State and Local Transportation Resources
Transportation Conformity Regulations - What Parts of the Final Rule Apply to Me?
The table in Federal Register notice 69 FR 40006-7, Section II.D., "What Parts of the Final Rule Apply to Me?", is incomplete. EPA intends to publish a correction notice in the Federal Register in the near future. All other preamble and regulatory text printed in the July 1, 2004 Notice are correct. Conformity implementers can begin to use the preamble and regulation as published.
Type of Area:
- 8-hour ozone
- PM2.5 - fine particles
- 1-hour ozone
- PM10 - particles up to 10 microns in diameter
- Carbon monoxide (CO)
- Nitrogen Dioxide (NO2)
| Complete List of Issues Addressed in the July 1, 2004 Final Conformity Rule (69 FR 40006-7) (Replaces the table in Section II. D. "What Parts of the Final Rule Apply to Me?") | |||
| Type of Area | Issue Addressed in Final Rule | Preamble Section | Regulatory Section |
|---|---|---|---|
| 8-hour ozone | Conformity grace period | III.A. | §93.102(d) |
| Revocation of 1-hour ozone standard | III.B. | Not applicable | |
| General implementation of new standards | III.C. | Not applicable | |
| Early Action Compacts | III.D. | Not applicable | |
| Baseline year test | IV.B. | §93.119(b) | |
| Build/no-build test (marginal classification and subpart 1 areas 1) | IV.C. | §93.119(b)(2) §93.119(g)(2) | |
| Regional conformity tests (moderate and above classifications) | IV.D. | §93.119(b)(1) | |
| Regional conformity tests (areas without 1-hour ozone budgets) | V. | §93.109(d) | |
| Regional conformity tests (areas with 1-hour ozone budgets) | VI. | §93.109(e) | |
| Federal projects during a lapse | XIV. | §93.102(c) §93.104(d) | |
| Adequacy process of submitted SIPS | XV. XXIII.G. |
§93.118(e) §93.118(f) | |
| Non-federal projects during a lapse | XVI. | §93.121(a) | |
| Consequences of SIP disapprovals | XVII. | §93.120(a)(2) | |
| Safety margins | XVIII. | Deletes §93.124(b) of previous rule | |
| Frequency | XIX. | §93.104(c) §93.104(e) | |
| Latest planning assumptions | XX. | §93.110(a) | |
| Relying on a previous analysis | XXII. | §93.122(g) §93.104(b) §93.104(c) | |
| Definitions | XXIII.A. | §93.101 | |
| Insignificance | XXIII.B. | §93.109(k) §93.121(c) | |
| Transportation plan and modeling requirements (moderate and above classifications) | XXIII.D. | §93.106(b) §93.122(c) | |
| Non-federal projects (for isolated rural areas only) | XXIII.F. | §93.121(b)(1) | |
| Implementation of budget tests | XXIII.H. XXIII.I. |
§93.118(b) §93.118(d) | |
| Exempt projects | XXIII.J. | §93.126 | |
| Conformity SIPs | XXV. | Not applicable | |
| 1 "Subpart 1 areas" are areas that are designated nonattainment under subpart 1 of part D of title 1 of the Clean Air Act. EPA also referred to these areas as "basic" nonattainment areas in its April 30, 2004 final designations rule for the 8-hour ozone standard (69 FR 23862). | |||
| PM 2.5 | Applicability | III.A. | §93.102(b)(1) |
| Conformity grace period | III.A. | §93.102(d) | |
| General implementation of new standards | III.C. | Not applicable | |
| Baseline year test | IV.B. | §93.119(e) | |
| Build/no-build test | IV.C. | §93.119(e) §93.119(g)(2) | |
