EPA Cleanups: GE-Pittsfield/Housatonic River Site
Former Filled Oxbows - Reports
The following list of reports and documents has been selected to provide an overview of the environmental investigations and remedial actions conducted for the Oxbow Areas. Most of the available reports and documents were produced for General Electric by their environmental consultants.
On this page:
- Lyman Street Area and Former Filled Oxbow B
- Former Filled Oxbows A and C
- Newell Street Area I
- Newell Street Area II
- Former Filled Oxbows J and K
- General
Lyman Street Area and Former Filled Oxbow B
- Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA) and Gorski (MDEP), January 3, 2013, Re: Lyman Street Area; 1 1/2 Mile Reach of Housatonic River; Upper 1/2 Mile Reach of Housatonic River Summary of 2012 Conditional Solution Inspection Activities (PDF) (14 pp, 201K)
- Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA) and Gorski (MDEP), December 21, 2012, Re: Lyman Street Area Summary of Annual ERE Inspection for Portion of the Lyman Street Sidewalk (PDF) (4 pp, 159K)
- Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), October 4, 2012, Re: Lyman Street Area, Summary of September 2012 Inspection Activities (PDF) (24 pp, 1.2MB)
- Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), June 21, 2012, Re: Lyman Street Area; Summary of May 2012 Inspection Activities (PDF) (20 pp, 15.6MB)
- Letter (with attachments) from Gate (GE) to Tagliaferro (USEPA) and Gorski (MDEP), December 16, 2011, Re: Lyman Street Area Summary of Annual ERE Inspection of Portion of the Lyman Street Sidewalk (PDF) (4 pp, 163K)
- Letter (with attachments) from Gate (GE) to Tagliaferro (USEPA) and Gorski (MDEP), December 16, 2011, Re: Lyman Street Area Summary of 2011 Conditional Solution Inspection Activities (PDF) (16 pp, 352K)
- Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), October 19, 2011, Re: Lyman Street Area Summary of September 2011 Inspection Activities (PDF) (25 pp, 1.3MB)
- Letter (with attachments) from Gates (GE) to Pelto (MADEP), August 12, 2011, Re: Lyman Street Area Summary of July 2011 Inspection of Natural Resource Restoration/Enhancement Measures (PDF) (20 pp, 1.4MB)
- Letter (with attachments) from Gates (GE) to Pelto (MDEP), June 22, 2011, Re: Lyman Street Area Summary of May 2011 Inspection of Natural Resource Restoration/Enhancement Measures (PDF) (10 pp, 1.3MB)
- Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), June 21, 2011, Re: Lyman Street Area Summary of May 2011 Inspection Activities (PDF) (20 pp, 2MB)
- Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA) and Gorski (MADEP), December 14, 2010, Re: Lyman Street Area Summary of 2010 Conditional Solution Inspection Activities (PDF) (16 pp, 1.3MB)
- Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA) and Gorski (MADEP), December 14, 2010, Re: Lyman Street Area Summary of Annual ERE Inspection for Portion of the Lyman Street Sidewalk (PDF) (4 pp, 940K)
- Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), October 6, 2010, Re: Lyman Street Area Summary of September 2010 Inspection Activities (PDF) (29 pp, 1.2MB)
- Letter (with attachments) from Gates (GE) to Pelto (MDEP), September 23, 2010, Re: Lyman Street Area Summary of August 2010 Inspection of Natural Resource Restoration/Enhancement Measures (PDF) (9 pp, 1.2MB)
- Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), June 4, 2010, Re: Lyman Street Area Summary of May 2010 Inspection Activities (PDF) (26 pp, 1.3MB)
- Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA) and Gorski (MADEP), December 17, 2009, Re: Lyman Street Area Summary of 2009 Conditional Solution Inspection Activities (PDF) (14 pp, 326K)
- Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA) and Gorski (MADEP), December 15, 2009, Re: Lyman Street Area Summary of Annual ERE Inspection for Portion of the Lyman Street Sidewalk (PDF) (4 pp, 92K)
- Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), October 9, 2009, Re: Lyman Street Area Summary of September 2009 Inspection Activities (PDF) (34 pp, 1MB)
- Pollution Report (POLREP) #2 and Final - Lyman Street Area Removal Action Area (RAA), September 16, 2009 (PDF) (6 pp, 91K)
- Letter (with enclosure) from Tagliaferro (USEPA) to Gates (GE), September 14, 2009, Re: EPA Approval of, and Certificate of Completion for, General Electric's submittal entitled Final Completion Report for Removal Action for the Lyman Street Area Removal Action, dated August 2009 (PDF) (3 pp, 101K)
- Letter from Tor (MDEP) to Tagliaferro (USEPA), September 10, 2009, Re: Approval of Final Completion Report for the Lyman Street Removal Action (PDF) (1 pg, 241K)
- Letter (wirh Enclosure) from Gates (GE) to Tagliaferro (USEPA), August 27, 2009, Re: Lyman Street Area Final Completion Report for the Lyman Street Area Removal Action (PDF) (1,621 pp, 78.5MB)
- Letter (with attachments) from Gates (GE) to Young (MEOEEA), August 20, 2009, Re: Lyman Street Area Summary of July 2009 Inspection of Natural Resource Restoration/Enhancement Measures (PDF) (12 pp, 1.7MB)
- Letter (with attachments) from Gates (GE) to Young (MEOEEA), July 1, 2009, Re: Lyman Street Area Summary of June 2009 Inspection of Natural Resource Restoration/Enhancement Measures (PDF) (14 pp, 1.7MB)
- Letter(with attachments) from Gates (GE) to Tagliaferro (USEPA), June 16, 2009, Re: Lyman Street Area Summary of May 2009 Inspection Activities (PDF) (29 pp, 719K)
- Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA) and Steenstrup (MADEP), December 18, 2008, Re: Lyman Street Area Summary of 2008 Conditional Solution Inspection Activities (PDF) (14 pp, 114K)
- Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), September 17, 2008, Re: Lyman Street Area Summary of August 2008 Inspection Activities (PDF) (33 pp, 778K)
- Letter from Young (EOEEA) to Gates (GE), September 2, 2008, Re: Certification of Completion of Installation of Restoration Work Newell Street Area II and Lyman Street Area (PDF) (2 pp, 63K)
- Letter (with attachments) from Gates (GE) to Young (MEOEEA), August 27, 2008, Re: Lyman Street Area Summary of July 2008 Inspection of Natural Resource Restoration/Enhancement Measures (PDF) (15 pp, 1.5MB)
- Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), June 18, 2008, Re: Lyman Street Area Summary of May 2008 Inspection Activities (PDF) (31 pp, 805K)
- Letter from Gates (GE) to Tagliaferro (USEPA) and Steenstrup (MADEP), December 21, 2007, Re Lyman Street Area Summary of 2007 Condtional Solution Inspection Activites (PDF) (12 pp, 144K)
- Letter (with report) from Gates (GE) to Tagliaferro (USEPA), December 13, 2007, Re: Lyman Street Area Summary of December 2007 Inspection Activities (PDF) (8 pp, 420K)
- Letter (with report) from Gates (GE) to Tagliaferro (USEPA), November 21, 2007, Re: Lyman Street Area, Summary of October 2007 Inspection Activities (PDF) (10 pp, 352K)
- Letter from Tagliaferro (USEPA) to Gates (GE), July 12, 2007, Re: Approval of General Electric's July 11, 2007 submittal titled Lyman Street Area - Properties East of Lyman Street; Construction of Infiltration Area (PDF) (2 pp, 25K)
- Letter from Gates (GE) to Tagliaferro (USEPA), July 11, 2007, Re: Lyman Street Area, Summary of May 2007 Inspection Activities (PDF) (11 pp, 568K)
- Letter from Gates (GE) to Tagliaferro (USEPA), July 11, 2007, Re: Lyman Street Area - Properties East of Lyman Street Construction of Infiltration Area (PDF) (4 pp, 564K)
- Letter from Tagliaferro (USEPA) to Gates (GE), June 8, 2007, Re: Conditional Approval of General Electric's May 22, 2007 submittal titled Lyman Street Area - Properties East of Lyman Street; EPA Requested Information and Analytical Data for Proposed Backfill Sources and General Electric's June 4, 2007 submittal titled Lyman Street Area - Properties East of Lyman Street; EPA Requested Information and Analytical Data for Proposed Topsoil Source (PDF) (2 pp, 27K)
- Letter from Gates (GE) to Tagliaferro (USEPA), June 4, 2007, Re: Lyman Street Area - Properties East of Lyman Street EPA Requested Information and Analytical Data for Proposed Topsoil Source (PDF) (7 pp, 1.3MB)
- Letter from Gates (GE) to Tagliaferro (USEPA), May 22, 2007, Re: Lyman Street Area - Properties East of Lyman Street EPA Requested Information and Analytical Data for Proposed Backfill Sources (PDF) (11 pp, 2.4MB)
- Letter from Gates (GE) to Tagliaferro (USEPA), April 25, 2007, Re: Lyman Street Area - Properties East of Lyman Street Supplemental Information Package Addendum (PDF) (5 pp, 1.2MB)
- Letter from Tagliaferro (USEPA) to Gates (GE), April 16, 2007, Re: Conditional Approval of General Electric's March 29, 2007 submittal titled Lyman Street Area - Properties East of Lyman Street; Supplemental Information Package (PDF) (3 pp, 25K)
- Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), March 29, 2007, Re: Lyman Street Area - Properties East of Lyman Street Supplemental Information Package (PDF) (291 pp, 14MB)
- Letter from Gates (GE) to Tagliaferro (USEPA), January 3, 2007, Lyman Street Area Summary of November 2006 Inspection Activities (PDF) (10 pp, 413K)
- Letter from Tagliaferro (USEPA) to Silfer (GE), October 18, 2006, Re: Approval of General Electric's October 5, 2006 submittal titled Former Oxbow A & C, Former Oxbow J& K, and Lyman Street Area - Properties West of Lyman Street; Addendum to Supplemental Information Package (PDF) (2 pp, 90K)
- Letter from Gates (GE) to Tagliaferro (USEPA), October 5, 2006, Former Oxbow Areas A and C, Former Oxbow Areas J and K, Lyman Street Area - Properties West of Lyman Street Addendum to Supplemental Information Package (PDF) (32 pp, 1.6MB)
- Letter from Lovely (USEPA) to Silfer (GE), July 7, 2006, Conditional Approval of GE's June 15, 2006 Former Oxbow A & C, Former Oxbow J & K, and Lyman Street Area-Properties West of Lyman Street, Supplemental Information Package (PDF) (2 pp, 133K)
- Letter and attachments from Gates (GE) to Lovely (USEPA), June 15, 2006, Supplemental Information Package Former Oxbow Areas A and C, Former Oxbow Areas J and K, and Lyman Street Area - Properties West of Lyman Street (PDF) (478 pp, 16.4MB)
- April 13, 2006 approval letter from William Lovely, EPA to Andrew Silfer, GE Re: Approval of General Electric’s submittal titled Addendum to Final Removal Design/Removal Action Work Plan for Lyman Street Area (PDF) (2 pp, 61K)
- Addendum to Final Removal Design / Removal Action Work Plan for Lyman Street Area, April 4, 2006 (PDF) (30 pp, 1.4MB)
- March 6, 2006 approval letter from William Lovely, EPA to Andrew Silfer, GE Re: Conditional Approval of General Electric's submittal titled Final Removal Design/Removal Action Work Plan for the Lyman Street Area (PDF) (4 pp, 204K)
- Final Removal Design/Removal Action Work Plan for Lyman Street Area, Blasland, Bouck, & Lee, Inc., September 2005 (PDF) (146 pp, 7MB)
- June 2, 2005 approval letter from William Lovely, EPA to Andrew Silfer, GE Re: Approval of General Electric's submittal titled Conceptual Removal Design/Removal Action Work Plan Addendum for the Lyman Street Area (PDF) (3 pp, 66K)
- Conceptual Removal Design / Removal Action Work Plan Addendum for Lyman Street Area, Blasland, Bouck, & Lee, Inc., May 2005 (PDF) (245 pp, 10.6MB)
- Letter from Lovely (USEPA) to Silfer (GE), February 10, 2005, Approval of GE's Lyman Street Area, Supplement to Conceptual Removal Design/Removal Action Area Work Plan (PDF) (3 pp, 70K)
- Letter Report from Silfer (GE) to Lovely (USEPA), January 28, 2005, Lyman Street Area Supplement to Conceptual Removal Design/Removal Action Work Plan (PDF) (6 pp, 2MB)
- EPA's January 10, 2005 conditional approval of the Conceptual Removal Design/ Removal Action Work Plan for the Lyman Street Area (PDF) (3 pp, 150K)
- Conceptual
Removal Design/Removal Action Work Plan for Lyman Street
Area, Blasland,
Bouck & Lee, Inc. March 2004. Volumes I - V (PDF) (1 pg, 13KB)
Volumes I - V are internally linked from the table of contents. Combined file size is 25 mb - estimated download time for all files: 59 minutes @ 56 kbs. - Letter from Nalipinski (USEPA) to Silfer (GE), November 24, 2003, Comments on GE's October 31, 2003 submittal - Lyman Street Area Additional Supplemental Pre-Design Investigation Report (PDF) (1 pg, 74K)
- Letter Report from Silfer (GE) to Olson (USEPA), October 31, 2003, Lyman Street Area Additional Supplemental Pre-Design Investigation Report (PDF) (34 pp, 5.8MB)
- Letter from Nalipinski (USEPA) to Silfer (GE), September 9, 2003, Comments on GE's August 18, 2003 submittal re: Lyman Street Area Supplemental Pre-Design Soil Investigations, and Comments on GE's September 5, 2003 submittal Additional Supplemental Pre-Design Soil Investigations (PDF) (1 pg, 76K)
- Letter from Silfer (GE) to Olson (USEPA), September 5, 2003, Lyman Street Area Additional Supplemental Pre-Design Soil Investigations (PDF) (4 pp, 1.3MB)
- Letter Report from Silfer (GE) to Olson (USEPA), August 18, 2003, Lyman Street Area Supplemental Pre-Design Soil Investigations. (PDF) (59 pp, 485K)
- Letter from Nalipinski (USEPA) to Silfer (GE), June 20, 2003, Comments on GE's April 2003 submittal Pre-Design Investigation Report for the Lyman Street Removal Action (PDF) (2 pp, 155K)
- Pre-Design Investigation Report for the Lyman Street Area Removal Action (Vol 1), Blasland, Bouck & Lee, Inc. (Prepared for GE), April 2003. (PDF) (182 pp, 19.8MB)
- Pre-Design Investigation
Report for the Lyman Street Area Removal Action (Vol 2), Blasland,
Bouck & Lee, Inc. (Prepared for
GE), April 2003.
- Part 1 (PDF) (269 pp, 11.5MB)
- Part 2 (PDF) (138 pp, 18.7MB)
- Pre-Design Investigation Report for the Lyman Street Area Removal Action (Vol 3), Blasland, Bouck & Lee, Inc. (Prepared for GE), April 2003. (PDF) (192 pp, 21.3MB)
- Letter from Gates (GE) to Nalipinski (USEPA), March 13, 2003, Lyman Street Area Supplemental Pre-Design PCB Soil Sampling (PDF) (2 pp, 250K)
- Letter from Olson (USEPA) to Silfer (GE), July 25, 2002, Comments on GE's July 16, 2002 Lyman Street Area Pre-Design Investigation Work Plan Supplemental Information Letter. (PDF) (3 pp, 158K)
- Letter Report from Silfer (GE) to Olson (USEPA), July 16, 2002, Lyman Street Area Pre-Design Investigation Work Plan Supplemental Information Letter (PDF) (48 pp, 13.4MB)
- Letter from Nalipinski (USEPA) to Silfer (GE), July 2, 2002, Comments on GE's March 2002 Pre-Design Investigation Work Plan for the Lyman Street Area Removal Action (PDF) (5 pp, 307K)
- Pre-Design Investigation Work Plan for the Lyman Street Area
Removal Action, Blasland, Bouck & Lee Inc. (Prepared for
GE), March 2002.
- Part 1 (PDF) (125 pp, 19.6MB)
- Part 2 (PDF) (73 pp, 9.9MB)
- Addendum to MCP Supplemental Phase II/RCRA Facility Investigation Proposal for Lyman Street/USEPA Area 5A Site, Volume I, Blasland, Bouck & Lee, Inc. (Prepared for GE), October 1997. Includes covers/TOCs for Volumes 2 through 5 (PDF) (123 pp, 6.1MB)
- MCP Supplemental Phase II/RCRA Facility Investigation Report for Lyman Street/USEPA Area 5A Site, Blasland, Bouck & Lee, Inc. (Prepared for GE), June 1996. (PDF) (370 pp, 19.9MB)
- MCP Phase I Report for Lyman Street Parking Lot (Oxbow Area D) and Current Assessment Summary for USEPA Area 5a, Blasland, Bouck & Lee, Inc. February 1994. Volumes I - IV. (PDF) (145 pp, 7.8MB)
Former Filled Oxbows A and C
- Letter (with attachments) from Gates (GE) to Fisher (USEPA) and Gorski (MDEP), January 3, 2013, Re: Former Oxbow Areas A and C Summary of 2012 Conditional Solution Inspection Activities (PDF) (11 pp, 207K)
- Letter (with enclosure) from Gates (GE) to Ms. Scago and Messrs. Scago (Sugar Bears Enterprised, LLC), December 27, 2012, Re: Property at 119 Elm Street, Pittsfield - Tax Parcel Number I8-23-10 (PDF) (4 pp, 263K)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA), October 4, 2012, Re: Former Oxbow Areas A and C, Summary of September 2012 Inspection Activities (PDF) (10 pp, 2.4MB)
- Letter (with enclosures) from Carroll (GE) to Emino S. Barbalunga, Jr. , July 18, 2012, Re: Properties on Elm Street, Mystic Street, and Day Street in Pittsfield, MA: Tax Parcel Nos. I8-24-6, I8-23-7, I9-5-1, and I9-5-2 (PDF) (2 pp, 34K)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA) and Gorski (MDEP), December 16, 2011, Re: Former Oxbow Areas A and C Summary of 2011 Conditional Solution Inspection Activities (PDF) (10 pp, 182K)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA), October 14, 2011, Re: Former Oxbow Areas A and C Summary of September 2011 Inspection Activities (PDF) (15 pp, 1.2MB)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA), June 16, 2011, Re: Former Oxbow Areas A and C Summary of May 2011 Vegetation Inspection Activities (PDF) (10 pp, 1.1MB)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA) and Gorski (MADEP), December 14, 2010, Re: Former Oxbow Areas A and C Summary of 2010 Conditional Solution Inspection Activities (PDF) (10 pp, 151K)
