LMOP Award Winner imageSelf Developed (absence of third party developer) image

LocationEllenwood, Georgia
End User(s)Georgia Power Company
Sector(s)Utility
Landfill(s)Seminole Road Landfill
Landfill Size8.43 million tons waste-in-place (2006)
Project TypeReciprocating Engine (two Caterpillar 3520 engines)
Project Size3.2 megawatts (MW)
Environmental BenefitsCarbon sequestered annually by 3,600 acres of pine or fir forests, annual greenhouse gas emissions from 2,900 passenger vehicles, or carbon dioxide emissions from 36,900 barrels of oil consumed. Annual energy savings equate to powering 2,000 homes. Estimated emissions reductions of 0.0043 million metric tons of carbon equivalents.
LMOP Partners InvolvedCaterpillar, Inc., DeKalb County Sanitation, GeoSyntec Consultants, SCS Engineers and SCS Field Services
Photo of EPA Deputy Regional Administrator Stan Meiburg at Seminole Road Landfill’s ribbon-cutting ceremony in Georgia.

DeKalb County solid waste officials faced a major challenge from county commissioners: Develop a 3.2 MW landfill gas (LFG) energy facility, ensure the county meets all regulatory requirements, and make it a showcase for LFG utilization—plus, complete it on an accelerated schedule without a third party developer.

Solid waste officials responded with resounding success, earning recognition as LMOP’s 2006 Community Partner of the Year. The project met all criteria and was completed on schedule. An innovative design, build, and operate procurement approach allowed completion in just seven months from county commissioners’ construction approval.

The project’s highlights include the following:

  • First green power project for Georgia Power.
  • Minimum of 22,500 megawatt-hours per year for 10 years.
  • Financial payback in less than 5 years.
  • Seamless interface with existing flare station and wellfield.

The showcase LFG energy facility emphasizes education and offers tours about LFG utilization. On a 54-inch display screen, visitors view real-time performance of the engine generators. Plus, the facility displays a full circle mural that follows trash from its collection, to the landfill, to LFG generation, to LFG capture, and ultimately to providing electricity to the same residents and businesses from which the trash was collected.