| Regional conformity tests | VII. | §93.109(i) | |
| Direct PM 2.5 in regional analyses from tailpipe, brake wear, tire wear | VIII. | §93.102(b)(1) | |
| Precursors in regional analyses | VIII. | No regulatory text being finalized at this time | |
| Re-entrained road dust in regional analyses | IX. | §93.102(b)(3) §93.119(f) | |
| Construction-related fugitive dust in regional analyses | X. | §93.122(f) | |
| Compliance with SIP control measures | XI. | §93.117 | |
| Hot-spots | XII. | No regulatory text being finalized at this time | |
| Federal projects during a lapse | XIV. | §93.102(c) §93.104(d) | |
| Adequacy process of submitted SIPs | XV. XXIII.G. |
§93.118(e) §93.118(f) | |
| Non-federal projects during a lapse | XVI. | §93.121(a) | |
| Consequences of SIP disapprovals | XVII. | §93.120(a)(2) | |
| Safety margins | XVIII. | Deletes §93.124(b)of previous rule | |
| Frequency | XIX. | §93.104(c) §93.104(e) | |
| Latest planning assumptions | XX. | §93.110(a) | |
| Relying on a previous analysis | XXII. | §93.122(g) §93.104(b) §93.104(c) | |
| Definitions | XXIII.A. | §93.101 | |
| Insignificance | XXIII.B. | §93.109(k) §93.121(c) | |
| Non-federal projects (for isolated rural areas only) | XXIII.F. | §93.121(b)(1) | |
| Implementation of budget tests | XXIII.H. XXIII.I. |
§93.118(b) §93.118(d) | |
| Exempt projects | XXIII.J. | §93.126 | |
| Conformity SIPs | XXV. | Not applicable | |
| 1-hour ozone | Revocation of 1-hour ozone standard | III.B. | Not applicable |
| Regional conformity tests | III.B. | §93.109(c) | |
| Build/no-build test (marginal and below classifications) | IV.C. | §93.119(b)(2) §93.119(g)(2) | |
| Regional conformity test (moderate and above classifications) | IV.D. | §93.119(b)(1) | |
| Federal projects during a lapse | XIV. | §93.102(c) §93.104(d) | |
| Adequacy process of submitted SIPs | XV. XXIII.G. |
§93.118(e) §93.118(f) | |
| Non-federal projects during a lapse | XVI. | §93.121(a) | |
| Consequences of SIP disapprovals | XVII. | §93.120(a)(2) | |
| Safety margins | XVIII. | Deletes §93.124(b) of previous rule | |
| Frequency | XIX. | §93.104(c) §93.104(e) | |
| Latest planning assumptions | XX. | §93.110(a) | |
| Relying on a previous analysis | XXII. | §93.122(g) §93.104(b) §93.104(c) | |
| Definitions | XXIII.A. | §93.101 | |
| Insignificance | XXIII.B. | §93.109(k) §93.121(c) | |
| Limited maintenance plans | XXIII.C. | §93.101 §93.109(j) §93.121(c) | |
| Transportation plan and modeling requirements (moderate and above classifications) | XXIII.D. | §93.106(b) §93.122(c) | |
| Non-federal projects (for isolated rural areas only) | XXIII.F. | §93.121(b)(1) | |
| Implementation of budget test | XXIII.H. XXIII.I. |
§93.118(b) §93.118(d) | |
| Exempt projects | XXIII.J. | §93.126 | |
| Conformity SIPs | XXV. | Not applicable | |
| PM 10 | Build/no-build test | IV.C. | §93.119(d) §93.119(g)(2) |
| Hot-spots | XII. | No new or revised regulatory text being finalized at this time | |
| Federal projects during a lapse | XIV. | §93.102(c) §93.104(d) | |
| Adequacy process of submitted SIPs | XV. XXIII.G. |
§93.118(e) §93.118(f) | |
| Non-federal projects during a lapse | XVI. | §93.121(a) | |
| Consequences of SIP disapprovals | XVII. | §93.120(a)(2) | |
