July 24, 2014 - addition(s) to Meetings and Events

GE-Housatonic River Citizens Coordinating Council (CCC) Meetings and Events - Past Meetings - May 7, 2014

CCC Action Item Tracker, Updated July 17, 2014 (PDF) (4 pp, 615 K)

July 22, 2014 - addition(s) to GE Plant Area - Reports

East Street Area 2 - South

Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), July 7, 2014, Re: Soil Cleanup Completion Letter for Recovery Well 17W Release (PDF) (69 pp, 3 MB)

July 22, 2014 - addition(s) to Silver Lake - Reports

Soils Adjacent to the Silver Lake

Letter from Dickerson (USEPA) to Gates (GE), July 21, 2014, Re: Conditional Approval of GE's June 25, 2014 Initial Post-Remediation Inspection and Spring 2014 Inspection of Shoreline Armor Stone, Backfilled/Restored Areas Adjacent to Silver Lake, and Non-Natural Resource Restoration/Enhancement Plantings (PDF) (3 pp, 1.2 MB)

Letter from Gates (GE) to Pelto (DEP), July 18, 2014, Re: Natural Resource Restoration/Enhancement (NRRE) Installation Inspection and Spring 2014 Inspection of NRRE Plantings (PDF) (35 pp, 1.9 MB)

July 22, 2014 - addition(s) to Groundwater - Reports

GMA - 1, East Street Area 1, East Street Area 2, Lyman Street Area, Newell Street Area I, Newell Street Area II, Oxbow B, Silver Lake

Letter (with attachments) from Gates (GE) to Ziegler (DEP) and Tagliaferro (USEPA), July 17, 2014, Re: Pre-Excavation Notification - Southside Groundwater Recovery System Repair (PDF) (7 pp, 863 K)

July 21, 2014 - addition(s) to Meetings and Events

GE-Housatonic River Citizens Coordinating Council (CCC) Meetings and Events - Past Meetings - May 7, 2014

Draft Agenda (PDF) (1 pg, 738 K)

July 15, 2014 - addition(s) to GE Plant Area - Reports

East Street Area 2 - South

Letter (with attachments) from Gates (GE) to Pelto (MADEP), June 27, 2014, Re: Summary of May 2014 Inspection of Natural Resource Restoration/Enhancement Measures (PDF) (14 pp, 4.1 MB)

July 14, 2014 - addition(s) to Sitewide Document - Reports

CD Monthly Status Reports - 2014

June 2014 (PDF) (226 pp, 7.1 MB)

July 11, 2014 - addition(s) to Rest of River - Reports

Biota Consumption Advisories

Letter (with attachments) from Silfer (GE) to Svirsky (USEPA), July 30, 2010, Re: Rest of River Biota Consumption Advisory Signs (PDF) (31 pp, 10 MB)

Letter (with attachment) from Svirsky (USEPA) to Silfer (GE), May 25, 2010, Re: Rest of River Biota Consumption Advisory Signage (PDF) (11 pp, 2.6 MB)

Proposal for Informing the Public of Biota Consumption Advisories on the Housatonic River, December 2000 (PDF) (28 pp, 1.9 MB)

Letter from Silfer (GE) to Johnson (CTDEP), November 27, 2000, Re: Transmittal of Consumption Advisory Signs (PDF) (1 pg, 229 K)

July 10, 2014 - addition(s) to Meetings and Events

U.S. EPA Housatonic River Public Meetings - June 24, 2014

EPA's Proposed Remedial Action for Housatonic Rest of River Presentation (PDF) (51 pp, 6.7 MB)

GE-Housatonic River Citizens Coordinating Council (CCC) Meetings and Events - Past Meeting - May 7, 2014

Draft Meeting Summary (PDF) (19 pp, 753 K)

July 10, 2014 - addition(s) to Rest of River - Reports

General

Letter from Spalding (USEPA) to Klee (GE), June 24, 2014, Re: Response to Comments on Housatonic Rest of River Proposal (PDF) (1 pg, 858 K)

Letter from Klee (GE) to Spalding (USEPA), June 18, 2014, Re: Comments on Housatonic Rest of River Proposal (PDF) (2 pp, 1 MB)

June 30, 2014 - addition(s) to Silver Lake - Reports

Soils Adjacent to the Silver Lake

Letter (with attachments) from Gates (GE) to Dickerson (USEPA), June 25, 2014, Re: Initial Post-Remediation Inspection and Spring 2014 Inspection of Shoreline Armor System, Backfilled/Restored Areas Adjacent to Silver Lake, and Non-Natural Resource Restoration/Enhancement Plantings (PDF) (30 pp, 1 MB)

June 26, 2014 - addition(s) to Rest of River - Figures

Core Area Habitat Mapping, Reaches 5 and 6 (June 2012) (PDF) (1 pg, 1.6 MB)

June 19, 2014 - addition(s) to Floodplain Properties - Reports

Phase 4 Floodplain Properties

Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), June 13, 2014, Re: Summary of May 2014 Tree Cage Inspection Activities for the Group 4C Floodplain Properties (PDF) (4 pp, 2.4 MB)

June 19, 2014 - addition(s) to GE Plant Area - Reports

East Street Area 2 - North

Letter (with attachments) from Gates (GE) to Fisher (USEPA), June 13, 2014, Re: Summary of May 2014 Inspection Activities (PDF) (6 pp, 926 K)

East Street Area 2 - South

Letter (with attachments) from Gates (GE) to Fisher (USEPA), June 12, 2014, Re: Summary of May 2014 Inspection Activities (PDF) (36 pp, 1.6 MB)

June 19, 2014 - addition(s) to OPCA - Reports

OPCA Reports

Letter (with attachments) from Gates (GE) to Fisher (USEPA), June 13, 2014, Re: Summary of May 2014 Post-Closure Inspection Activities (PDF) (20 pp, 3.2 MB)

June 12, 2014 - addition(s) to GE Plant Area - Reports

Unkamet Brook Area

Letter from Gates (GE) to Ziegler (MDEP) and Tagliaferro (USEPA), June 10, 2014, Re: Pre-Excavation Notification - Storm Sewer Repairs (PDF) (19 pp, 1.6 MB)

June 12, 2014 - addition(s) to Sitewide Document - Reports

CD Monthly Status Reports - 2014

May 2014 (PDF) (245 pp, 28.2 MB)

June 12, 2014 - addition(s) to Former Filled Oxbows - Reports

Lyman Street Area and Former Filled Oxbow B

Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), June 5, 2014, Re: Summary of May 2014 Engineered Barrier Inspection Activities (PDF) (6 pp, 2.9 MB)

