Jump to main content or area navigation.

Contact Us

Landfill Methane Outreach Program

Project Profile

Pitt County Memorial Hospital LFG Energy Project

Location:
Greenville, North Carolina
End User(s):
Pitt County Memorial Hospital
Sector(s):
Hospital
Landfill(s):
Pitt County Landfill
Landfill Size:
3.06 million tons waste-in-place
Project Type:
Boiler
Project Size:
694 standard cubic feet per minute (scfm)
Environmental Benefits:
Carbon sequestered annually by 17,500 acres of pine or fir forests, annual greenhouse gas emissions from 15,700 passenger vehicles, or carbon dioxide emissions from 191,200 barrels of oil consumed. Annual energy savings equate to heating 2,400 homes. Estimated emissions reductions of 0.0224 million metric tons of carbon equivalents.
LMOP Partners Involved:
Enerdyne Power Systems, Inc.
Last Updated:
7/7/2010

Jump to main content.