||||
| D2. Validation and Verification Methods | |||||
| Describes process for data validation and verification | |||||
| Identifies issue resolution procedure and responsible individuals | |||||
| Identifies method for conveying these results to data users | |||||
| D3. Reconciliation with User Requirements | |||||
| Describes process for reconciling with DQOs and reporting limitations on use of data | |||||