Newell Street Area I

Letter (with attachments) from Gates (GE) to Fisher (USEPA), June 5, 2014, Re: Summary of May 2014 Engineered Barrier Inspection Activities (PDF) (21 pp, 3.2 MB)

Newell Street Area II

Letter (with attachments) from Gates (GE) to Fisher (USEPA), June 4, 2014, Re: Summary of May 2014 Inspection Activities (PDF) (33 pp, 3.3 MB)

June 6, 2014 - addition(s) to Groundwater - Reports

GMA - 1, East Street Area 1, East Street Area 2, Lyman Street Area, Newell Street Area I, Newell Street Area II, Oxbow B, Silver Lake

Letter from Fisher (USEPA) to Gates (GE), June 4, 2014, Re: Conditional Approval of General Electric's February 28, 2014 submittal titled Groundwater Management Area 1, Addendum to NAPL Monitoring Report for Spring 2014 (PDF) (4 pp, 492 K)

June 5, 2014 - addition(s) to Rest of River - Reports

Proposed Remedial Action and Supporting Documentation

Administrative Record File Index for the Draft Modification of the Reissued RCRA Permit/Statement of Basis, EPA, June 2014 (PDF) (414 pp, 1.7 MB)

June 2, 2014 - addition(s) to Silver Lake - Reports

Silver Lake Sediment and Soils Adjacent to Silver Lake

Letter (with attachments) from Silfer (GE) to Pelto (DEP), May 23, 2014, Re: Revised Completion of Installation of Restoration Work Report (PDF) (24 pp, 2.4 MB)

June 2, 2014 - addition(s) to GE Plant Area - Reports

20s, 30s, and 40s Complexes

Letter (with attachment) from Gagnon (OReilly, Talbot & Okun Associates) to Ms Tor (DEP) and Tagliaferro (USEPA), May 22, 2014, Re: Building Demolition Barrier Areas Inspections (PDF) (22 pp, 6.4 MB)

40s Complex

Letter (with attachment) from Gagnon (OReilly, Talbot & Okun Associates) to Ms Tor (DEP) and Tagliaferro (USEPA), May 22, 2014, Re: 40s Other Ground Covering Feature Area and Slab Area Inspection (PDF) (9 pp, 2 MB)

East Street Area 2 - North

Letter (with attachment) from Gagnon (OReilly, Talbot & Okun Associates) to Ms Tor (DEP) and Tagliaferro (USEPA), May 22, 2014, Re: 19s Complex: Annual Inspection of Placed Usable Crushed Building Materials (PDF) (12 pp, 4.8 MB)

Letter (with attachment) from Gagnon (OReilly, Talbot & Okun Associates) to Ms Tor (DEP) and Tagliaferro (USEPA), May 22, 2014, Re: 19s Complex: Annual Inspection of 19s Complex and Woodlawn Avenue Area (PDF) (10 pp, 3.4 MB)

May 30, 2014 - addition(s) to Rest of River - Reports

Proposed Remedial Action and Supporting Documentation

Statement of Basis for EPA's Proposed Remedial Action for the Housatonic River Rest of River, EPA, June 2014 (PDF) (44 pp, 4.3 MB)

Draft Modification to the Reissued RCRA Permit, EPA, June 2014 (PDF) (88 pp, 12.9 MB)

Comparative Analysis of Remedial Alternatives for the General Electric (GE)-Pittsfield/Housatonic River Project; Rest of River, EPA, May 2014 (PDF) (380 pp, 19.6 MB)

Memo from Edward Garland (HDR) to Scott Campbell (Weston Solutions), May 16, 2014, Re: PCB Flux from Cap to Meet AWQC (PDF) (1 pg, 464 K)

Memo from Edward Garland (HDR) to Scott Campbell (Weston Solutions), April 25, 2014, Re: Performance standard Flow-Based Annual Average PCB Flux Methodology (PDF) (2 pp, 742 K)

White Paper Dam Removal Practices and Implications for Dams on the Housatonic River, Stantec Consulting Services (for EPA), April 17, 2014 (PDF) (194 pp, 5.5 MB)

Memorandum from Robert Cianciarulo (EPA) to Stephen Ells (EPA), April 9, 2014, Re: Contaminated Sediment Risk Management Principles (PDF) (6 pp, 723 K)

Discussions between Government Agencies and GE

EPA Memorandum to GE Housatonic Site File, May 28, 2014, Re: EPA/GE Discussions: August 2012 – December 2013 (including attachment) (PDF) (448 pp, 29.9 MB)

May 23, 2014 - addition(s) to GE Plant Area - Reports

Unkamet Brook Area

Letter from Dickerson (USEPA) to Gates (GE), May 21, 2014, Re: Conditional Approval of GE's April 2014 Revised Final Removal Design/Removal Action Work Plan for Unkamet Brook Area-Remainder (PDF) (6 pp, 1.5 MB)

May 22, 2014 - addition(s) to GE Plant Area - Reports

General

Letter from Fisher (USEPA) to Gates (GE), May 19, 2014, Re: Approval of General Electric's April 18, 2014 submittal titled Former 10c Oil Pipelines at GE Plant Area, Pipeline Investigation, Removal, and Capping - Completion Report (PDF) (2 pp, 483 K)

May 15, 2014 - addition(s) to Groundwater - Reports

GMA - 3, Unkamet Brook Area

Letter from Fisher (USEPA) to Gates (GE), May 14, 2014, Re: Conditional Approval of General Electric's March 17, 2014 submittal titled Groundwater Management Area 3, Proposed Monitoring Well Decomissioning Methods (PDF) (2 pp, 477 K)

May 15, 2014 - addition(s) to GE Plant Area - Reports

East Street Area 2 - South

Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA) and Fisher (USEPA), May 12, 2014, Re: East Street Area 2-South Summary of November 2013 and May 2014 Tree/Shrub Installation Activities (PDF) (4 pp, 910 K)

May 13, 2014 - addition(s) to Sitewide Document - Reports

CD Monthly Status Reports - 2014

April 2014 (PDF) (339 pp, 9.9 MB)

May 13, 2014 - addition(s) to OPCA - Reports

OPCA Reports

Letter from Fisher (USEPA) to Gates (GE), May 8, 2014, Re: Conditional Approval of General Electric's March 7, 2014 submittal titled On-Plant Consilidation Areas, Post-Closure Groundwater Monitoring Program Monitoring Event Evaluation Report for Fall 2013, GE-Pittsfield/Housatonic River Site (PDF) (2 pp, 486 K)

