Transportation Conformity Regulations - What Parts of the Final Rule Apply to Me?

The table in Federal Register notice 69 FR 40006-7, Section II.D., "What Parts of the Final Rule Apply to Me?", is incomplete. EPA intends to publish a correction notice in the Federal Register in the near future. All other preamble and regulatory text printed in the July 1, 2004 Notice are correct. Conformity implementers can begin to use the preamble and regulation as published.

Type of Area:
Complete List of Issues Addressed in the July 1, 2004 Final Conformity Rule (69 FR 40006-7)
(Replaces the table in Section II. D. "What Parts of the Final Rule Apply to Me?")
Type of Area Issue Addressed in Final Rule Preamble Section Regulatory Section
8-hour ozone Conformity grace period III.A.  §93.102(d)
Revocation of 1-hour ozone standard III.B.  Not applicable
General implementation of new standards III.C.  Not applicable
Early Action Compacts III.D.  Not applicable
Baseline year test IV.B.  §93.119(b)
Build/no-build test (marginal classification and subpart 1 areas 1) IV.C.  §93.119(b)(2)
 §93.119(g)(2)
Regional conformity tests (moderate and above classifications) IV.D.  §93.119(b)(1)
Regional conformity tests (areas without 1-hour ozone budgets) V.  §93.109(d)
Regional conformity tests (areas with 1-hour ozone budgets) VI.  §93.109(e)
Federal projects during a lapse XIV.  §93.102(c)
 §93.104(d)
Adequacy process of submitted SIPS XV.
XXIII.G.
 §93.118(e)
 §93.118(f)
Non-federal projects during a lapse XVI.  §93.121(a)
Consequences of SIP disapprovals XVII.  §93.120(a)(2)
Safety margins XVIII.  Deletes §93.124(b) of previous rule
Frequency XIX.  §93.104(c)
 §93.104(e)
Latest planning assumptions XX.  §93.110(a)
Relying on a previous analysis XXII.  §93.122(g)
 §93.104(b)
 §93.104(c)
Definitions XXIII.A.  §93.101
Insignificance XXIII.B.  §93.109(k)
 §93.121(c)
Transportation plan and modeling requirements (moderate and above classifications) XXIII.D.  §93.106(b)
 §93.122(c)
Non-federal projects (for isolated rural areas only) XXIII.F.  §93.121(b)(1)
Implementation of budget tests XXIII.H.
XXIII.I.
 §93.118(b)
 §93.118(d)
Exempt projects XXIII.J.  §93.126
Conformity SIPs XXV.   Not applicable
1 "Subpart 1 areas" are areas that are designated nonattainment under subpart 1 of part D of title 1 of the Clean Air Act.  EPA also referred to these areas as "basic" nonattainment areas in its April 30, 2004 final designations rule for the 8-hour ozone standard (69 FR 23862).
 
PM 2.5 Applicability III.A.  §93.102(b)(1)
Conformity grace period III.A.  §93.102(d)
General implementation of new standards III.C.  Not applicable
Baseline year test IV.B.  §93.119(e)
Build/no-build test IV.C.  §93.119(e)
 §93.119(g)(2)
Regional conformity tests VII.  §93.109(i)
Direct PM 2.5 in regional analyses from tailpipe, brake wear, tire wear VIII.  §93.102(b)(1)
Precursors in regional analyses VIII. No regulatory text being finalized at this time
Re-entrained road dust in regional analyses IX.  §93.102(b)(3)
 §93.119(f)
Construction-related fugitive dust in regional analyses X.  §93.122(f)
Compliance with SIP control measures XI.  §93.117
Hot-spots XII. No regulatory text being finalized at this time
Federal projects during a lapse XIV.  §93.102(c)
 §93.104(d)
Adequacy process of submitted SIPs XV.
XXIII.G.
 §93.118(e)
 §93.118(f)
Non-federal projects during a lapse XVI.  §93.121(a)
Consequences of SIP disapprovals XVII.  §93.120(a)(2)
Safety margins XVIII. Deletes §93.124(b)of previous rule
Frequency XIX.  §93.104(c)
 §93.104(e)
Latest planning assumptions XX.  §93.110(a)
Relying on a previous analysis XXII.  §93.122(g)
 §93.104(b)
 §93.104(c)
Definitions XXIII.A.  §93.101
Insignificance XXIII.B.  §93.109(k)
 §93.121(c)
Non-federal projects (for isolated rural areas only) XXIII.F.  §93.121(b)(1)
Implementation of budget tests XXIII.H.
XXIII.I.
 §93.118(b)
 §93.118(d)
Exempt projects XXIII.J.  §93.126
Conformity SIPs XXV.   Not applicable
 
