Jump to main content.


Site Photographs

Click on the small images to view the full sized photos

Slide Show 1  - Internal development of Pump and Treat facility

Greenwood Chemical Site
4/8/99

Greenwood Chemical Site
4/8/99

Greenwood Chemical Site
4/8/99

Greenwood Chemical Site
5/25/99

Greenwood Chemical Site
5/25/99

Greenwood Chemical Site
5/25/99

Greenwood Chemical Site
5/25/99

Greenwood Chemical Site
7/15/99

Greenwood Chemical Site
7/15/99

Greenwood Chemical Site
12/1/99

Slide Show 2 - Continuing construction. External view of Pump and Treat construction.

Greenwood Chemical Site
4/8/99

Greenwood Chemical Site
5/25/99

Greenwood Chemical Site
7/15/99

Greenwood Chemical Site
12/1/99

Additional Photos

Greenwood Chemical Site
4/8/99 - Overlooking the site from behind the contractor's trailers.

Greenwood Chemical Site
Lagoon 1 with geese.

Greenwood Chemical Site
Earth removal between lagoons and Pump and Treat facility.

Greenwood Chemical Site
Welding metal beam into place.

Greenwood Chemical Site
The old barn (last original building onsite predating Greenwood Chemical).

Greenwood Chemical Site
Water truck keeping down the dust during construction.

Greenwood Chemical Site
Reseeding native grasses behind the contractor's trailers.

Greenwood Chemical Site
Pipes being laid near the front entrance of the site.

Greenwood Chemical Site
Pouring concrete.

Greenwood Chemical Site
The Remedial Project Manager inspecting the old warehouse to be used in housing construction materials.

Greenwood Chemical Site
Abandoned machinery from the chemical plant's operation days.

Greenwood Chemical Site
Electrical Room.

Greenwood Chemical Site
Lagoon 2.

Region 3 | Mid-Atlantic Cleanup | Mid-Atlantic Superfund |EPA Home | EPA Superfund Homepage


Local Navigation


Jump to main content.