May 13, 2014 - addition(s) to Groundwater - Reports

GMA - 4, Hill 78 Area

Letter from Fisher (USEPA) to Gates (GE), May 8, 2014, Re: Conditional Approval of General Electric's March 7, 2014 submittal titled Groundwater Management Area 4, Long-Term Trend Evaluation Report for Fall 2013, GE-Pittsfield/Housatonic River Site (PDF) (2 pp, 486 K)

May 13, 2014 - addition(s) to Meetings and Events

GE-Housatonic River Citizens Coordinating Council (CCC) Meetings and Events - May 7, 2014

Rest of River Presentation (PDF) (23 pp, 4 MB)

May 12, 2014 - addition(s) to Silver Lake - Reports

Silver Lake Sediment and Soils Adjacent to Silver Lake

Appendix I to the Removal Design/Removal Action Work Plan for Silver Lake Area, Post-Removal Site Control Plan and Restoration Project Monitoring and Maintenance Plan, August 1, 2011 (PDF) (38 pp, 2.3 MB)

May 2, 2014 - addition(s) to GE Plant Area - Reports

20s, 30s, and 40s Complexes

Letter from Gagnon (OReilly, Talbot & Okun Associates) to Ms Tor (DEP) and Tagliaferro (USEPA), April 28, 2014, Re: Notice of Inspections (PDF) (2 pp, 539 K)

April 30, 2014 - addition(s) to Floodplain Properties - Reports

Phase 4 Floodplain Properties

Memo from Daniel Nein (Stanted Consulting Services) to Thomas Czelusniak (Weston), April 29, 2014, Re: 2014 4C Floodplain Vernal Pool Monitoring Survey (PDF) (5 pp, 809 K)

April 24, 2014 - addition(s) to GE Plant Area - Reports

General

Letter (with attachments) from Gates (GE) to Fisher (USEPA), April 18, 2014, Re: Former 10c Oil Pipelines at GE Plant Area, Pipeline Investigation, Removal, and Capping - Completion Report (PDF) (64 pp, 7.4 MB)

April 18, 2014 - addition(s) to GE Plant Area - Reports

Unkamet Brook Area

Letter (with attachment) from Gates (GE) to Dickerson (USEPA), April 14, 2014, Re: Revised Final Removal Design/Removal Action Work Plan for Unkamet Brook Area-Remainder (PDF) (866 pp, 39.3 MB)

April 14, 2014 - addition(s) to Sitewide Document - Reports

CD Monthly Status Reports - 2014

March 2014 (PDF) (302 pp, 14.5 MB)

April 10, 2014 - addition(s) to Silver Lake - Reports

Silver Lake Sediment and Soils Adjacent to Silver Lake

Grant of Environmental Restriction and Easement, Land Adjacent to Silver Lake Boulevard and Fourth Street Owned by Pittsfield Economic Development Authority (PEDA), recorded April 4, 2014 (PDF) (43 pp, 2.6 MB)

Plan of Property and Restricted Area, Land Adjacent to Silver Lake Boulevard and Fourth Street Owned by Pittsfield Economic Development Authority (PEDA), recorded April 4, 2014 (PDF) (1 pg, 693 K)

Subordination Agreement for ERE for Land Adjacent to Silver Lake Boulevard and Fourth Street Owned by Pittsfield Economic Development Authority (PEDA), recorded April 4, 2014 (PDF) (6 pp, 726 K)

April 8, 2014 - addition(s) to Groundwater - Reports

GMA - 3, Unkamet Brook Area

Letter from Fisher (USEPA) to Gates (GE), April 8, 2014, Re: Approval of General Electric's February 27, 2014 submittal titled Groundwater Management Area 3, Groundwater Quality and NAPL Monitoring Interim Report for Fall 2013 (PDF) (2 pp, 491 K)

April 7, 2014 - addition(s) to Housatonic River ½ Mile - Reports

Annual Monitoring Reports

Letter from Tagliaferro (EPA) to Mooney (GE), April 3, 2014, Re: Approval of GE's 2013 Annual Monitoring Report, Upper 1/2-Mile Reach of the Housatonic River (PDF) (2 pp, 272 K)

April 4 , 2014 - addition(s) to Silver Lake - Reports

Silver Lake Sediment and Soils Adjacent to Silver Lake

Letter from Pelto (DEP) to Silfer (GE), April 1, 2014, Re: Completion of Installation of Restoration Work Report (PDF) (3 pp, 749 K)

Grant of Environmental Restriction and Easement, Land Adjacent to Silver Lake Boulevard owned by GE, recorded March 31, 2014 (PDF) (46 pp, 2.7 MB)

Plan of Property and Restricted Area, Land Adjacent to Silver Lake Boulevard owned by GE, recorded March 31, 2014 (PDF) (1 pg, 658 K)

Subordination Agreement for ERE for Land Adjacent to Silver Lake Boulevard owned by GE, recorded March 31, 2014 (PDF) (6 pp, 693 K)

March 27, 2014 - addition(s) to Rest of River - Reports

General

Letter from Housatonic Rest of River Municipal Committee to Murphy (EPA), March 25, 2014, Re: Comments Regarding the Forthcoming Remedy Plan (PDF) (6 pp, 571 K)

March 20, 2014 - addition(s) to Groundwater - Reports

GMA - 3, Unkamet Brook Area

Letter (with attachments) from Gates (GE) to Fisher (USEPA) and Dickerson (USEPA), March 17, 2014, Re: Groundwater Management Area 3 Proposed Monitoring Well Decommissioning Methods (PDF) (11 pp, 876 K)

March 14, 2014 - addition(s) to Groundwater - Reports

GMA - 1, East Street Area 1, East Street Area 2, Lyman Street Area, Newell Street Area I, Newell Street Area II, Oxbow B, Silver Lake

Letter (with enclosure) from Gates (GE) to Fisher (USEPA), March 5, 2014, Re: Groundwater Management Area 1 Errata to Addendum to NAPL Monitoring Report for Spring 2013 (PDF) (35 pp, 6 MB)

March 14, 2014 - addition(s) to Sitewide Document - Reports

CD Monthly Status Reports - 2014

February 2014 (PDF) (236 pp, 32.3 MB)

March 14, 2014 - addition(s) to Meetings and Events

GE-Housatonic River Citizens Coordinating Council (CCC) and Other Public Events - January 22, 2014

