Jump to main content.


Tennessee Products NPL Cleanup Site Documents

Adobe Reader Required. Some of the PDF files are very large, please allow time for downloading.
Remedial Investigation/Feasibility Study-- all 10 sections and Appendices C, D, and F.
Table of Contents (PDF File, 31K)
Section 1, Introduction (PDF File, 6.7M)
Section 2, Hydrogeologic Investigation (PDF File, 2.2M)
Section 3, Air Investigation (PDF File, 454K)
Section 4, Waste Investigation (PDF File, 327K)
Section 5, Soil Investigation (PDF File, 6.1M)
Section 6, Surface Water/Sediment Investigation (PDF File, 931K)
Section 7, Groundwater Investigation (PDF File, 2.3M)
Section 8, Contaminant Fate and Transport Analysis (PDF File, 28K)
Section 9, Summary and Conclusions (PDF File, 16K)
Section 10, References (PDF File, 15K)
Appendix C, Slug Test Analyses (PDF File, 34K)
Appendix D, Field Measurements (PDF File, 9K)
Appendix F, Groundwater Modeling (PDF File, 1.7M)
Baseline Risk Assessment--covers report but not Appendices A-L.
Table of Contents (PDF File, 23K)
Baseline Risk Assessment Report (PDF File, 1.4M)
Ecological Risk Assessment (PDF, 26.3M)
Non-Time Critical Removal Final Report (PDF, 146M)
Focused Feasibility Study (PDF, 3.0M)
Proposed Plan Fact Sheet, August 2002 (PDF, 270K)

For information about the contents of this page please contact Brenda Gaillard


Local Navigation


Jump to main content.