Site Photographs
Click on the small images to view the full sized photos
(1 of 7) Drum removal during the trench excavation for the groundwater conveyance pipe.
(2 of 7) Existing freshwater drainage ditch on-Site.
(3 of 7) Reconstruction of the on-Site freshwater drainage ditch.
(4 of 7) Photo showing completed construction in the area along deceleration lane shoulder. Approximately 1,000 feet of pipe was installed in the project.
(5 of 7) Excavation of freshwater drainage ditch along Lezzer Lumber/Woodmont property.
(6 of 7) Completed section of freshwater drainage ditch along PA Route 26 and access road to new shopping center.
(7 of 7) New shopping center on Woodmont property. Note concrete plant in background.
![[logo] US EPA](http://www.epa.gov/epafiles/images/logo_epaseal.gif)






