Jump to main content.


Table 1. Selected National Consensus Codes and Recommended Practices for UST Management 53 FR 37082-37247 Friday, Sept. 23, 1988 40 CFR Parts 280 and 281, Underground Storage Tanks; Technical Requirements and State Program Approval; Final Rules

Table 1. Selected National Consensus Codes and Recommended Practices for UST Management

Major Technical Topics of the Final EPA UST Rule

Document Number

Design and Construction

Corrosion Protection

Installation

UST System Repair and Retrofit

Operating Requirement

Release Detection

Release Reporting and Corrective Action

Closure

American National Standards Institute (ANSI)

ANSI B31.4

X

X

X

X

X

X

X

X

American Petroleum Institute (API)

*

API 5L

X

*

API 12F

X

API 650

X

API 1604

X

*

API 1615

X

X

X

X

API 1628

X

X

*

API 1631

X

X

X

X

API 1632

X

X

X

X

API 2202

X

American Society for Testing and Materials (ASTM)

ASTM (Steel Piping, Tubing, and Fittings)

X

*

ASTM A 53-87b

X

*

ASTM A182/A182M-87

X

X

*

ASTM D 4021-86

X

Major Technical Topics of the Final EPA UST Rule

Document Number

Design and Construction

Corrosion Protection

Installation

UST System Repair and Retrofit

Operating Requirement

Release Detection

Release Reporting and Corrective Action

Closure

Association of Composite Tanks (ACT)

*

ACT 100

X

X

X

X

Factory Mutual (FM)

FM 1920

X

X

National Association of Corrosion Engineers (NACE)

NACE RP-0169-83

X

X

X

X

X

NACE RP-0172-72

X

X

X

NACE RP-0184-84

X

X

NACE RP-0275-75

X

X

NACE RP-0285-85

X

X

X

X

X

NACE RP-0572-85

X

X

X

X

X

National Fire Protection Association (NFPA)

*

NFPA 30

X

X

X

X

X

X

*

NFPA 321

X

X

X

*

NFPA 327

X

*

NFPA 328

X

X

*

NFPA 329

X

X

X

X

*

NFPA 385

X

National Leak Prevention Association (NLPA)

**

NLPA 631

X

X

X

X

X

Major Technical Topics of the Final EPA UST Rule

Document Number

Design and Construction

Corrosion Protection

Installation

UST System Repair and Retrofit

Operating Requirement

Release Detection

Release Reporting and Corrective Action

Closure

Owens Corning (OC)

OC 3-PE-9632-A

X

X

Petroleum Equipment Institute (PEI)

*

PEI/RP100

X

X

X

X

X

X

X

Steel Tank Institute (STI)

STI (Installation of STI-P3)

X

X

STI (Interior Corrosion Control)

X

X

X

X

STI (Exterior Corrosion Protection)

X

X

X

STI (Dual Wall USTs)

X

X

X

Underwriters Laboratories (UL)

UL 58

X

UL 567

X

X

UL 1316

X

X

Western Fire Chiefs Association

*

UFC 1985

X

X

X

X

X

X

X

X

*

Revised in 1987

**

Drafted in 1987

*-

There is a code or recommended practice.

BILLING CODE 6560-50-C

[Back to Text]

Top of page


Local Navigation


Jump to main content.