Jump to main content.


Photos

2014

Foaming eastern wall of Area 5S  02/27/2014

Excavating and stabilizing soil at the bottom of the former river excavation area - Oct. 24, 2014

Foaming eastern wall of Area 5S  02/27/2014

Foaming eastern wall of Area 5S - February 27, 2014

 

Breaking down concrete structures in Area 5S  02/27/2014

Breaking down concrete structures in Area 5S - February. 27, 2014

Excavation activities at base of former gas relief holder in Area 5S

Excavation activities at base of former gas relief holder in Area 5S - March 6, 2014

Loading trucks from eastern wall of Area 5S

Loading trucks from eastern wall of Area 5S - March 7, 2014

May 2005

Description of photo

EPA's Ross Del Rosario describes removal project to environmental officials from India.

Description of photo

Truck being loaded with contaminated soil for removal to landfill.
 

Description of photo

Steel sheet pile wall is exposed after contaminated soil removed.

Description of photo

Using crushed limestone as "backfill" to replace contaminated soil.

Description of photo

Crushed limestone "backfill" being compacted.
 


Local Navigation


Jump to main content.