Final Meeting Summary (PDF) (14 pp, 603 K)

March 13, 2014 - addition(s) to OPCA - Reports

OPCA Reports

Letter (with enclosure) from Gates (GE) to Fisher (USEPA), March 7, 2014, Re: On-Plant Consolidation Areas Post-Closure Groundwater Monitoring Program Monitoring Event Evaluation Report for Fall 2013 (PDF) (254 pp, 15.2 MB)

March 13, 2014 - addition(s) to Groundwater - Reports

GMA - 4, Hill 78 Area

Letter (with enclosure) from Gates (GE) to Fisher (USEPA), March 7, 2014, Re: Groundwater Management Area 4 Long-Term Trend Evaluation Report for Fall 2013 (PDF) (143 pp, 4.2 MB)

March 11, 2014 - addition(s) to GE Plant Area - Reports

NPDES Permit and Support Documents

Letter (with enclosure) from Silfer (GE) to Dart (USEPA), Water Enforcement (USEPA) and WERO (MDEP), February 27, 2014, Re: NPDES Permit No. MA0003891 Part I.C.4 and Attachment C - Best Management Practices Plan BMP B.1 - 2013 Annual BMP and SWPPP Related Activities Summary Report (PDF) (60 pp, 2.6 MB)

Letter (with enclosure) from Silfer (GE) to Dart (USEPA), Water Enforcement (USEPA), and Bureau of Resource Protection (MDEP), February 27, 2014, Re: NPDES Permit No. MA0003891 Part I.C.2 - Stormwater Pollution Prevention Plan (PDF) (236 pp, 25 MB)

March 10, 2014 - addition(s) to Groundwater - Reports

GMA - 1, East Street Area 1, East Street Area 2, Lyman Street Area, Newell Street Area I, Newell Street Area II, Oxbow B, Silver Lake

Letter (with attachments) from Gates (GE) to Fisher (USEPA), February 28, 2014, Re: Groundwater Management Area 1 Addendum to NAPL Monitoring Report for Spring 2013 (PDF) (28 pp, 3.1 MB)

GMA - 3, Unkamet Brook Area

Letter (with enclosure) from Gates (GE) to Fisher (USEPA), February 27, 2014, Re: Groundwater Management Area 3 Groundwater Quality and NAPL Monitoring Interim Report for Fall 2013 (PDF) (226 pp, 9.1 MB)

March 10, 2014 - addition(s) to GE Plant Area - Reports

General

Letter from Fisher (USEPA) to Gates (GE), March 5, 2014, Re: Conditional Approval of General Electric's January 17, 2014 Submittal Titled Former 10c Oil Pipelines at GE Plant Area, Pipeline Investigation, Removal, and Capping – Completion Report (PDF) (4 pp, 503 K)

March 10, 2014 - addition(s) to Housatonic River ½ Mile - Reports

Annual Monitoring Reports

Letter (with enclosure) from Mooney (GE) to Tagliaferro (USEPA), February 28, 2014, Re: Upper ½ -Mile Reach of the Housatonic River 2013 Annual Monitoring Report (PDF) (33 pp, 1.7 MB)

March 10, 2014 - addition(s) to Housatonic River 1½ Mile - Reports

Annual Monitoring Reports

Letter (with enclosure) from Mooney (GE) to Tagliaferro (USEPA), February 28, 2014, Re: 1½ Mile Reach of the Housatonic River 2013 Annual Monitoring Report (PDF) (107 pp, 9.1 MB)

February 24, 2014 - addition(s) to GE Plant Area - Reports

East Street Area 2 - North

Letter (with attachments) from Gates (GE) to Ziegler (MDEP), February 18, 2014, Re: Grant of Environmental Restriction and Easement - Post-Work Notification Building 12 Utility Disconnection Project (PDF) (7 pp, 3.5 MB)

February 20, 2014 - addition(s) to Sitewide Document - Reports

CD Monthly Status Reports - 2014

January 2014 (PDF) (529 pp, 13.7 MB)

February 20, 2014 - addition(s) to GE Plant Area - Reports

Unkamet Brook Area

Letter (with attachments) from Dickerson (USEPA) to Gates (GE), February 14, 2014, Re: Conditional Approval of GE's April 2013 Final Removal Design/Removal Action Work Plan for Unkamet Brook Area-Remainder (PDF) (26 pp, 8.2 MB)

February 20, 2014 - addition(s) to Silver Lake - Reports

Soils Adjacent to the Silver Lake

Letter from Gates (GE) to Collingwood (Pittsfield Public Works), February 11, 2014, Re: [Conditional Solution Letter for] Tax Parcel Nos. I9-9-201 (551½ Fenn Street) and I9-9-17 (607 Fenn Street), Pittsfield, MA (PDF) (3 pp, 145 K)

Letter from Gates (GE) to Western Massachusetts Electric Company, February 11, 2014, Re: [Conditional Solution Letter for] Tax Parcel Nos. I9-9-201 (551½ Fenn Street) and I9-9-17 (607 Fenn Street), Pittsfield, MA (PDF) (3 pp, 146 K)

Letter from Gates (GE) to Verizon New England, Inc, February 11, 2014, Re: [Conditional Solution Letter for] Tax Parcel Nos. I9-9-201 (551½ Fenn Street) and I9-9-17 (607 Fenn Street), Pittsfield, MA (PDF) (3 pp, 144 K)

Letter from Gates (GE) to Greylock Federal Credit Union, February 11, 2014, Re: [Conditional Solution Letter for] Tax Parcel Nos. I9-9-201 (551½ Fenn Street) and I9-9-17 (607 Fenn Street), Pittsfield, MA, owned by Francese Family Realty, LLC (PDF) (2 pp, 141 K)

Letter from Gates (GE) to Greylock Federal Credit Union, February 11, 2014, Re: [Conditional Solution Letter for] Tax Parcel No. I9-9-34 (765 East Street), Pittsfield, MA (PDF) (2 pp, 135 K)

Letter from Gates (GE) to Ferry (Berkshire Bank), February 11, 2014, Re: [Conditional Solution Letter for] Tax Parcel Nos. I9-9-21 and I9-9-22 (689 East Street), Pittsfield, MA, owned by LIGE Realty, LLC (PDF) (2 pp, 136 K)

Letter (with attachments) from Gates (GE) to Haddad (Property Owner), February 6, 2014, Re: Your Property at 689 East Street, Pittsfield, MA; [Conditional Solution Letter for] Tax Parcel Nos. I9-9-21 and I9-9-22 (PDF) (11 pp, 1.1 MB)

