| The haul roads are sprayed with water to suppress dust when
traveling on the unpaved roadways. |
 |
|
Two portable bridges are being used to get the off-road
equipment over three 24" underground water lines. |
 |
|
Large excavators are used to remove pieces of the former
building foundation into an off-road truck. It is estimated that
there is over 20,000 tons of concrete foundations that have to
be removed prior to landfill excavation. |
 |
|
One of the 150,000 lb. excavators that will be used for landfill
excavation. |
 |
|
The double walled HDPE pipe that will be used to pump/transfer
the dredged sediment from the river to the landfill. |