Jump to main content.


Phase 1 Dredge Area Delineation Report (DAD Report)
February 2005

Prepared by General Electric Company (GE)

Download the Report

You will need Adobe Acrobat Reader, available as a free download, to view some of the files on this page. See EPA's PDF page to learn more about PDF, and for a link to the free Acrobat Reader. For optimal viewing, please use Acrobat Reader 6.0 or higher.

Text, Table, and Appendices

  • Sections 1-7
  • List of Tables
  • List of Figures
  • List of Appendice
    • Appendix A Statistical Analysis of DOC Extrapolation Data
    • Appendix B Evaluation of PCB Concentrations at Depth in Finely-Sectioned Sediment Cores
    • Appendix C Dioxin, Furan, and Metals Results for Sub-Bottom Samples in Phase 1 Areas

Figures (Figures are available upon request by contacting kluesner.dave@epa.gov)

  • Figures1-1 thru 3-1
  • Figures 3-2 thru 3-15c
  • Figures 3.1d thru 5-13
  • Figures 5-14 thru 5-45
  • Figures 5-46 thru 5-63
  • Figures 5-64 thru 5-77
  • Figures 5-78- thru 5-93
  • Figures 5-94- thru 5-108
  • Figures 5-109 thru 5-122

Fact Sheet (April 2005)

 

LocalNavigation


Jump to main content.