Letter (with attachments) from Gates (GE) to Francese (Property Owner), February 6, 2014, Re: Your Properties at 551½ and 607 Fenn Street, Pittsfield, MA; [Conditional Solution Letter for] Tax Parcel Nos. I9-9-201 and I9-9-17 (PDF) (12 pp, 1.2 MB)

Letter (with attachments) from Gates (GE) to G&E Nominee Trust (Property Owner), February 6, 2014, Re: Your Property at 717 East Street, Pittsfield, MA; [Conditional Solution Letter for] Tax Parcel Nos. I9-9-25 (PDF) (10 pp, 1 MB)

Letter (with attachments) from Gates (GE) to Sheehan (Property Owner), February 6, 2014, Re: Your Property at 765 East Street, Pittsfield, MA; [Conditional Solution Letter for] Tax Parcel Nos. I9-9-34 (PDF) (10 pp, 542 K)

February 11, 2014 - addition(s) to GE Plant Area - Reports

East Street Area 2 - South

Letter (with Attachment) from Tagliaferro (EPA) to Gates (GE), February 10, 2014, Re: Conditional Approval of GE's January 8, 2014 Submittal Entitled Soil Cleanup Proposal for Recovery Well 17W Release (PDF) (3 pp, 755 K)

February 7, 2014 - addition(s) to Sitewide Document - Reports

Registry of Properties

Letter from Mooney (GE) to Mr. Van Der Kar (Agent, Conservation Commission), January 10, 2014, Re: Registry of Properties Adjacent to East Branch of Housatonic River and Subject to Consent Decree for GE-Pittsfield/Housatonic River Site (PDF) (2 pp, 112 K)

February 6, 2014 - addition(s) to Silver Lake - Reports

Silver Lake Sediment and Soils Adjacent to Silver Lake

Letter from Silfer (GE) to Pelto (DEP), February 3, 2014, Re: Completion of Installation of Restoration Work Report (PDF) (18 pp, 3 MB)

January 31, 2014 - addition(s) to Groundwater - Reports

GMA - 1, East Street Area 1, East Street Area 2, Lyman Street Area, Newell Street Area I, Newell Street Area II, Oxbow B, Silver Lake

Letter (with enclosure) from Gates (GE) to Fisher (USEPA), January 23, 2014, Re: Groundwater Management Area 1 Draft Baseline Assessment Final Report and Long-Term Monitoring Program Proposal (PDF) (601 pp, 16.3 MB)

January 29, 2014 - addition(s) to Silver Lake - Reports

Silver Lake Sediment and Soils Adjacent to Silver Lake

Grant of Environmental Restriction and Easement, Tax Parcel I9-3-32, recorded January 7, 2014 (PDF) (30 pp, 1.2 MB)

Plan of Property and Restricted Area, Tax Parcel I9-9-32, recorded January 7, 2014 (PDF) (1 pg, 117 K)

Grant of Environmental Restriction and Easement, Tax Parcel I9-3-33, recorded January 7, 2014 (PDF) (31 pp, 1.2 MB)

Plan of Property and Restricted Area, Tax Parcel I9-9-33, recorded January 7, 2014 (PDF) (1 pg, 120 K)

Subordination Agreement for ERE for Tax Parcel I9-9-33, recorded January, 7, 2014 (PDF) (2 pp, 63 K)

January 28, 2014 - addition(s) to GE Plant Area - Reports

General

Letter (with attachments) from Gates (GE) to Fisher (USEPA), January 17, 2014, Re: Former 10c Oil Pipelines at GE Plant Area Pipeline Investigation, Removal, and Capping - Completion Report (PDF) (63 pp, 7.2 MB)

January 27, 2014 - addition(s) to Former Filled Oxbows - Reports

Former Filled Oxbows A and C

Letter (with attachments) from Gates (GE), to Comalli (B.D.C.,Inc.) January 17, 2014, Re: Property at 101-103 Elm Street in Pittsfield, MA; Tax Parcel I8-23-6 (PDF) (17 pp, 1 MB)

January 27, 2014 - addition(s) to Meetings and Events

GE-Housatonic River Citizens Coordinating Council (CCC) Meetings and Events - January 22, 2014

Silver lake Cleanup Presentation (PDF) (16 pp, 3 MB)

CT Biota Monitoring Presentation (PDF) (11 pp, 1.6 MB)

January 24, 2013 - addition(s) to Meetings and Events

GE-Housatonic River Citizens Coordinating Council (CCC) Meetings and Events - September 18, 2013

Meeting Summary (PDF) (17 pp, 164 K)

January 24, 2014 - addition(s) to Rest of River - Reports

Corrective Measures Study - Reports and Documents

Letter from Svirsky (USEPA) to Silfer (GE), January 17, 2014, Re: Rest of River Revised Corrective Measures Study Report (PDF) (3 pp, 31 K)

January 24, 2014 - addition(s) to GE Plant Area - Reports

30s Complex

Letter (with attachments) from Gagnon (O'Reilly, Talbot & Okum Associates) to Ziegler (MDEP) and Tagliaferro (GE), January 13, 2013, Re: Post-Work Notification Pittsfield Economic Development Authority (PEDA) William Stanley Business Park, Pittsfield (PDF) (13 pp, 5.2 MB)

January 22, 2014 - addition(s) to GE Plant Area - Reports

20s, 30s, and 40s Complexes

Letter (with enclosure) from Gagnon (OReilly, Talbot & Qkun Associates) to Ms Tor (DEP) and Tagliaferro (USEPA), January 13, 2014, Re:Building Demolition Barrier Areas Inspections (PDF) (19 pp, 9.9 MB)

January 17, 2014 - addition(s) to GE Plant Area - Reports

East Street Area 2 - South

Letter (with attachments and enclosure) from Gates (GE) to Tagliaferro (USEPA), January 8, 2014, Re: East Street Area 2-South Soil Cleanup Proposal for Recovery Well 17W Release (PDF) (60 pp, 1.1 MB)

January 17, 2014 - addition(s) to Sitewide Document - Reports

CD Monthly Status Reports - 2013

December 2013 (PDF) (260 pp, 7.1 MB)

January 13, 2014 - addition(s) to Meetings and Events

GE-Housatonic River Citizens Coordinating Council (CCC) Meetings and Events - January 22, 2014

Draft Agenda (PDF) (1 pg, 75 K)