- Letter (with attachment) from Gates (GE) to Fisher (USEPA), October 7, 2010, Re: Former Oxbow Areas A and C Summary of September 2010 Inspection Activities (PDF) (18 pp, 975K)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA), June 3, 2010, Re: Former Oxbow Areas A and C Summary of May 2010 Vegetation Inspection Activities (PDF) (14 pp, 1.9MB)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA) and Gorski (MADEP), December 16, 2009, Re: Former Oxbow Areas A and C Summary of 2009 Conditional Solution Inspection Activities (PDF) (10 pp, 343K)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA), September 24, 2009, Re: Former Oxbow Areas A and C Summary of August 2009 Inspection Activities (PDF) (19 pp, 1.2MB)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA), June 11, 2009, Re: Former Oxbow Areas A and C Summary of May 2009 Vegetation Inspection Activities (PDF) (17 pp, 2.7MB)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA) and Steenstrup (MADEP), December 18, 2008, Re: Former Oxbow Areas A and C Summary of 2008 Conditional Solution Inspection Activities (PDF) (10 pp, 280K)
- Letter (with attachments) from Gates (GE) to Hull (USEPA), October 16, 2008, Re: Former Oxbow Areas A and C Summary of September 2008 Inspection Activities (PDF) (20 pp, 752K)
- Pollution Report (POLREP) # 2 and Final - Former Oxbow Areas A and C Removal Action Area (RAA), July 18, 2008 (PDF) (5 pp, 218K)
- Letter (with attachments) from Gates (GE) to Hull (USEPA), June 27, 2008, Re: Former Oxbow Areas A and C Summary of May 2008 Vegetation Inspection Activities (PDF) (20 pp, 775K)
- Letter from Fisher (USEPA) to Gates (GE), June 3, 2008, Re: EPA Approval of, and Certificate of Completion for, General Electric's submittal entitled Final Completion Report for Former Oxbow Areas A and C Removal Action, dated May, 2008 (PDF) (3 pp, 89K)
- Letter from Steenstrup (MDEP) to Tagliaferro (USEPA), May 21, 2008, Re: Former Oxbow Areas A and C Approval of Final Completion Report for Former Oxbow Areas A and C Removal Action (PDF) (1 pg, 235K)
- Letter from Gates (GE) to Fisher (USEPA), May 12, 2008, Re: Former Oxbow Areas A and C Final Completion Report for Former Oxbow Areas A and C Removal Action, Appendix C of Final Completion Report - Signed and Stamped (PDF) (5 pp, 4.7MB)
- Letter (with report) from Gates (GE) to Fisher (USEPA), May 12, 2008, Re: Former Oxbow Areas A and C Final Completion Report for Former Oxbow Areas A and C Removal Action (PDF) (874 pp, 34.8MB)
- Letter from Gates (GE) to Fisher (USEPA) and Steenstrup (MADEP), December 21, 2007, Re: Former Oxbow Areas A and C Summary of 2007 Conditional Solution Inspection Activities (PDF) (11 pp, 767K)
- Letter (with report) from Gates (GE) to Fisher (USEPA), November 21, 2007, Re: Former Oxbow Areas A and C Summary of October 2007 Inspection Activities (PDF) (10 pp, 389K)
- Letter from Gates (GE) to Tagliaferro (USEPA), July 11, 2007, Re: Former Oxbow Areas A and C, Summary of May 2007 Inspection Activities (PDF) (11 pp, 783K)
- Letter from Gates (GE) to Tagliaferro (USEPA), January 3, 2007, Former Oxbow Areas A and C Summary of November 2006 Inspection Activities (PDF) (10 pp, 462K)
- Letter from Tagliaferro (USEPA) to Silfer (GE), October 18, 2006, Re: Approval of General Electric's October 5, 2006 submittal titled Former Oxbow A & C, Former Oxbow J & K, and Lyman Street Area - Properties West of Lyman Street; Addendum to Supplemental Information Package (PDF) (2 pp, 90K)
- Letter from Gates (GE) to Tagliaferro (USEPA), October 5, 2006, Former Oxbow Areas A and C, Former Oxbow Areas J and K, Lyman Street Area - Properties West of Lyman Street Addendum to Supplemental Information Package (PDF) (32 pp, 1.6MB)
- Letter from Lovely (USEPA) to Silfer (GE), July 7, 2006, Conditional Approval of GE's June 15, 2006 Former Oxbow A & C, Former Oxbow J & K, and Lyman Street Area-Properties West of Lyman Street, Supplemental Information Package (PDF) (2 pp, 133K)
- Letter from Lovely (USEPA) to Silfer (GE), June 23, 2006, EPA's Approval of Revision to Second Addendum to Final Removal Design/Removal Action Work Plan for Former Oxbow Areas A & C (PDF) (2 pp, 51K)
- Letter and attachments from Gates (GE) to Lovely (USEPA), June 15, 2006, Supplemental Information Package Former Oxbow Areas A and C, Former Oxbow Areas J and K, and Lyman Street Area - Properties West of Lyman Street (PDF) (478 pp, 16.4MB)
- Letter from Gates (GE) to Lovely (USEPA), June 13, 2006, Revision to Second Addendum to Final Removal Design/Removal Action Work Plan for Former Oxbow Areas A and C (PDF) (3 pp, 1.3MB)
- Letter from Lovely (USEPA) to Silfer (GE), May 31, 2006, Conditional Approval of GE's submittal titled Second Addendum to Final Removal Design/Removal Action Work Plan for Former Oxbow Areas A & C (PDF) (2 pp, 68K)
- Second Addendum to Final Removal Design/Removal Action Work Plan for Former Oxbow Areas A and C, Blasland, Bouck & Lee, Inc., April 2006 (PDF) (193 pp, 10.3MB)
- Letter from Lovely (USEPA) to Silfer (GE), February 17, 2006, Approval of GE's Addendum to Final Removal Design/Removal Action Work Plan for Former Oxbow Areas A and C (PDF) (2 pp, 68K)
- Letter from Lovely (GE) to Silfer (USEPA), January 17, 2006, Re: Conditional Approval of General Electric's submittal titled "Former Oxbows A & C Supplemental Sampling Plan" (PDF) (2 pp, 108K)
- Letter from Gates (GE) to Lovely (USEPA), November 2, 2005, Former Oxbow Areas A and C Supplemental Sampling Plan (PDF) (5 pp, 3.5MB)
- Letter from Silfer (GE) to Lovely (USEPA), September 26, 2005, Addendum to Final Removal Design/Removal Action Work Plan for Former Oxbow Areas A and C (PDF) (3 pp, 209K)
- Letter from Lovely (USEPA) to Silfer (GE), August 30, 2005, Conditional Approval of GE's Final Removal Design/Removal Action Work Plan for Former Oxbow Areas A & C (PDF) (2 pp, 100K)
- Final Removal Design/Removal Action Work Plan for Former Oxbow Areas A and C, Blasland, Bouck, & Lee, Inc., July 2005 (PDF) (94 pp, 6.9MB)
- Memorandum from Gates (GE) to Lovely (USEPA), May 19, 2005, Re: Former Oxbow Areas A and C - Parcel I8-23-6 (Recreational Portion) RD/RA Evaluations Assuming Absence of Existing Loam Pile (PDF) (155 pp, 14.1MB)
- Conditional Approval of the Conceptual Removal Design/ Removal Action Work Plan for Former Oxbows A & C, April 6, 2005 (PDF) (2 pp, 102K)
- Letter from Lovely (USEPA) to Silfer (GE), April 6, 2005, Conditional Approval of General Electric's Conceptual Removal Design/Removal Action Work Plan for Former Oxbows A & C (PDF) (2 pp, 102K)
- Memorandum from Steenstrup (MDEP) to Lovely (USEPA), March 1, 2005, Comments on Conceptual Removal Design/Removal Action Work Plan for Former Oxbow Areas A and C (PDF) (4 pp, 224K)
- Conceptual Removal Design/Removal Action Work Plan for Former Oxbow Areas A and C, January 2005 (PDF) (971 pp, 22MB)
- Letter from Lovely (USEPA) to Silfer (GE), November 30, 2004, Approval of GE's Former Oxbows A & C Additional Supplemental Pre-Design Investigation Report (PDF) (2 pp, 76K)
- Letter from Silfer (GE) to Lovely (USEPA), October 29, 2004, Additional Supplemental PDI Report for Former Oxbow Areas A and C (PDF) (61 pp, 6.8MB)
- Letter from Lovely (USEPA) to Silfer (GE), July 1, 2004, Comments on GE's May 2004 Former Oxbows A & C Supplemental Pre-Design Investigation Report and Additional Sampling Proposal (PDF) (3 pp, 179K)
- Letter from Silfer (GE) to Nalipinski (USEPA), May 19, 2004, Supplemental PDI Report and Additional Sampling Proposal for Former Oxbow Areas A and C (PDF) (106 pp, 6.1MB)
- Letter from Gates (GE) to Nalipinski (USEPA), April 6, 2004, Supplemental Pre-Design Investigation Report and EREs (PDF) (1 pg, 108K)
- Letter from Nalipinski (USEPA) to Silfer (GE), December 1, 2003, Comments on GE's November 18, 2003 Submittal Former Oxbow Areas A and C Proposal for Additional Supplemental Pre-Design Soil Sampling (PDF) (1 pg, 74K)
- Letter from Silfer (GE) to Olson (USEPA), November 18, 2003, Proposal for Additional Supplemental Pre-Design Soil Sampling for Former Oxbow Areas A and C (PDF) (3 pp, 2.7MB)
- Letter from Nalipinski (USEPA) to Silfer (GE), October 20, 2003, Comments on GE's August 2003 Pre-Design Investigation Report for the Former Oxbows A and C Removal Action (PDF) (3 pp, 181K)
- Pre-Design Investigation Report for Former Oxbow Areas A and C Removal Action, Volumes 1 through 3, Blasland Bouck & Lee Inc. (Prepared for GE), August 2003
- Volume I - Report (PDF) (219 pp, 8.6MB)
- Volume II - Appendices A-B (PDF) (295 pp, 16.4MB)
- Volume III - Appendices B-C (PDF) (163 pp, 14.2MB)
- Letter from Nalipinski (USEPA) to Silfer (GE), March 10, 2003, Comments on GE's February 2003 Addendum to Pre-Design Investigation Work Plan for the Former Oxbows A and C Removal Action (PDF) (2 pp, 92K)
- Letter from Silfer (GE) to Olson (USEPA), February 13, 2003, Addendum to Pre-Design Investigation Work Plan for Former Oxbow Areas A and C (PDF) (49 pp, 10.9MB)
- Letter from Nalipinski (USEPA) to Silfer (GE), December 11, 2002, Comments on GE's May 2002 Pre-Design Investigation Work Plan for Former Oxbows A & C Removal Action (PDF) (4 pp, 313K)
