Jump to main content.


EPA's Permit for MWRA Outfall

In fall 2000, the Massachusetts Water Resources Authority (MWRA) completed a multibillion dollar sewage treatment facility on Deer Island in Boston Harbor. This facility provides secondary treatment to wastewater from 43 cities and towns in the Greater Boston area. The NPDES permit for the facility's discharge was issued on May 20, 1999 and modified on July 10, 2000. (See below for a discussion of the facility's permit.)

On January 13, 2003 the federal Environmental Protection Agency (EPA) proposed a second modification to the permit that (i) adds reporting requirements to the sludge monitoring requirement and (ii) revises numerical limitations and monitoring requirements for the MWRA's combined sewer overflows, based on the most current MA water quality standards. All other conditions of the existing permit, including effluent limitations and monitoring requirements, will remain unchanged. The public notice period for the proposed modification is closed. Response to comments and the final issuance permit modification will be posted here, when available. Read the draft permit modification.

The current permit imposes rigorous conditions to ensure the protection of Massachusetts and Cape Cod Bays. In fact, the permit is the most comprehensive of its type ever issued for a municipal discharger. The permit includes unprecedented ambient monitoring requirements; stringent pollution prevention, and best management practice requirements; and a first-of-its-kind requirement to implement a "contingency plan," to help ensure that any unexpected problems are dealt with swiftly.

Key permit conditions include:

Executive Summary
Announcement of Issuance Executive Summary of Permit... Introduction... History of the permit... more

  Questions & Answers
What is an NPDES permit, and why does the MWRA need one?... Who issues the MWRA's permit?... How does the public participate in the permit process?... more

Background

Press Releases

 

MWRA Permit

Draft Modification 2

Modification 1 (PDF) (33 pp., 109 KB)

Original Permit (PDF) (35 pp., 84 KB)

Permit Attachments
List of Attachments - NPDES Permit No. MA0103284 Boston, MA... more
  Response to Public Comments (PDF) (102 pp., 315 KB)
OMSAP
Outfall Monitoring Science Advisory Panel. Panel advises EPA and MA DEP on scientific and technical matters .... more
  EPA MWRA Permit List Server
Join the listserver to get informed of MWRA reports recently received by the US EPA... more
Contacts
 

MWRA Click icon for EPA disclaimer.

MWRA Contingency Plan Click icon for EPA disclaimer.

Serving Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island, Vermont, & Tribal Nations


Local Navigation


Jump to main content.