January 2, 2014 - addition(s) to Silver Lake - Reports

Silver Lake Sediment and Soils Adjacent to Silver Lake

Letter from Dickerson (USEPA) to Gates (GE), December 23, 2013, Re :Approval of GE's 12/9/13 Re-submittal of Re-evaluation of Bank Portions of Tax Parcels I9-9-1, I9-9-9 and I9-10-8, Silver Lake Area (PDF) (2 pp, 433 K)

January 2, 2014 - addition(s) to Groundwater - Reports

GMA - 1, East Street Area 1, East Street Area 2, Lyman Street Area, Newell Street Area I, Newell Street Area II, Oxbow B, Silver Lake

Letter from Fisher (USEPA) to Gates (GE), December 23, 2013, Re: Conditional Approval of General Electric's August 30, 2013 submittal titled Groundwater Management Area 1, NAPL Monitoring Report for Spring 2013 (PDF) (6 pp, 57 K)

December 31, 2013 - addition(s) to Floodplain Properties - Reports

Residential and Non-Residential Floodplain Properties Adjacent to the 1 1/2 Mile Reach -- General

Letter (with attachments) from Gates (GE) to Gorski (DEP), December 23, 2013, Re: Dalton Avenue Site; Periodic Review and Evaluation of Temporary Solutions at Tax Parcels K13-1-8, K13-1-11, K13-1-13, and K13-1-15 (PDF) (36 pp, 3.1 MB)

Letter (with attachment) from Gates (GE) to Gorski (DEP), December 23, 2013, Re: Commercial Street Site; Periodic Review and Evaluation of Temproary Solutions (PDF) (101 pp, 8 MB)

December 30, 2013 - addition(s) to Former Filled Oxbows - Reports

Newell Street Area II

Letter (with attachments) from Gates (GE) to Fisher (USEPA) and Gorski (DEP), December 18, 2013, Re: Newell Street Area II Summary of Annual ERE Inspection for the City of Pittsfield Property (PDF) (4 pp, 155 K)

Letter (with attachments) from Gates (GE) to Fisher (USEPA) and Gorski (DEP), December 18, 2013, Re: Newell Street Area II and Upper 1/2 Mile Reach of Housatonic River Summary of 2013 Conditional Solution Inspection Activities (PDF) (8 pp, 177 K)

December 30, 2013 - addition(s) to GE Plant Area - Reports

East Street Area 1 - North

Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA) and Gorski (DEP), December 11, 2013, Re: East Street Area 1-North Summary of 2013 Conditional Solution Inspection Activities (PDF) (7 pp, 177 K)

December 30, 2013 - addition(s) to Housatonic River 1½ Mile - Reports

Post-Removal Inspection Reports

Letter (with attachments) from Mooney (GE) to Tagliaferro (USEPA) and Gorski (DEP), December 11, 2013, Re: 1 1/2 Mile Reach of Housatonic River Summary of 2013 Conditional Solution Inspection Activities (PDF) (15 pp, 250 K)

December 26, 2013 - addition(s) to GE Plant Area - Reports

Unkamet Brook Area

Letter (with attachments) from Gates (GE) to Dickerson (USEPA) and Gorski (DEP), December 18, 2013, Re; Unkamet Brook Area Summary of 2013 Annual ERE Inspection Activities (PDF) (14 pp, 507 K)

December 26, 2013 - addition(s) to Floodplain Properties - Reports

Residential and Non-Residential Floodplain Properties Adjacent to the 1 1/2 Mile Reach -- General

Letter (with attachment) from Gates (GE) to Tagliaferro (USEPA) and Gorski (DEP), December 18, 2013, Re: Floodplain Non-Residential Properties Adjacent to 1.5 Mile Reach of Housatonic River and 1.5 Mile Reach of River Summary of Annual ERE Inspections of Parcels I8-4-7 and I7-1-101 (PDF) (6 pp, 188 K)

Letter (with attachment) from Gates (GE) to Tagliaferro (USEPA) to Gorski (DEP), December 18, 2013, Re: Floodplain Non-Residential Properties Adjacent to 1.5 Mile Reach of Housatonic River and 1.5 Mile Reach of River Summary of 2013 Conditional Solution Inspection at Parcel I7-1-5 (PDF) (4 pp, 161 K)

December 24, 2013 - addition(s) to Former Filled Oxbows - Reports

Lyman Street Area and Former Filled Oxbow B

Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA) and Gorski (DEP), December 11, 2013, Re: Lyman Street Area; Upper 1/2 Mile Reach of Housatonic River; 1 1/2 Mile Reach of Housatonic River Summary of 2013 Conditional Solution Inspection Activities (PDF) (19 pp, 1.4 MB)

Former Filled Oxbows A and C

Letter (with attachments) from Gates (GE) to Fisher (USEPA) and Gorski (DEP), December 11, 2013, Re: Former Oxbow Areas A and C; 1 1/2 Mile Reach of Housatonic River Summary of 2013 Conditional Solution Inspection Activities (PDF) (11 pp, 194 K)

Former Filled Oxbows J and K

Letter (with attachments) from Gates (GE) to Fisher (USEPA) and Gorski (DEP), December 11, 2013, Re: Former Oxbow Areas J and K Summary of 2013 Conditional Solution Inspection Activities (PDF) (12 pp, 642 K)

December 23, 2013 - addition(s) to Former Filled Oxbows - Reports

Newell Street Area I

Letter (with attachments) from Gates (GE) to Fisher (USEPA) and Gorski (DEP), December 11, 2013, Re: Newell Street Area I; Upper 1/2 Mile Reach of Housatonic River Summary of Annual ERE Inspection for Parcels J9-23-24 and J9-23-26 (PDF) (6 pp, 187 K)

Letter (with attachments) from Gates (GE) to Fisher (USEPA) and Gorski (DEP), December 11, 2013, Re: Newell Street Area I Summary of 2013 Conditional Solution Inspection Activities (PDF) (14 pp, 194 K)

December 20, 2013 - addition(s) to Housatonic River 1½ Mile - Reports

Post-Removal inspection Reports

Letter (with attachments) from Mooney (GE) to Tagliaferro (USEPA) and Gorski (DEP), December 11, 2013, Re: 1.5 Mile Reach of Housatonic River Summary of 2013 Annual ERE Inspection Activities (PDF) (12 pp, 210 K)

December 20, 2013 - addition(s) to Former Filled Oxbows - Reports

Lyman Street Area and Former Filled Oxbow B

Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA) and Gorski (DEP), December 11, 2013, Re: Lyman Street Area Summary of Annual ERE Inspection for Portion of the Lyman Street Sidewalk (PDF) (4 pp, 159 K)

