Wood / Slocum Street Area Cleanup
The Acushnet River just south of Main Street to just south of the Wood / Slocum Street Bridge was redirected to allow the excavation of around 12,000 cubic yards of contaminated PCB sediment from the river bed. The excavation was done in 2003. Shoreline restoration and replanting was completed in the spring and summer 2003.
-
Harbor Cleanup News, Early Cleanup Work Begins, October 2002 (PDF) (2 pp., 239 KB, about PDF)
- Trabalhos
de Limpeza Começam em Breve, Outubro 2002 (PDF) (2 pp., 243 KB, about PDF)
(this is the portugese version of the same fact sheet)
- Trabalhos
de Limpeza Começam em Breve, Outubro 2002 (PDF) (2 pp., 243 KB, about PDF)
-
Harbor Cleanup News, Early Cleanup Continues, February 2003 (PDF) (2 pp., 143 KB, about PDF)
![[logo] US EPA](http://www.epa.gov/epafiles/images/logo_epaseal.gif)