- Pre-Design Investigation Work Plan for Former Oxbow Areas A and C Removal Action, Blasland Bouck & Lee Inc. (Prepared for GE), September 2002 (PDF) (263 pp, 17.2MB)
- Immediate Response Completion Report Oxbow Area C, Blasland, Bouck, & Lee, Inc. December 1997. (PDF) (12 pp, 150K)
- MCP Phase I and Interim Phase II Report for Former Housatonic River Oxbow Areas A, B, C, J, and K, Volume 1, Blasland Bouck & Lee Inc. (Prepared for GE), February 1996 (PDF) (214 pp, 14.2MB)
- MCP Phase I and Interim Phase II Report for Former Housatonic River Oxbow Areas A, B, C, J, and K, Volume 2, Blasland Bouck & Lee Inc. (Prepared for GE), February 1996 (PDF) (570 pp, 19.3MB)
Newell Street Area I
- Letter (with attachments) from Gates (GE) to Fisher (USEPA) and Gorski (MDEP), January 3, 2013, Re: Newell Street Area I Summary of 2012 Conditional Solution Inspection Activities (PDF) (19 pp, 1.7MB)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA) and Gorski (MDEP), December 26, 2012, Re: Newell Street Area I Summary of Annual ERE Inspection for Parcels J9-23-24 and J9-23-26 (PDF) (8 pp, 1.3MB)
- Letter (with attachment) from Gates (GE) to Fisher (USEPA), October 5, 2012, Re: Newell Street Area I, Summary of September 2012 Inspection Activities (PDF) (24 pp, 4.7MB)
- Letter (with enclosures) from Gates (GE) to Gaylord (Manager 269 Newell St), August 27, 2012, Re: Deed Restriction on Your Property at 269 Newell Street, Pittsfield, MA; Tax Parcel No. J9-23-24 (PDF) (3 pp, 177K)
- Letter (with attachment) from Gates (GE) to Fisher (USEPA), June 13, 2012, Re: Newell Street Area I Summary of May 2012 Engineered Barrier Inspection Activities (PDF) (20 pp, 2MB)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA) and Gorski (MDEP), December 13, 2011, Re: Newell Street Area I Summary of Annual ERE Inspection for Parcels J9-23-24 and J9-23-26 (PDF) (7 pp, 205K)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA) and Gorski (MDEP), December 13, 2011, Re: Newell Street Area I Summary of 2011 Conditional Solution Inspection Activities (PDF) (14 pp, 191K)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA), October 14, 2011, Re: Newell Street Area I Summary of September 2011 Post-Storm Inspection Activities (PDF) (24 pp, 2MB)
- Letter (with attachment) from Gates (GE) to Fisher (USEPA), September 14, 2011, Re: Newell Street Area I Summary of August 2011 Inspection Activities (PDF) (25 pp, 2.3MB)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA), June 16, 2011, Re: Newll Street Area I, Summary of May 2011 Engineered Barrier Inspection Activities (PDF) (20 pp, 2.5MB)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA) and Gorski (MADEP), December 14, 2010, Re: Newell Street Area I Summary of 2010 Conditional Solution Inspection Activities (PDF) (15 pp, 304K)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA) and Gorski (MADEP), December 14, 2010, Re: Newell Street Area I Summary of Annual ERE Inspection for Parcels J9-23-24 and J9-23-26 (PDF) (6 pp, 1.1MB)
- Letter (with attachment) from Gates (GE) to Fisher (USEPA), October 19, 2010, Re: Newell Street Area I, Summary of September 2010 Inspection Activities (PDF) (25 pp, 1.7MB)
- Letter (with attachment) from Gates (GE) to Fisher (USEPA), June 2, 2010, Re: Newell Street Area I Summary of May 2010 Engineered Barrier Inspection Activities (PDF) (21 pp, 2.1MB)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA) and Gorski (MADEP), December 17, 2009, Re: Newell Street Area I Summary of 2009 Conditional Solution Inspection Activities (PDF) (14 pp, 317K)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA) and Gorski (MADEP), December 15, 2009, Re: Newell Street Area I Summary of Annual ERE Inspection for Parcels J9-23-24 and J9-23-26 (PDF) (6 pp, 104K)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA), September 24, 2009, Re: Newell Street Area I Summary of August 2009 Inspection Activities (PDF) (24 pp, 342K)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA), June 11, 2009, Re: Newell Street Area I Summary of May 2009 Engineered Barrier Inspection Activities (PDF) (24 pp, 329K)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA) and Steenstrup (MADEP), December 18, 2008, Re: Newell Street Area I Summary of 2008 Conditional Solution Inspection Activities (PDF) (14 pp, 289K)
- Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA) and Steenstrup (MADEP), December 18, 2008, Re: Newell Street Area I Summary of Annual ERE Inspection for Parcels J9-23-24 and J9-23-26 (PDF) (6 pp, 105K)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA), September 24, 2008, Re: Newell Street Area I Summary of August 2008 Inspection Activities (PDF) (24 pp, 348K)
- Pollution Report (POLREP) # 2 and Final - Newell Street Area 1 Removal Action Area (RAA), August 27, 2008 (PDF) (5 pp, 261K)
- Letter (with enclosure) from Fisher (USEPA) to Gates (GE), August 27, 2008, Re: EPA Approval of, and Certificate of Completion for, General Electric's submittal entitled Final Completion Report for the Newell Street Area I Removal Action, dated July 2008 (3 pp, 127K)
- Letter from Steenstrup (MADEP) to Tagliaferro (USEPA), August 21, 2008, Re: Newell Street Area I Approval of Final Completion Report for the Newell Street Area I Removal Action (PDF) (1 pg, 227K)
- Letter (with report) from Gates (GE) to Tagliaferro (USEPA), July 31, 2008, Re: Newell Street Area I Final Completion Report for the Newell Street Area I Removal Action (PDF) (1,930 pp, 129.8MB)
- Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), June 13, 2008, Re: Newell Street Area I Summary of Annual ERE Inspection for Parcel J9-23-24 (PDF) (4 pp, 79K)
- Letter (w/report) from Gates (GE) to Fisher (USEPA), June 12, 2008, Re: Newell Street Area I Summary of May 2008 Inspection Activities (PDF) (24 pp, 361K)
- Letter from Gates (GE) to Fisher (USEPA) and Steenstrup (MADEP), December 21, 2007, Re: Newell Street Area I Summary of 2007 Conditional Solution Inspection Activities (PDF) (14 pp, 153K)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA), December 5, 2007, Re: Newell Street Area I; Summary of October/November 2007 Inspection Activities (PDF) (22 pp, 5.8MB)
- Letter from Gates (GE) to Tagliaferro (USEPA), July 11, 2007, Re: Newell Street Area I Summary of May 2007 Inspection Activities (PDF) (15 pp, 939K)
- Letter, with attached report, from Gates (GE) to Tagliaferro (USEPA), June 29, 2007, Re: Newell Street Area I, Summary of Annual ERE Inspection for Parcel J9-23-24 (PDF) (4 pp, 80K)
- Letter from Gates (GE) to Tagliaferro (USEPA), January 4, 2007, Newell Street Area I Summary of 2006 Conditional Solution Inspection Activities (PDF) (14 pp, 161K)
- Letter from Gates (GE) to Tagliaferro (USEPA), January 3, 2007, Newell Street Area I Summary of November 2006 Inspection Activities (PDF) (15 pp, 427K)
- Letter from Gates (GE) to Lovely (USEPA), July 6, 2006, Summary of May 2006 Inspection Activities (PDF) (15 pp, 295K)
- Letter from Gates (GE) to Lovely (USEPA), February 10, 2006, Newell Street Area I Summary of December 2005 Inspection Activities, SDMS 244882 (PDF) (15 pp, 743K)
- Letter from Gates (GE) to Tagliaferro (USEPA) and Steenstrup (MDEP), October 25, 2005, Ambient Air Monitoring Data (PDF) (26 pp, 1.3MB)
- Letter from Gates (GE) to Tagliaferro (USEPA), June 22, 2004, Newell Street Area I Restoration of Parcel J9-23-22. (PDF) (8 pp, 2MB)
- Letter from Gates (GE) to Nalipinski (USEPA), May 28, 2004, Newell Street Area I Second Revision to Post-Remediation PCB Evaluations for Parcel J9-23-22. (PDF) (24 pp, 1.1MB)
- Letter from Gates (GE) to Nalipinski (USEPA), May 25, 2004, Newell Street Area I Revised Post-Remediation PCB Evaluations for Parcel J9-23-22. (PDF) (18 pp, 1.2MB)
- Letter from Olson (USEPA) to Silfer (GE), October 9, 2003, Approval of GE's Removal Design/Removal Action Work Plan for Newell Street Area I. (PDF) (1 pg, 69K)
- Newell Street Area I Final Removal Design/Removal Action Work Plan - Supplemental Information Package, Blasland, Bouck & Lee, Inc. (Prepared for GE), September 2003 (PDF) (379 pp, 14.3MB)
- Letter from Olson (USEPA) to Silfer (GE), September 15, 2003, Conditional Approval of GE's August 4, 2003 Removal Design/Removal Action Work Plan for Newell Street I. (PDF) (2 pp, 135K)
- Newell Street Area 1 Final Removal Design/Removal Action Work Plan, Blasland, Bouck & Lee, Inc. (Prepared for GE), August 2003 (PDF) (179 pp, 13.9MB)
- Letter from Olson (USEPA) to Silfer (GE), May 13, 2003, Approval of GE's April 17, 2003 Conceptual RD/RA Work Plan Addendum for the Newell Street 1 Area. (PDF) (1 pg, 52K)
- Conceptual RD/RA Work Plan Addendum for Newell Street Area I, Blasland, Bouck & Lee, Inc. (Prepared for GE), April 2003.
