Jump to main content.


Draft Engineering Performance Standards - Public Review Copy (May 2003)

Volume 1 of 4
Part 1: Performance Standard For Dredging Resuspension

Individual Files Contents of Volume 1
Free PDF reader available Cover Letter | Executive Summary | Introduction
Free PDF reader available Resuspension Standard
Free PDF reader available Attachment A: Hudson River Water Column Analysis
Free PDF reader available Attachment D: Modeling Analysis
Free PDF reader available Attachment E: Engineering Contingencies

Executive Summary
Introduction
1.0 Statement of the Performance Standard for Dredging Resuspension
2.0 Technical Basis of the Performance Standard for Dredging Resuspension
3.0 Implementation of the Performance Standard for Dredging Resuspension
4.0 Plan for Refining the Performance Standard for Dredging Resuspension
5.0 References
Tables
Figures
Attachment A Hudson River Water Column Concentration Analysis
Attachment B Resuspension Sensitivity
Attachment C Examination of Mechanisms for High Dissolved Phase PCB Concentrations
Attachment D Modeling Analysis
Attachment E Engineering Contingencies
Attachment F Measurement Technologies
Attachment G A Discussion of Data Quality Objectives

 

Back To Top

Volume 2 of 4
Part 2: Performance Standard For Dredging Residuals

Individual Files Contents of Volume 2
Free PDF reader available Cover Letter | Executive Summary | Introduction
Free PDF reader available Residual Standard
Free PDF reader available Figures | Attachment A

Executive Summary
Introduction
1.0 Statement of the Performance Standard for Dredging Residuals
2.0 Technical Basis of the Performance Standard for Dredging Residuals
3.0 Implementation of the Performance Standard for Dredging Residuals
4.0 Plan for Refining the Performance Standard for Dredging Residuals
5.0 References
Tables
Figures
Attachment A Case Study Site Residual Data & New Bedford Harbor Pre-Design Test Residual Results Evaluati

 

Back To Top

Volume 3 of 4
Part 3: Performance Standard For Dredging Productivity

Individual Files Contents of Volume 3
Free PDF reader available Cover Letter | Executive Summary | Introduction
Free PDF reader available Productivity Standard
Free PDF reader available Attachment 2.0 – Productivity Schedule Backup
Free PDF reader available Attachment 3.0 – Site Specific Quantity Development
Free PDF reader available RMs 188.5 to 163.25
Free PDF reader available Subpart 3-B: Mechanical Dredging Scenario
Free PDF reader available Subpart 3-C: Hydraulic Dredging Scenario

Cover Letter
Executive Summary
Introduction
1.0 Statement of the Performance Standard for Dredging Productivity
2.0 Technical Basis of the Performance Standard for Dredging Productivity
3.0 Implementation of the Performance Standard for Dredging Productivity
4.0 Plan for Refinement of the Performance Standard for Dredging Productivity
Tables
Figures
Attachment 1.0 Productivity Schedule
Attachment 2.0 Productivity Schedule Backup
Attachment 3.0 Site Specific Quantity Development
Subpart 3-A: Existing Sediment Characteristics
Subpart 3-B: Mechanical Dredging Scenario
Subpart 3-C: Hydraulic Dredging Scenario
Attachment 4.0 Issues Associated with Processing 4500 Tons/Day at Moreau Landfill Site

 

Back To Top

Volume 4 of 4
Part 4: Case Studies of Environmental Dredging Projects

Individual Files Contents of Volume 4
Free PDF reader available Cover Letter | Executive Summary | Introduction
Free PDF reader available Appendix: Case Studies of Environmental Dredging Projects

Executive Summary
Introduction
1.0 Case Studies
2.0 Hudson River Data Collection
3.0 References
Tables
Figures

LocalNavigation


Jump to main content.