1-hour ozone Revocation of 1-hour ozone standard III.B.  Not applicable
Regional conformity tests III.B.  §93.109(c)
Build/no-build test (marginal and below classifications) IV.C.  §93.119(b)(2)
 §93.119(g)(2)
Regional conformity test (moderate and above classifications) IV.D.  §93.119(b)(1)
Federal projects during a lapse XIV.  §93.102(c)
 §93.104(d)
Adequacy process of submitted SIPs XV.
XXIII.G.
 §93.118(e)
 §93.118(f)
Non-federal projects during a lapse XVI.  §93.121(a)
Consequences of SIP disapprovals XVII.  §93.120(a)(2)
Safety margins XVIII. Deletes §93.124(b) of previous rule
Frequency XIX.  §93.104(c)
 §93.104(e)
Latest planning assumptions XX.  §93.110(a)
Relying on a previous analysis XXII.  §93.122(g)
 §93.104(b)
 §93.104(c)
Definitions XXIII.A.  §93.101
Insignificance XXIII.B.  §93.109(k)
 §93.121(c)
Limited maintenance plans XXIII.C.  §93.101
 §93.109(j)
 §93.121(c)
Transportation plan and modeling requirements (moderate and above classifications) XXIII.D.  §93.106(b)
 §93.122(c)
Non-federal projects (for isolated rural areas only) XXIII.F.  §93.121(b)(1)
Implementation of budget test XXIII.H.
XXIII.I.
 §93.118(b)
 §93.118(d)
Exempt projects XXIII.J.  §93.126
Conformity SIPs XXV.   Not applicable
 
PM 10 Build/no-build test IV.C.  §93.119(d)
 §93.119(g)(2)
Hot-spots XII. No new or revised regulatory text being finalized at this time
Federal projects during a lapse XIV.  §93.102(c)
 §93.104(d)
Adequacy process of submitted SIPs XV.
XXIII.G.
 §93.118(e)
 §93.118(f)
Non-federal projects during a lapse XVI.  §93.121(a)
Consequences of SIP disapprovals XVII.  §93.120(a)(2)
Safety margins XVIII. Deletes §93.124(b) of previous rule
Frequency XIX.  §93.104(c)
 §93.104(e)
Latest planning assumptions XX.  §93.110(a)
Horizon years in hot-spot analyses XXI.  §93.116
Relying on a previous analysis XXII.  §93.122(g)
 §93.104(b)
 §93.104(c)
Definitions XXIII.A.  §93.101
Insignificance XXIII.B.  §93.109(k)
 §93.121(c)
Limited maintenance plans XXIII.C.  §93.101
 §93.109(j)
 §93.121(c)
Clarification to Precursors XXIII.E.  §93.102(b)(2)(iii)
 §93.119(f)(5)
Non-federal projects (for isolated rural areas only) XXIII.F.  §93.121(b)(1)
Implementation of budget test XXIII.H.
XXIII.I.
 §93.118(b)
 §93.118(d)
Exempt projects XXIII.J.  §93.126
Conformity SIPs XXV.   Not applicable
 
CO Build/no-build test (lower CO classifications) IV.C.  §93.119(c)
 §93.119(g)(2)
Regional conformity tests (higher CO classifications) IV.D.  §93.119(c)(1)
Federal projects during a lapse XIV.  §93.102(c)
 §93.104(d)
Adequacy process of submitted SIPs XV.
XXIII.G.
 §93.118(e)
 §93.118(f)
Non-federal projects during a lapse XVI.  §93.121(a)
Consequences of SIP disapprovals XVII.  §93.120(a)(2)
Safety margins XVIII. Deletes §93.124(b) of previous rule
Frequency XIX.  §93.104(c)
 §93.104(e)
Latest planning assumptions XX.  §93.110(a)
Horizon years in hot-spot analyses XXI.  §93.116
Relying on a previous analysis XXII.  §93.122(g)
 §93.104(b)
 §93.104(c)
Definitions XXIII.A.  §93.101
Insignificance XXIII.B.  §93.109(k)
 §93.121(c)
Limited maintenance plans XXIII.C.  §93.101
 §93.109(j)
 §93.121(c)
Transportation plan and modeling requirements (moderate and serious classifications XXIII.D.  §93.106(b)
 §93.122(c)
Non-federal projects (for isolated rural areas only) XXIII.F.  §93.121(b)(1)
Implementation of budget test XXIII.H.
XXIII.I.
 §93.118(b)
 §93.118(d)
Exempt projects XXIII.J.  §93.126
Conformity SIPs XXV.   Not applicable
 
NO2 Build/no-build test IV.C.  §93.119(d)
 §93.119(g)(2)
Federal projects during a lapse XIV.  §93.102(c)
 §93.104(d)
Adequacy process of submitted SIPs XV.
XXIII.G.
 §93.118(e)
 §93.118(f)
Non-federal projects during a lapse XVI.  §93.121(a)
Consequences of SIP disapprovals XVII.  §93.120(a)(2)
Safety margins XVIII. Deletes §93.124(b) of previous rule
Frequency XIX.  §93.104(c)
 §93.104(e)
Latest planning assumptions XX.  §93.110(a)
Relying on a previous analysis XXII.  §93.122(g)
 §93.104(b)
 §93.104(c)
Definitions XXIII.A.  §93.101
Insignificance XXIII.B.  §93.109(k)
 §93.121(c)
Non-federal projects (for isolated rural areas only) XXIII.F.  §93.121(b)(1)
Implementation of budget test XXIII.H.
XXIII.I.
 §93.118(b)
 §93.118(d)
Exempt projects XXIII.J.  §93.126
Conformity SIPs XXV.  Not applicable

For further information or assistance regarding this Web page, contact Rudy Kapichak, phone: (734) 214-4574, e-mail: kapichak.rudolph@epa.gov