Great Lakes Funding
- Current Offerings
- Managing an Agreement
- Descriptions of Previous Projects
- Previous Requests for Proposals
Are you interested in news about our USEPA Great Lakes funding opportunities? Join our mail list, "greatlakesnews"
Required Elements in a Quality Assurance Project Plan (QAPP)
PROJECT MANAGEMENT |
|
| A1 Title and Approval Sheet | Title and approval sheet. |
| A2 Table of Contents | Document control format. |
| A3 Distribution List | Distribution list for the QAPP revisions and final guidance. |
| A4 Project/Task Organization | Identify individuals or organizations participating in the project and discuss their roles, responsibilities and organization. |
| A5 Problem Definition/ Background | 1) State the specific problem to be solved
or the decision to be made. 2) Identify the decision maker and the principal customer for the results. |
| A6 Project/Task Description | 1) Hypothesis test, 2) expected measurements, 3) ARARs or other appropriate standards, 4) assessment tools (technical audits), 5) work schedule and required reports. |
| A7 Data Quality Objectives for Measurement Data | Decision(s), population parameter of interest, action level, summary statistics and acceptable limits on decision errors. Also, scope of the project (domain or geographical locale). |
| A8 Special Training Requirements/ Certification |
Identify special training that personnel will need. |
| A9 Documentation and Record | Itemize the information and records that must be included in a data report package, including report format and requirements for storage, etc. |
MEASUREMENT/DATA ACQUISITION |
|
| B1 Sampling Process Designs (Experimental Design) | Outline the experimental design, including sampling design and rationale, sampling frequencies, matrices, and measurement parameter of interest. |
| B2 Sampling Methods Requirements | Sample collection method and approach. |
| B3 Sample Handling and Custody Requirements | Describe the provisions for sample labeling, shipment, chain-of-custody forms, procedures for transferring and maintaining custody of samples. |
| B4 Analytical Methods Requirements | Identify analytical method(s) and equipment for the study, including method performance requirements. |
| B5 Quality Control Requirements | Describe routine (real-time) QC procedures that should be associated with each sampling and measurement technique. List required QC checks and corrective action procedures. |
| B6 Instrument/Equipment Testing Inspection and Maintenance Requirements | Discuss how inspection and acceptance testing, including the use of QC samples, must be performed to ensure their intended use as specified by the design. |
| B7 Instrument Calibration and Frequency | Identify tools, gauges and instruments, and other sampling or measurement devices that need calibration. Describe how the calibration should be done. |
| B8 Inspection/Acceptance Requirements for Supplies and Consumables | Define how and by whom the sampling supplies and other consumables will be accepted for use in the project. |
| B9 Data Acquisition Requirements (Non-direct Measurements) | Define the criteria for the use of non- measurement data such as data that come from databases or literature. |
| B10 Data Management | Outline the data management scheme including the path and storage of the data and the data record-keeping system. Identify all data handling equipment and procedures that will be used to process, compile, and analyze the data. |
ASSESSMENT/OVERSIGHT |
|
| C1 Assessments and Response Actions | Describe the assessment activities needed for this project. These may include DQA, PE, TSA, MSR/ PR/RR |
| C2 Reports to Management | Identify the frequency, content and distribution of reports issued to keep management informed. |
DATA VALIDATION AND USABILITY |
|
| D1 Data Review, Validation, and Verification Requirements | State the criteria used to accept or reject the data based on quality. |
| D2 Validation and Verification Methods | Describe the process to be used for validating and verifying data, including the chain-of-custody for data throughout the lifetime of the project. |
| D3 Reconciliation With Data Quality Objectives | Describe how results will be evaluated to determine if DQOs have been satisfied. |
GLNPO added note: The above elements are the minimum requirements for a QAPP, and therefore, should be used during the QAPP development.
![[logo] US EPA](http://www.epa.gov/epafiles/images/logo_epaseal.gif)