December 16, 2013 - addition(s) to Floodplain Properties - Reports

Residential and Non-Residential Floodplain Properties Adjacent to the 1 1/2 Mile Reach -- General

Letter (with attachments) from Gates (GE) to Gorski (DEP), December 4, 2013, Re: Commercial Street Site, Pittsfield, MA Summary of 2013 Temporary Solution Inspection Activities (PDF) (30 pp, 1.2 MB)

Letter (with attachments) from Gates (GE) to Gorski (DEP), December 4, 2013, Re: Dalton Avenue Site Summary of 2013 Temporary Solution Inspection Activities (PDF) (10 pp, 175 K)

December 16, 2013 - addition(s) to Sitewide Document - Reports

CD Monthly Status Reports - 2013

November 2013 (PDF) (265 pp, 7.4 MB)

December 16, 2013 - addition(s) to Silver Lake - Reports

Silver Lake Sediment and Soils Adjacent to Silver Lake

Letter (with attachments) from Gates (GE) to Dickerson (USEPA), December 9, 2013, Re: Silver Lake Area Re-submittal of the Re-evaluation of Bank Portions of Tax Parcels I9-9-1, I9-9-9, and I9-10-8 (PDF) (30 pp, 2.1 MB)

December 6, 2013 - addition(s) to Former Filled Oxbows - Reports

Former Filled Oxbows J and K

Letter (with enclosure) from Gates (GE) to Cory S. Potts and Helen M. Potts, Trustees, and Cory S. Potts Family Nominee Trust, November 19, 2013, Re: Your Property on East Street, Pittsfield, MA -Tax Parcel Number K10-13-1 (PDF) (13 pp, 776 K)

December 2, 2013 - addition(s) to Silver Lake - Reports

Silver Lake Sediment and Soils Adjacent to Silver Lake

Letter from Dickerson (USEPA) to Gates (GE), November 26, 2013, Re: Conditional Approval of GE's 7/11/13 Re-evaluation of Bank Portions of Tax Parcels I9-9-1, I9-9-9, and I9-10-8, Silver lake Area (PDF) (2 pp, 535 K)

November 29, 2013 - addition(s) to Sitewide Document - Reports

CD Monthly Status Reports - 2013

October 2013 (PDF) (394 pp, 11.1 MB)

November 27, 2013 - addition(s) to Silver Lake - Reports

Silver Lake Sediment and Soils Adjacent to Silver Lake

Letter Dickerson (USEPA) to Gates (GE), November 13, 2013, Re: Approval of GE's 11/6/13 Re-evaluation of Bank Portions of Tax Parcels I9-9-31 and I9-9-32, Silver Lake Area (PDF) (2 pp, 78 K)

Letter from Dickerson (USEPA) to Gates (GE), November 13, 2013, Re: Conditional Approval of GE's 8/2/13 Re-evaluation of Recreational Area RA-5, Silver Lake Area (PDF) (2 pp, 203 K)

Letter from Dickerson (USEPA) to Gates (GE), November 13, 2013, Re: Conditional Approval of GE's 5/17/13 Re-evaluation of Portion of Tax Parcel I9-9-24 with in Silver Lake Area (PDF) (2 pp, 88 K)

November 26, 2013 - addition(s) to GE Plant Area - Reports

20s Complex

Plan of Restricted Areas for Amended ERE Grant, Parcel J10-10-101, Recorded October 29, 2013 (PDF) (1 pg, 299 K)

Amended Grant of Environmental Restriction and Easment, Parcel J10-10-101, Recorded October 29, 2013 (PDF) (48 pp, 2.1 MB)

Subordination Agreements for the Amended ERE Grant, Parcel J10-10-101, Recorded October 29, 2013 (PDF) (14 pp, 510 K)

As-Built Topographic Survey, 20s Complex, August 2, 2012, Referenced in October 29, 2013 Amended ERE Grant (PDF) (1 pg, 526 K)

30s Complex

Plan of Restricted Areas for Amended ERE Grant, Parcel I10-4-101, Recorded August 26, 2013 (PDF) (1 pg, 325 K)

November 26, 2013 - addition(s) to Groundwater - Reports

GMA - 1, East Street Area 1, East Street Area 2, Lyman Street Area, Newell Street Area I, Newell Street Area II, Oxbow B, Silver Lake

Letter from Fisher (USEPA) to Gates (GE), November 18, 2013, Re: Conditional Approval of General Electric’s October 4, 2013 submittal titled Groundwater Management Area 1, Supplemental LNAPL Volatilization Report for East Street Area 1, GE-Pittsfield/Housatonic River Site (PDF) (2 pp, 44 K)

November 12, 2013 - addition(s) to GE Plant Area - Reports

East Street Area 2 - North

Letter (with attachments) from Gates (GE) to Fisher (USEPA), November 4, 2013, Re: East Street Area 2-North Summary of Supplemental Inspection Activities - October 2013 (PDF) (5 pp, 513 K)

November 8, 2013 - addition(s) to Silver Lake - Reports

Silver Lake Sediment and Soils Adjacent to Silver Lake

Letter (with attachments) from Gates (GE) to Dickerson (USEPA), November 6, 2013, Re: Silver Lake Area Re-evaluation of Bank Portions of Tax Parcels I9-9-31 and I9-9-32 (PDF) (12 pp, 807 K)

November 6, 2013 - addition(s) to Rest of River - Reports

General

Letter (with enclosure) from Mooney (GE) to Peterson (CTDEEP) and Tagliaferro (USEPA), October 29, 2013, Re: Housatonic River, Connecticut Report on 2012 Fish Sampling and Benthic Insect Sampling (PDF) (96 pp, 1.7 MB)

November 6, 2013 - addition(s) to Former Filled Oxbows - Reports

Lyman Street Area and Former Filled Oxbow B

Letter (with attachments) from Tagliaferro (USEPA) to Philip & James Massery (Pittsfield, Ma), November 1, 2013, Re: Your Property at Lyman Street, Pittsfield, MA - Tax parcel I9-4-201 (PDF) (12 pp, 673 K)

November 5, 2013 - addition(s) to OPCA - Reports

OPCA PCB Ambient Air Sampling Results

Comparison of EPA and GE OPCA Replicate PCB Air Sampling Results for 2013 (PDF) (1 pg, 18 K)