- Volume 1 (PDF) (97 pp, 6.7MB)
- Volume 2 (PDF) (219 pp, 18.1MB)
- Volume 3 (PDF) (261 pp, 19.6MB)
- Volume 4 (PDF) (283 pp, 18.5MB)
- Volume 5 (PDF) (113 pp, 3.7MB)
- Letter from Olson (USEPA) to Silfer (GE), August 26, 2002, Conditional Approval of GE's August 20, 2002 Newell Street Area I Revised Proposal for Supplemental Pre-Design Soil Investigations. (PDF) (1 pg, 89K)
- Letter from Gates (GE) to Olson (USEPA), August 20, 2002, Newell Street Area I Revised Proposal for Supplemental Pre-Design Investigations. (PDF) (29 pp, 2.2MB)
- Letter from Olson (USEPA) to Silfer (GE), August 5, 2002, Conditional Approval of GE's July 2002 Newell Street Area I Proposal for Supplemental Pre-Design Soil Investigations. (PDF) (3 pp, 203K)
- Letter (with BBL figures) from Gates (GE) to Olson (USEPA), July 3, 2002, Newell Street Area I Proposal for Supplemental Pre-Design Soil Investigation. (PDF) (18 pp, 2.9MB)
- Letter from Olson (USEPA) to Silfer (GE), May 24, 2002, Comments on GE's December 2001 Conceptual Removal Design/Removal Action Work Plan for Newell Street Area I. (PDF) (6 pp, 571K)
- Conceptual Removal Design/Removal Action Work Plan for Newell Street Area I - Vol I, Blasland, Bouck & Lee, Inc. (Prepared for GE), January 2002. (PDF) (117 pp, 4.4MB)
- Conceptual Removal Design/Removal Action Work Plan for Newell Street Area I - Vol II, Blasland, Bouck & Lee, Inc. (Prepared for GE), January 2002. (PDF) (272 pp, 9.5MB)
- Conceptual Removal Design/Removal Action Work Plan for Newell Street Area I - Vol III, Blasland, Bouck & Lee, Inc. (Prepared for GE), January 2002. (PDF) (9 pp, 11MB)
- Letter from Silfer (GE) to Olson (USEPA), August 1, 2001, Newell Street Area I, Parcel J9-23-26 (Lakewood Playground) - Report on Additional Soil Sampling Results. (PDF) (4 pp, 285K)
- Letter from Gates (GE) to Olson (USEPA), June 29, 2001, Newell Street Area I, Supplement to Pre-Design Investigation Report. (PDF) (4 pp, 1.6MB)
- Letter from Olson (USEPA) to Silfer (GE), June 28, 2001, Newell Street Area I Supplemental Pre-Design Investigation Results and Proposal for Additional Soil Sampling at Parcel J9-23-26 (Lakewood Playground) (PDF) (2 pp, 92K)
- Letter from Silfer (GE) to Olson (USEPA), June 19, 2001, Newell Street Area I Supplemental Pre-Design Investigation Results and Proposal for Additional Soil Sampling at Parcel J9-23-26 (Lakewood Playground). (PDF) (7 pp, 3.8MB)
- Letter from Olson (USEPA) to Silfer (GE), April 12, 2001, Newell Street Area I - Supplemental Pre-Design Investigation Proposal for Parcel J9-23-26 (Hibbard Playground). (PDF) (1 pg, 47K)
- Letter from Silfer (GE) to Olson (USEPA), April 9, 2001, Newell Street Area I Supplemental Pre-Design Investigation Proposal for Parcel J9-23-26 (Hibbard Playground) (PDF) (11 pp, 2.4MB)
- Letter from Olson (USEPA) to Silfer (GE), January 11, 2001, Conditional Approval of GE's December 1, 2000 Submittal "Addendum to Pre-Design Investigation Work Plan for the Newell Street Area I Removal Action". (PDF) (2 pp, 82K)
- Addendum to Pre-Design Investigation Work Plan for the Newell Street Area I Removal Action, Blasland, Bouck & Lee, Inc. (Prepared for GE), December 2000. (PDF) (8 pp, 526K)
- Letter from Olson (USEPA) to Silfer (GE), November 16, 2000, Conditional Approval of GE's March 6, 2000 Submittal "Pre-Design Investigation Work Plan for the Newell Street Area I Removal Action" (PDF) (2 pp, 136K)
- Pre-Design Investigation Work Plan for the Newell Street Area I Removal Action, Blasland, Bouck & Lee, Inc. (Prepared for GE), March 2000. (PDF) (76 pp, 1.5MB)
- Ambient Air Monitoring for PCB, July 7, 1996 through September 27, 1996, 191 Newell Street, GE, Pittsfield, MA, Berkshire Environmental Consultants, Inc. (Prepared for GE), September 1997 (PDF) (29 pp, 1.5MB)
- MCP Supplemental Phase II Report for the Newell Street 1 Site, Blasland, Bouck, & Lee, Inc. (Prepared for GE), September 1997. (PDF) (160 pp, 11.9MB)
- Appendix A, B & C (PDF) (168 pp, 11.2MB)
- MCP Interim Phase II Report for the Newell Street Site, Volume 1, Blasland & Bouck Engineers (Prepared for GE), February 1992 (PDF) (156 pp, 9.6MB)
- MCP Interim Phase II Report for the Newell Street Site, Volume 2, Blasland & Bouck Engineers (Prepared for GE), February 1992 (PDF) (217 pp, 7.7MB)
- MCP Interim Phase II Report for the Newell Street Site, Volume 3, Blasland & Bouck Engineers (Prepared for GE), February 1992 (PDF) (32 pp, 9.53MB)
- MCP Interim Phase II Report for the Newell Street Site, Volume 4, Blasland & Bouck Engineers (Prepared for GE), February 1992 (PDF) (236 pp, 13.8MB)
- Short-Term Measures Proposal Newell Street Site, Pittsfield, Massachusetts, Geraghty & Miller (Prepared for GE), December 1990. (PDF) (122 pp, 18.4MB)
- Short Term Measure (STM) Newell Street Marchetto Property, Quality Printing and Response to Superseding Order of Conditions File 263-310, October 1990. (PDF) (35 pp, 4.6MB)
Newell Street Area II
- Letter (with attachments) from Gates (GE) to Tagliaferro and Fisher (USEPA), May 2, 2013, Re: East Street Area 2-South, Building 71 and Hill 78 On-Plant Consolidation Areas, Former Oxbow Areas J and K, and Newell Street Area II Summary of October/Novermber 2012 Tree/Shrub Installation Activities (PDF) (7 pp, 1.6MB)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA) and Gorski (MDEP), December 21, 2012, Re: Newell Street Area II Summary of 2012 Conditional Solution Inspection Activities (PDF) (8 pp, 175K)
- Letter ((with attachments) from Gates (GE) to Fisher (USEPA) and Gorski (MDEP), December 21, 2012, Re: Newell Street Area II Summary of Annual ERE Inspection for the City of Pittsfield Property (PDF) (4 pp, 155K)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA), September 28, 2012, Re: Newell Street Area II, Summary of August 2012 Inspection Activities (PDF) (49 pp, 1.2MB)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA), June 14, 2012, Re: Newell Street Area II Summary of May 2012 Inspection Activities (PDF) (48 pp, 1.2MB)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA) and Gorski (MDEP), December 13, 2011, Re: Newell Street Area II Summary of Annual ERE Inspection for the City of Pittsfield Property (PDF) (4 pp, 159K)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA) and Gorski (MDEP), December 13, 2011, Re: Newell Street Area II Summary of 2011 Conditional Solution Inspection Activities (PDF) (8 pp, 179K)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA), October 14, 2011, Re: Newell Street Area II Summary of September 2011 Post-Storm Inspection Activities (PDF) (27 pp, 644K)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA), September 16, 2011, Re: Newell Street Area II Summary of August 2011 Inspection Activities (PDF) (66 pp, 1.4MB)
- Letter (with attachments) from Gates (GE) to Pelto (MADEP), August 12, 2011, Re: Newell Street Area II Summary of July 2011 Inspection of Natural Resource Restoration/Enhancement Measures (PDF) (11 pp, 1.9MB)
- Letter (with attachments) from Gates (GE) to Pelto (MDEP), June 22, 2011, Re: Newell Street Area II Summary of May 2011 Inspection of Natural Resource Restoration/Enhancement Measures (PDF) (9 pp, 1.3MB)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA), June 17, 2011, Re: Newell Street Area II Summary of May 2011 Inspection Activities (PDF) (63 pp, 1MB)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA) and Gorski (MADEP), December 14, 2010, Re: Newell Street Area II Summary of 2010 Conditional Solution Inspection Activities (PDF) (8 pp, 1MB)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA) and Gorski (MADEP), December 14, 2010, Re: Newell Street Area II Summary of Annual ERE Inspection for the City of Pittsfield Property (PDF) (4 pp, 875K)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA), December 2, 2010, Re: Newell Street Area II Removal Action Area Completion of Engineered Barrier Repair Activities (PDF) (8 pp, 998K)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA), October 4, 2010, Re: Newell Street Area II Summary of September 2010 Inspection Activities (PDF) (83 pp, 1MB)
- Letter (with attachments) from Gates (GE) to Pelto (MDEP), September 23, 2010, Re: Newell Street Area II Summary of August 2010 Inspection of Natural Resource Restoration/Enhancement Measures (PDF) (10 pp, 1.3MB)
