The post-remediation condition at the upstream reaches of Ruddiman Creek. The storm sewer outfall pictured here is the headwaters of the creek. The large boulders were added to help dampen flows from extreme rain events that enter the creek.
The post-remediation condition at the upstream reaches of Ruddiman Creek. The headwaters of Ruddiman Creek form at the sewer outfall pictured here. The large boulders were added to the banks to help dampen flows from extreme rain events that enter the creek.
The post-remediation condition at a downstream location along Ruddiman Creek. The Glenside Neighborhood Association is recruiting community volunteers to assist with restoration (planting and maintenance) of native plants along the creek banks in Spring 2006.
The post-remediation condition at a downstream location along Ruddiman Creek. The Glenside Neighborhood Association is recruiting community volunteers to assist with restoration (planting and maintenance) of native plants along the creek banks in Spring 2006.

 