PCB Air Sampling Results for 2013 (PDF) (1 pg, 15 K)

November 5, 2013 - addition(s) to Allendale - Reports

Allendale School PCB Air Sampling Results for 2013 (PDF) (1 pg, 17 K)

October 31, 2013 - addition(s) to Former Filled Oxbows - Reports

Newell Street Area II

Letter (with attachments) from Gates (GE) to Fisher (USEPA), October 23, 2013, Re: Newell Street Area II Summary of September 2013 Inspection Activities (PDF) (46 pp, 1.3 MB)

October 29, 2013 - addition(s) to Groundwater - Reports

GMA - 1, East Street Area 1, East Street Area 2, Lyman Street Area, Newell Street Area I, Newell Street Area II, Oxbow B, Silver Lake

Letter (with enclosure) from Gates (GE) to Fisher (USEPA), October 4, 2013, Re: Groundwater Management Area 1 Supplemental LNAPL Volatilization Assessment Report for East Street Area 1 (PDF) (118 pp, 3.4 MB)

October 28, 2013 - addition(s) to OPCA - Reports

OPCA Reports

Letter (with attachments) from Gates (GE) to Fisher (USEPA), October 10, 2013, Re: Building 71 and Hill 78 On-Plant Consolidation Areas Summary of September 2013 Post-Closure Inspection Activities (PDF) (17 pp, 3.2 MB)

October 28, 2013 - addition(s) to Groundwater - Reports

GMA - 3, Unkamet Brook Area

Letter from Fisher (USEPA) to Gates (GE), October 22, 2013, Re: Conditional Approval of General Electric’s August 30, 2013 submittal titled Groundwater Management Area 3, Groundwater Quality and NAPL Monitoring Interim Report for Spring 2013, GE-Pittsfield/Housatonic River Site (PDF) (2 pp, 44 K)

October 28, 2013 - addition(s) to Former Filled Oxbows - Reports

Lyman Street Area and Former Filled Oxbow B

Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), October 11, 2013, Re: Lyman Street Area Summary of September 2013 Inspection Activities (PDF) (19 pp, 1.2 MB)

Newell Street Area I

Letter (with attachments) from Gates (GE) to Fisher (USEPA), October 11, 2013, Re: Newell Street Area I Summary of September 2013 Inspection Activities (PDF) (26 pp, 3.2 MB)

Former Filled Oxbows J and K

Letter (with attachments) from Gates (GE) to Fisher (USEPA), October 11, 2013, Re: Former Oxbow Areas J and K Summary of September 2013 Inspection Activities (PDF) (23 pp, 1.4 MB)

October 25, 2013 - addition(s) to OPCA - Reports

OPCA Reports

Letter from Fisher (USEPA) to Gates (GE), October 23, 2013, Re: Conditional Approval of General Electric’s August 22, 2013 submittal titled Post-Closure Groundwater Quality Monitoring and Trend Evaluation Report for Hill 78 and Building 71 On-Plant Consolidation Areas for Spring 2013, GE-Pittsfield/Housatonic River Site (PDF) (3 pp, 39 K)

October 25, 2013 - addition(s) to Floodplain Properties - Reports

Phase 2 Floodplain Properties

Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), October 17, 2013, Re: Floodplain Residential and Non-Residential Properties Adjacent to 1 1/2 Mile Reach of Housatonic River Summary of September 2013 Inspection Activities at the Remediated Phase 2 Residential Floodplain Properties (PDF) (9 pp, 3.6 MB)

Phase 3 Floodplain Properties

Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), October 17, 2013, Re: Floodplain Residential Properties Adjacent to 1 1/2 Mile Reach of Housatonic River Summary of September 2013 Inspection Activities for the Phase 3 Floodplain Properties (PDF) (27 pp, 2.7 MB)

October 25, 2013 - addition(s) to Housatonic River 1½ Mile - Reports

Post-Removal Inspection Reports

Letter (with attachments) from Tagliaferro (USEPA) to Mooney (GE), October 9, 2013, RE: Summer 2013 Re-Vegetation Monitoring Inspection Report 1½ Mile Reach Removal Action GE-Pittsfield/Housatonic River Site, Pittsfield, Massachusetts (PDF) (2 pp, 45 K)

Letter from Tagliaferro (USEPA) to Mooney (GE), October 7, 2013, Re: 2013 Inspection of Riverbank Soil Restoration, Riprap, and Select Critical Ancillary Items; 1½ Mile Reach Removal Action GE-Pittsfield/Housatonic River Site, Pittsfield, Massachusetts (PDF) (2 pp, 31 K)

October 24, 2013 - addition(s) to Housatonic River 1½ Mile - Reports

Annual Monitoring Reports

Letter from Tagliaferro (USEPA) to Mooney (GE), March 28, 2013, Re: 2012 Annual Monitoring Report, 1½ Mile Reach Removal Action, GE-Pittsfield/Housatonic River Site, Pittsfield, Massachusetts (PDF) (4 pp, 62 K)

October 21, 2013 - addition(s) to Sitewide Document - Reports

CD Monthly Status Reports - 2013

September 2013 (PDF) (331 pp, 6.7 MB)

October 17, 2013 - addition(s) to Groundwater - Reports

GMA - 4, Hill 78 Area

Letter from Fisher (USEPA) to Gates (GE), September 30, 2013, Re: Conditional Approval of General Electric’s August 1, 2013 submittal titled Groundwater Management Area 4, Long-Term Monitoring Program Monitoring Event Evaluation Report for Spring 2013, GE-Pittsfield/Housatonic River Site (PDF) (2 pp, 30 K)

GMA - 5, Oxbow Areas A and C

Pollution Report (POLREP), from Fisher (USEPA) to (See Attached List), September 26, 2013, Re: Pollution Report (POLREP) 2 and Final Groundwater Management Area 5 Removal Action Area (RAA) (PDF) (5 pp, 79 K)

Letter (with enclosure) from Fisher (USEPA) to Gates (GE), September 26, 2013, Re: EPA Approval of, and Certificate of Completion for, General Electric’s submittal entitled Final Completion Report for the Groundwater Management Area 5 Removal Action, dated September 2013, GE-Pittsfield/Housatonic River Site, Pittsfield, Massachusetts (PDF) (3 pp, 414 K)

Letter from Eva Tor (DEP), to Tagliaferro (USEPA), September 24, 2013, Re: Pittsfield, Groundwater Management Area 5 Approval of Final Completion Report for the Groundwater Management Area 5 Removal Action (PDF) (1 pg, 62 K)