- Letter from Gates (GE) to Gorski (MDEP) and Fisher (USEPA), September 3, 2010, Re: Newell Street Area II Removal Action Area Damage to Engineered Barrier - CORRECTION (PDF) (2 pp, 165K)
- Letter (with attachments) from Gates (GE) to Gorski MADEP and Fisher (USEPA), July 23, 2010, Re: Newell Street Area II Removal Action Area Damage to Engineered Barrier (PDF) (6 pp, 527K)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA), June 9, 2010, Re: Newell Street Area II Summary of May 2010 Inspection Activities (PDF) (82 pp, 1.5MB)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA) and Gorski (MADEP), December 17, 2009, Re: Newell Street Area II Summary of 2009 Conditional Solution Inspection Activities (PDF) (8 pp, 307K)
- Letter (wih enclosure) from Gates (GE) to Tagliaferro (USEPA), December 16, 2009, Re: Newell Street Area II, Addendum to Final Completion Report for the Newell Street Area II Removal Action (PDF) (1,012 pp, 67.4MB)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA) and Gorski (MADEP), December 15, 2009, Re: Newell Street Area II Summary of Annual ERE Inspection for the City of Pittsfield Property (PDF) (4 pp, 95K)
- Final POLREP for the Newell II Removal Action Area (RAA), at the GE-Housatonic Site, from Fisher (USEPA), December 3, 2009 (PDF) (6 pp, 108K)
- Letter (with enclosure) from Fisher (USEPA) to Gates (GE), November 23, 2009, Re: EPA Approval of, and Certificate of Completion for, General Electric's submittal entitled Final Completion Report for the Newell Street Area II Removal Action, dated October 2009 (PDF) (3 pp, 375K)
- Letter from Tor (MDEP) to Tagliaferro (USEPA), November 18, 2009, Re: Approval of Final Completion Report for the Newell Street Area II Removal Action (PDF) (1 pg, 69K)
- Letter (with enclosure) from Gates (GE) to Tagliaferro (USEPA), October 23, 2009, Re: Newell Street Area II Final Completion Report for the Newell Street Area II Removal Action (PDF) (2,365 pp, 157.9MB)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA), September 24, 2009, Re: Newell Street Area II Summary of August 2009 Inspection Activities (PDF) (72 pp, 1.7MB)
- Letter (with attachments) from Gates (GE) to Young (MEOEEA), August 26, 2009, Re: Newell Street Area II Summary of July 2009 Inspection of Natural Resource Restoration/Enhancement Measures (PDF) (13 pp, 1.8MB)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA), August 7, 2009, Re: Newell Street Area II Summary of July 2009 Inspection Activities at the Vermont/Ontario Street Area (PDF) (5 pp, 335K)
- Letter (with attachments) from Gates (GE) to Young (MEOEEA), July 1, 2009, Re: Newell Street Area II Summary of June 2009 Inspection of Natural Resource Restoration/Enhancement Measures (PDF) (12 pp, 1MB)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA), June 11, 2009, Re: Newell Street Area II Summary of May 2009 Inspection Activities (PDF) (65 pp, 937K)
- Letter from Fisher (USEPA) to Gates (GE), June 8, 2009, RE: Conditional Approval of General Electric's June 4, 2009 submittal titled Performance of EPA-Approved Supplemental Remediation Activities for Vermont/Ontario Street Area (PDF) (2 pp, 207K)
- Letter (with attachments) form Gates (GE) to Tagliaferro (USEPA), June 4, 2009, Re: Newell Street Area II Performance of EPA-Approved Supplemental Remediation Activities for Vermont/Ontario Street Area (PDF) (15 pp, 2.1MB)
- Letter from Fisher (USEPA) to Gates (GE), April 28, 2009, Re: Conditional Approval of General Electric's April 14, 2009 submittal titled Newell Street Area II, Third Addendum to Final Removal Design/Removal Action Work Plan (PDF) (2 pp, 25K)
- Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), April 14, 2009, Re: Newel Street Area II Third Addendum to Final Removal Design/Removal Action Work Plan (PDF) (45 pp, 2.6MB)
- Letter from Fisher (USEPA) to Gates (GE), January 20, 2009, Re: Conditional Approval of General Electric's October 16, 2008 submittal titled Newell Street Area II, Second Addendum to Final Removal Design/Removal Action Work Plan (PDF) (6 pp, 2.7MB)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA) and Steenstrup (MADEP), December 18, 2008, Re: Newell Street Area II Summary of 2008 Conditional Solution Inspection Activities (PDF) (8 pp, 283K)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA), October 16, 2008, Re: Newell Street Area II Summary of September 2008 Inspection Activities (PDF) (67 pp, 897K)
- Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), October 16, 2008, Re; Newell Street Area II, Second Addendum to Final Removal Design/Removal Action Work Plan (PDF) (44 pp, 1.7MB)
- Letter from Young (EOEEA) to Gates (GE), September 2, 2008, Re: Certification of Completion of Installation of Restoration Work Newell Street Area II and Lyman Street Area (PDF) (2 pp, 63K)
- Letter (with attachments) from Gates (GE) to Young (MEOEEA), August 27, 2008, Re: Newell Street Area II Summary of July 2008 Inspection of Natural Resource Restoration/Enhancement Measures (PDF) (15 pp, 1.6MB)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA), June 27, 2008, Re: Newell Street Area II Summary of May 2008 Inspection Activities (PDF) (67 pp, 3.2MB)
- Letter from Gates (GE) to Fisher (USEPA) and Steenstrup (MADEP), December 21, 2007, Re: Newell Street Area II Summary of 2007 Conditional Solution Inspection Activities (PDF) (8 pp, 139K)
- Letter (with report) from Gates (GE) to Fisher (USEPA), November 7, 2007, Re: Newell Street Area II Summary of October 2007 Inspection Activities (PDF) (17 pp, 1.3MB)
- Letter from Gates (GE) to Young (MEOEA), October 2, 2007, Re: Newell Street Area II, Summary of September 2007 Inspection of the Natural Resource Restoration/Enhancement Area (PDF) (12 pp, 972K)
- Letter from Gates (GE) to Young (MEOEA), August 3, 2007, Re: Newell Street Area II, Summary of June 2007 Inspection of the Natural Resource Restoration/Enhancement Area (PDF) (14 pp, 1.1MB)
- Letter from Gates (GE) to Tagliaferro (USEPA), July 11, 2007, Re: Newell Street Area II, Summary of May 2007 Inspection Activities (PDF) (17 pp, 1MB)
- Letter from Gates (GE) to Young (MEOEA), June 5, 2007, Re: Newell Street Area II, Completion of Installation of Restoration Work Report (PDF) (12 pp, 2.1MB)
- Letter from Gates (GE) to Tagliaferro (USEPA), January 19, 2007, Newell Street Area II Notification of Extension of Storage Limit (PDF) (4 pp, 286K)
- Letter from Gates (GE) to Tagliaferro (USEPA), January 3, 2007, Newell Street Area II Summary of November 2006 Inspection Activities (PDF) (15 pp, 425K)
- Letter from Lovely (USEPA) to Silfer (GE), May 16, 2006, Re: Approval of General Electric's Newell Street Area II Proposal for Engineered Barrier Modifications (PDF) (2 pp, 49K)
- Letter (with attachments) from Gates (GE) to Lovely (USEPA), May 4, 2006, Re: Newell Street Area II Proposal for Engineered Barrier Modifications (PDF) (44 pp, 5.6MB)
- Letter from Lovely (USEPA) to Silfer (GE), February 7, 2006, Re: Newell Street Area II Proposal for Additional Removal Actions (PDF) (2 pp, 71K)
- Letter (with attachments) from Silfer (GE) to Lovely (USEPA), January 18, 2006, Re: Newell Street Area II Proposal for Additional Removal Activities (PDF) (5 pp, 394K)
- Letter from Silfer (GE) to Lovely (USEPA), December 20, 2005, Newell Street Area II Subsurface Investigation Summary Report (PDF) (41 pp, 3.4MB)
- Letter from Gates (GE) to Lovely (USEPA), November 22, 2005, Newell Street Area II Supplemental Information Package-Analytical Data for Proposed Topsoil Source (PDF) (5 pp, 445K)
- Letter from Lovely (USEPA) to Silfer (GE), November 9, 2005, Re: Newell Street Area II Proposal for Test Trenching Activities (PDF) (11 pp, 2MB)
- Letter from Silfer (GE) to Lovely (USEPA), October 31, 2005, Newell Street Area II Proposal for Test Trenching Activities (PDF) (8 pp, 1.7MB)
- Letter from Gates (GE) to Tagliaferro (USEPA) and Steenstrup (MDEP), October 25, 2005, Ambient Air Monitoring Data (PDF) (26 pp, 1.3MB)
- Letter from Czelusniak (WESTON) to Tagliaferro (USEPA), October 11, 2005, Air Monitoring Plan, GE Oversight-Newell Street Area II RAA (PDF) (36 pp, 1.8MB)
- Letter from Lovely (USEPA) to Silfer (GE), September 14, 2005, Re: Newell Street Area II: Geophysical Survey Proposal and Discussions (PDF) (2 pp, 90K)
- Letter (with attachments) from Silfer (GE) to Lovely (USEPA), September 6, 2005, Re: Newell Street Area II Proposal for Geophysical Survey at Parcel J9-23-8 (PDF) (8 pp, 375K)
