Soil Removal and Property Restoration of the Initial Nineteen (19) Residential Properties
As an interim measure, the Administrative Order on Consent (AOC) requires Exide to clean-up nineteen properties adjacent to the facility as directed by a Consent Order and Agreement with the Pennsylvania Department of Environmental Protection (PADEP), which was issued on May 22, 2000. The clean-up consists of removing contaminated soil, backfilling with clean soil and restoring the properties as close as possible to their original state. After soil removal, Exide conducted confirmatory sampling to verify that each property achieved the cleanup level. The clean up of the nineteen properties were completed in October 2000. The following photos were taken during the clean-ups.
| Figure 1: Excavation Preparation Before Soil Removal |
| Figure 2: Soil Removal of Residential Properties |
| Figure 3: Hand Excavation in Narrow Areas |
| Figure 4: Completion of Soil Removal |
| Figure 5: Restoration of Residential Properties |
| Figure 6: Final Layer of Topsoil Before Re-seeding |
| Figure 7: Residential Property Re-seeded |
| Figure 8: Completion of Property Restoration |
Figure 1 |
Figure 2 |
Figure 3 |
Figure 4 |
|
Figure 5 |
Figure 6 |
Figure 7 |
Figure 8 |