| Safety margins | XVIII. | Deletes §93.124(b) of previous rule | |
| Frequency | XIX. | §93.104(c) §93.104(e) | |
| Latest planning assumptions | XX. | §93.110(a) | |
| Horizon years in hot-spot analyses | XXI. | §93.116 | |
| Relying on a previous analysis | XXII. | §93.122(g) §93.104(b) §93.104(c) | |
| Definitions | XXIII.A. | §93.101 | |
| Insignificance | XXIII.B. | §93.109(k) §93.121(c) | |
| Limited maintenance plans | XXIII.C. | §93.101 §93.109(j) §93.121(c) | |
| Clarification to Precursors | XXIII.E. | §93.102(b)(2)(iii) §93.119(f)(5) | |
| Non-federal projects (for isolated rural areas only) | XXIII.F. | §93.121(b)(1) | |
| Implementation of budget test | XXIII.H. XXIII.I. |
§93.118(b) §93.118(d) | |
| Exempt projects | XXIII.J. | §93.126 | |
| Conformity SIPs | XXV. | Not applicable | |
| CO | Build/no-build test (lower CO classifications) | IV.C. | §93.119(c) §93.119(g)(2) |
| Regional conformity tests (higher CO classifications) | IV.D. | §93.119(c)(1) | |
| Federal projects during a lapse | XIV. | §93.102(c) §93.104(d) | |
| Adequacy process of submitted SIPs | XV. XXIII.G. |
§93.118(e) §93.118(f) | |
| Non-federal projects during a lapse | XVI. | §93.121(a) | |
| Consequences of SIP disapprovals | XVII. | §93.120(a)(2) | |
| Safety margins | XVIII. | Deletes §93.124(b) of previous rule | |
| Frequency | XIX. | §93.104(c) §93.104(e) | |
| Latest planning assumptions | XX. | §93.110(a) | |
| Horizon years in hot-spot analyses | XXI. | §93.116 | |
| Relying on a previous analysis | XXII. | §93.122(g) §93.104(b) §93.104(c) | |
| Definitions | XXIII.A. | §93.101 | |
| Insignificance | XXIII.B. | §93.109(k) §93.121(c) | |
| Limited maintenance plans | XXIII.C. | §93.101 §93.109(j) §93.121(c) | |
| Transportation plan and modeling requirements (moderate and serious classifications | XXIII.D. | §93.106(b) §93.122(c) | |
| Non-federal projects (for isolated rural areas only) | XXIII.F. | §93.121(b)(1) | |
| Implementation of budget test | XXIII.H. XXIII.I. |
§93.118(b) §93.118(d) | |
| Exempt projects | XXIII.J. | §93.126 | |
| Conformity SIPs | XXV. | Not applicable | |
| NO2 | Build/no-build test | IV.C. | §93.119(d) §93.119(g)(2) |
| Federal projects during a lapse | XIV. | §93.102(c) §93.104(d) | |
| Adequacy process of submitted SIPs | XV. XXIII.G. |
§93.118(e) §93.118(f) | |
| Non-federal projects during a lapse | XVI. | §93.121(a) | |
| Consequences of SIP disapprovals | XVII. | §93.120(a)(2) | |
| Safety margins | XVIII. | Deletes §93.124(b) of previous rule | |
| Frequency | XIX. | §93.104(c) §93.104(e) | |
| Latest planning assumptions | XX. | §93.110(a) | |
| Relying on a previous analysis | XXII. | §93.122(g) §93.104(b) §93.104(c) | |
| Definitions | XXIII.A. | §93.101 | |
| Insignificance | XXIII.B. | §93.109(k) §93.121(c) | |
| Non-federal projects (for isolated rural areas only) | XXIII.F. | §93.121(b)(1) | |
| Implementation of budget test | XXIII.H. XXIII.I. |
§93.118(b) §93.118(d) | |
| Exempt projects | XXIII.J. | §93.126 | |
| Conformity SIPs | XXV. | Not applicable | |
For further information or assistance regarding this Web page, contact Rudy Kapichak, phone: (734) 214-4574, e-mail: kapichak.rudolph@epa.gov