- Letter from Lovely (USEPA) to Silfer (GE), July 12, 2005, Conditional Approval of Supplemental Information Package for Newell Street Area II (PDF) (2 pp, 85K)
- Letter from Silfer (GE) to Lovely (USEPA), June 24, 2005, Newell Street Area II Supplemental Information Package. (PDF) (71 pp, 4.6MB)
- Letter from Lovely (USEPA) to Silfer (GE), June 9, 2005, EPA's Approval in Part of GE's submittal Final RD/RA Work Plan Addendum for Newell Street II (PDF) (2 pp, 95K)
- Letter from Silfer (GE) to Lovely (USEPA), May 25, 2005, Final Removal Design/Removal Action Work Plan Addendum for Newell Street Area II (PDF) (14 pp, 1.1MB)
- Letter from Lovely (USEPA) to Silfer (GE), May 12, 2005, Re: Conditional Approval of General Electric's submittal titled "Final Removal Design/Removal Action Work Plan for Newell Street II (PDF) (2 pp, 121K)
- Letter (with Enclosure) from Silfer (GE) to Lovely (USEPA), March 3, 2005, Re: Newell Street Area II Final Removal Design/Removal Action Work Plan (PDF) (154 pp, 7.8MB)
- Letter from Lovely (USEPA) to Silfer (GE), November 4, 2004, Re: Conditional Approval of General Electric's submittal titled "Conceptual Removal Design/ Removal Action Work Plan for Newell Street Area II (PDF) (3 pp, 139K)
- Conceptual Removal
Design/Removal Action Work Plan for Newell Street Area II,
Table of Contents, July 2004 (PDF) (1 pg, 11K)
Volumes I - V are internally linked from the table of contents. Combined file size is 19 mb - estimated download time: 45 minutes @ 56 kbs. - Letter from Nalipinski (USEPA) to Silfer (GE), March 16, 2004, Approval of GE's March 2, 2004 Submittal "Newell Street II Supplemental Sampling Proposal to Support Future Remedial Design/Remedial Action Activities" (PDF) (1 pg, 120K)
- Letter from Gates (GE) to Nalipinski (USEPA), March 2, 2004, Supplemental Sampling Proposal to Support Future Removal Design/Removal Action Activities for Newell Street Area II (PDF) (11 pp, 8.3MB)
- Letter from Olson (USEPA) to Silfer (GE), October 2, 2003, Conditional Approval of GE's August 2003 Newell Street Area II Supplemental Pre-Design Investigation Report (PDF) (1 pg, 99K)
- Letter from Silfer (GE) to Olson (USEPA), August 12, 2003, Supplemental Pre-Design Investigation Report for Newell Street Area II (PDF) (52 pp, 6MB)
- Letter from Olson (USEPA) to Silfer (GE), May 13, 2003, Conditional Approval of GE's May 5, 2003 Response to EPA's April 21, 2003 Conditional Approval Letter for the Pre-Design Soil Investigation Report for Newell Street Area II. (PDF) (1 pg, 68K)
- Letter from Silfer (GE) to Olson (USEPA), May 5, 2003, Response to EPA's April 21, 2003 Conditional Approval Letter for Pre-Design Investigation Report for Newell Street Area II (PDF) (10 pp, 1.9MB)
- Letter from Olson (USEPA) to Silfer (GE), April 21, 2003, Conditional Approval of GE's February 2003 Pre-Design Investigation Report for Newell Street Area II Removal Action (PDF) (3 pp, 237K)
- Letter (with enclosures) from Silfer (GE) to Olson (USEPA), February 20, 2003, Re: Newell Street Area II Pre-Design Investigation Report
- Vol I Part 1 (PDF) (82 pp, 14.3MB)
- Vol I Part 2 (PDF) (51 pp, 12.5MB)
- Vol II Part 1 (PDF) (204 pp, 21.9MB)
- Vol II Part 2 (PDF) (114 pp, 19.7MB)
- Letter from Olson (USEPA) to Silfer (GE), August 21, 2002, Conditional Approval of GE's May 2002 Newell Street Area II Predesign Investigation Work Plan Addendum (PDF) (4 pp, 267K)
- Letter from Silfer (GE) to Olson (USEPA), May 21, 2002, Newell Street Area II Pre-Design Investigation Work Plan Addendum (PDF) (54 pp, 8MB)
- Letter from Olson (USEPA) to Silfer (GE), April 18, 2002, Comments on GE's October 2001 Pre-Design Investigation Work Plan for the Newell Street Area II Removal Action (PDF) (3 pp, 264K)
- Pre-Design Investigation Work Plan for the Newell Street Area II Removal Action, Blasland Bouck & Lee, Inc. (Prepared for GE), October 2001
- Part 1 (PDF) (154 pp, 17.4MB)
- Part 2 (PDF) (190 pp, 17MB)
- Letter from Silfer (GE) to Olson (USEPA), July 16, 2001, Lyman Street Area and Newell Street Area II Remediation of GE Parking Lot Areas. (PDF) (2 pp, 153K)
- Letter from Tagliaferro (USEPA) to Silfer (GE), July 22, 1999, Status of Newell Street II Source Control Activities (PDF) (2 pp, 89K)
- Geophysical Investigation, General Electric Newell Street Parking Lot Site, Geophysics GPR International, Inc. (Prepared for Blasland Bouck & Lee Inc), May 1996. (PDF) (34 pp, 4.5MB)
- MCP Interim Phase II Report for Newell Street Parking Lot Site and Current Assessment Summary for USEPA Area 5B, Blasland Bouck & Lee Inc. (Prepared for GE), March 1994, Volumes 1 - 4
- Vol 1 (PDF) (169 pp, 18.1MB)
- Vol 2 (PDF) (62 pp, 8.7MB)
- Vol 3 Part 1 (PDF) (230 pp, 20.4MB)
- Vol 3 Part 2 (PDF) (395 pp, 21.4MB)
- Vol 4 (PDF) (183 pp, 8.4MB)
Former Filled Oxbows J and K
- Letter (with attachments) from Gates (GE) to Tagliaferro and Fisher (USEPA), May 2, 2013, Re: East Street Area 2-South, Building 71 and Hill 78 On-Plant Consolidation Areas, Former Oxbow Areas J and K, and Newell Street Area II Summary of October/Novermber 2012 Tree/Shrub Installation Activities (PDF) (7 pp, 1.6MB)
- Letter (with attachments) from Gates (GE) to to Fisher (USEPA) and Gorski (MDEP), January 3, 2013, Re: Former Oxbow Areas J and K Summary of 2012 Conditional Solution Inspection Activities (PDF) (10 pp, 175K)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA), October 10, 2012, Re: Former Oxbow Areas J and K Summary of September 2012 Inspection Activities (PDF) (25 pp, 1.5MB)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA), June 21, 2012, Re: Former Oxbow Areas J and K; Summary of May 2012 Vegetation Inspection Activities (PDF) (22 pp, 15.2MB)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA) and Gorski (MDEP), December 15, 2011, Re: Former Oxbow Areas J and K Summary of 2011 Conditional Solution Inspection Activities (PDF) (10 pp, 177K)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA), October 21, 2011, Re: Former Oxbow Areas J and K Summary of September 2011 Inspection Activities (PDF) (27 pp, 2.6MB)
- Letter (with attachment) from Gates (GE) to Fisher (USEPA), June 8, 2011, Re: Former Oxbow Areas J and K Summary of May 2011 Vegetation Inspection Activities (PDF) (25 pp, 1.5MB)
- Letter (with attachments) from Gates (GE) to Tagliaferro and Fisher (USEPA), December 28, 2010, Re: Former Oxbow Areas J and K (GECD420), Lyman Street Area (GECD430), and Newell Street Area II (GECD450); Summary of October and November 2010 Tree/Shrub Installation Activities (PDF) (5 pp, 2.5MB)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA) and Gorski (MADEP), December 14, 2010, Re: Former Oxbow Areas J and K Summary of 2010 Conditional Solution Inspection Activities (PDF) (11 pp, 370K)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA), October 8, 2010, Re: Former Oxbow Areas J and K Summary of September 2010 Inspection Activities (PDF) (33 pp, 1.3MB)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA), June 11, 2010, Re: Former Oxbow Areas J and K Summary of May 2010 Vegetation Inspection Activities (PDF) (26 pp, 1.5MB)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA) and Gorski (MADEP), December 17, 2009, Re: Former Oxbow Areas J and K Summary of 2009 Conditional Solution Inspection Activities (PDF) (10 pp, 306K)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA), October 22, 2009, Re: Former Oxbow Areas J and K Summary of September 2009 Inspection Activities (PDF) (29 pp, 726K)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA), June 10, 2009, Re: Former Oxbow Areas J and K Summary of May 2009 Vegetation Inspection Activities (PDF) (29 pp, 705K)
- Letter (with attachments) from Gates (GE) to Hull (USEPA), September 16, 2008, Re: Former Oxbow Areas J and K Summary of August 2008 Inspection Activities (PDF) (29 pp, 776K)
- Pollution Report (POLREP) # 2 and Final - Former Oxbow Areas J & K Removal Action Area (RAA), July 21, 2008 (PDF) (6 pp, 214K)
- Letter from Steenstrup (MADEP) to Tagliaferro (USEPA), May 21, 2008, Re: Former Oxbow Areas J and K Approval of Final Completion Report for Former Oxbow Areas J and K Removal Action (PDF) (1 pg, 241K)
- Letter (with attachments) from Gates (GE) to Hull (USEPA), June 18, 2008, Re: Former Oxbow Areas J and K Summary of May 2008 Vegetation Inspection Activities (PDF) (29 pp, 792K)
- Letter from Hull (USEPA) to Gates (GE), June 3, 2008, Re: EPA Approval of, and Certificate of Completion for, General Electric's submittal entitled Final Completion Report for Former Oxbow Areas J and K Removal Action, dated May 2008 (PDF) (3 pp, 488K)
- Letter from Gates (GE) to Hull (USEPA), May 28, 2008, Re: Former Oxbow Areas J and K Final Completion Report for Former Oxbow Areas J and K Removal Action Appendix C of Final Competion Report , Appendix C of Final Competion Report - Signed and Stamped (PDF) (5 pp, 2.8MB)
- Letter (with enclosure) from Gates (GE) to Hull (USEPA), May 13, 2008, Re: Former Oxbow Areas J and K Final Completion Report for Former Oxbow Areas J and K Removal Action (PDF) (518 pp, 15.9MB)
- Letter from Gates (GE) to Hull (USEPA) and Steenstrup (MADEP), December 21, 2007, Re: Former Oxbow Areas J and K Summary of 2007 Conditional Solution Inspection Activities (PDF) (10 pp, 142K)
- Letter (with report) from Gates (GE) to Hull (USEPA), November 7, 2007, Re: Former Oxbow Areas J and K Summary of October 2007 Inspection Activities (PDF) (13 pp, 1.4MB)
- Letter from Gates (GE) to Tagliaferro (USEPA), July 11, 2007, Re: Former Oxbow Areas J and K, Summary of May 2007 Inspection Activities (PDF) (13 pp, 921K)
- Letter from Gates (GE) to Tagliaferro (USEPA), January 3, 2007, Former Oxbow Areas J and K Summary of November 2006 Inspection Activities (PDF) (11 pp, 451K)
- Letter from Tagliaferro (USEPA) to Silfer (GE), October 18, 2006, Re: Approval of General Electric's October 5, 2006 submittal titled Former Oxbow A & C, Former Oxbow J & K, and Lyman Street Area - Properties West of Lyman Street; Addendum to Supplemental Information Package (PDF) (2 pp, 90K)
- Letter from Gates (GE) to Tagliaferro (USEPA), October 5, 2006, Former Oxbow Areas A and C, Former Oxbow Areas J and K, Lyman Street Area - Properties West of Lyman Street Addendum to Supplemental Information Package (PDF) (32 pp, 1.6MB)
- Letter from Lovely (USEPA) to Silfer (GE), July 7, 2006, Conditional Approval of GE's June 15, 2006 Former Oxbow A & C, Former Oxbow J & K, and Lyman Street Area-Properties West of Lyman Street, Supplemental Information Package (PDF) (2 pp, 133K)
- Letter from Gates (GE) to Lovely (USEPA), July 6, 2006, Revision to Addendum to Final Removal Design/Removal Action Work Plan, Former Oxbow Areas J and K (PDF) (3 pp, 1.1MB)
- Letter from Lovely (USEPA) to Silfer (GE), June 23, 2006, EPA's Conditional Approval of the Addendum to Final Removal Design/Removal Action Work Plan for Former Oxbow Areas J & K (PDF) (2 pp, 73K)
- Letter and attachments from Gates (GE) to Lovely (USEPA), June 15, 2006, Supplemental Information Package Former Oxbow Areas A and C, Former Oxbow Areas J and K, and Lyman Street Area - Properties West of Lyman Street (PDF) (478 pp, 16.4MB)
- April 4, 2006 EPA conditional approval letter from William Lovely, EPA to Andrew Silfer, GE Re: Conditional Approval of General Electric’s submittal titled "Former Oxbow Areas J & K Additional Supplemental Sampling Proposal" (PDF) (2 pp, 70K)
- Addendum to Final Removal Design/Removal
Action Work Plan for Former Oxbow Areas J and K, Table of Contents,
April 2006 (PDF) (1 pg, 21K)
Volumes I - IV are internally linked from the table of contents. Combined file size is 21.1 mb - estimated download time: 50 minutes @ 56 kbs. - Letter from Gates (GE) to Lovely (USEPA), March 27, 2006, Additional Supplemental Sampling Proposal for Former Oxbow Areas J and K, Revised (PDF) (4 pp, 1.1MB)
- Letter from Lovely (USEPA) to Silfer (GE), February 23, 2006, Conditional Approval of GE's submittal Final Removal Design/Removal Action Work Plan for Former Oxbow Areas J & K (PDF) (4 pp, 214K)
- Letter from Lovely (USEPA) to Silfer (GE), January 17, 2006, Conditional Approval of GE's submittal "Former Oxbow Areas J & K Supplemental Sampling Plan" (PDF) (2 pp, 110K)
- Letter from Gates (GE) to Lovely (USEPA), November 2, 2005, Former Oxbow Areas J and K Supplemental Sampling Plan (PDF) (7 pp, 4.9MB)
- Final Removal Design/Removal Action Work Plan for Former Oxbow Areas J and K, Blasland, Bouck, & Lee, Inc., September 2005 (PDF) (98 pp, 5.1MB)
- Letter from Lovely (USEPA) to Silfer (GE), June 14, 2005, Approval of GE's Conceptual Removal Design/Removal Action Work Plan for Former Oxbow Areas J and K (PDF) (2 pp, 90K)
- Conceptual Removal Design/Removal Action Work Plan for Former Oxbow Areas J and K (PDF) (916 pp, 13MB)
- Letter from Lovely (USEPA) to Silfer (GE), January 10, 2005, Conditional Approval of GE's November 2004 Former Oxbow Areas J and K, Additional Supplemental Pre-Design Investigation Report (PDF) (2 pp, 135K)
- Letter from Silfer (GE) to Lovely (USEPA), November 24, 2004, Additional Supplemental Pre-Design Investigation Report for Former Oxbow Areas J and K (PDF) (37 pp, 5.7MB)
- Letter from Lovely (USEPA) to Silfer (GE), August 26, 2004, Approval of GE's June 2004 Former Oxbow Areas J and K Supplemental Pre-Design Investigation Report and Additional Sampling Proposal (PDF) (3 pp, 179K)
- Letter from Silfer (GE) to Lovely (USEPA), June 28, 2004, Supplemental Pre-Design Investigation Report and Additional Sampling Proposal for Former Oxbow Areas J and K (PDF) (150 pp, 6.5MB)
- Letter from Nalipinski (USEPA) to Silfer (GE), March 29, 2004, Conditional Approval of GE's January 28, 2004 Former Oxbow Areas J and K, Preliminary Remedial Evaluations and Proposal for Supplemental Pre-Design Investigation (PDF) (2 pp, 126K)
- Letter from Gates (GE) to Nalipinski (USEPA), January 28, 2004, Preliminary Remedial Evaluations and Proposal for Supplemental Pre-Design Investigations for Former Oxbow Areas J and K (PDF) (23 pp, 3.4MB)
- Letter from Nalipinski (USEPA) to Silfer (GE), September 29, 2003, Comments on GE's 11 July 2003 Pre-Design Investigation Report for the Former Oxbow Areas J and K Removal Action (PDF) (2 pp, 237K)
- Pre-Design Investigation Report for Former Oxbow Areas J and K, Volumes 1 through 3, Blasland Bouck & Lee Inc. (Prepared for GE), July 2003
- Volume I (PDF) (113 pp, 11.6MB)
- Volume II (PDF) (230 pp, 18MB)
- Volume III (PDF) (117 pp, 20.2MB)
- Letter from Nalipinski (USEPA) to Silfer (GE), January 13, 2003, Review of Addendum to Pre-Design Investigation Work Plan for Former Oxbow Areas J and K (PDF) (2 pp, 147K)
- Letter from Silfer (GE) to Olson (USEPA), January 2, 2003, Addendum to Pre-Design Investigation Work Plan for Former Oxbow Areas J and K (PDF) (44 pp, 5MB)
- Letter from Nalipinski (USEPA) to Silfer (GE), November 19, 2002, Comments of GE's 26 June 2002 Pre-Design Investigation Work Plan for Oxbow Areas J and K Removal Action (PDF) (2 pp, 230K)
- Pre-Design Investigation Work Plan for the Former Oxbow Areas J and K Removal Action, Blasland Bouck & Lee Inc. (Prepared for GE), June 2002 (PDF) (68 pp, 6.6MB)
- Letter from Gates (GE) to Cutler (MDEP), May 22, 2001, Evaluation of Appendix IX+3 Constituents and Revised Soil Removal Limits for Parcel K10-6-3 (PDF) (7 pp, 770K)
General
- Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA) and Fisher (USEPA), January 23, 2012, Re: GE-Pittsfield/Housatonic River Site; Newell Street Area II, Lyman Street Area, Former Oxbow Areas J and K, and Building 71 and Hill 78 On-Plant Consolidation Areas; Summary of October and November 2011 Tree/Shrub Installation Activities (PDF) (7 pp, 986K)
- Letter (with attachments) from Gates (GE) to Tagliaferro and Fisher (USEPA), December 28, 2010, Re: Former Oxbow Areas J and K, Lyman Street Area, and Newell Street Area II Summary of October and November 2010 Tree/Shrub Installation Activities (PDF) (5 pp, 2MB)
- Letter (with attachment) from Gates (GE) to Tagliaferro (USEPA) and Fisher (USEPA), August 16, 2010, Re: Former Oxbow Areas A and C, Former Oxbow Areas J and K, Lyman Street Area and Newell Street Area II Summary of August 2010 Tree/Shrub Installation Activities (PDF) (7 pp, 1.2MB)
- Letter (with attachments) from Gates (GE) to Tagliaferro ( USEPA), December 10, 2009, Re: Various Removal Action Areas Response to EPA's Comments Regarding Summer 2009 Inspection Summary Reports (PDF) (13 pp, 1.5MB)
- Supplemental Information Package- Analytical Data for Proposed Backfill Sources, Blasland, Bouck & Lee, Inc., July 2006 (PDF) (6 pp, 520K)
- MCP Phase I and Interim Phase II Report for Former Housatonic River Oxbow Areas A, B, C, J, and K., Blasland, Bouck, & Lee, Inc. February 1996. (PDF) (2 pp, 70K)