Atlas Tack Corporation Superfund Site
Weekly Demolition/Cleanup Activities Update

« Back to Atlas Tack Superfund Site Fact Sheet

Projected Activities for the Week of July 25 -- July 30

  • Continue segregating and processing demolition materials from the three-story building
  • Transport construction debris to off-site landfills and metal recovery facility
  • Continued air monitoring
  • Begin preparation of boiler building for demolition
  • Begin asbestos abatement of the boiler building
  • Begin high pressure washing of boiler building interior

Activities Performed During the Week of July 18 -- July 22

  • Window caulking removal complete on the three-story building and the boiler building
  • Installation of truck decontamination pad complete
  • Installation of site security fencing complete
  • Collection of PCB light ballasts complete
  • Complete demolition of 3-story building
  • Segregating and processing demolition materials
  • Transport construction debris off-site
  • Shipped 16 truckloads of wood for off site disposal
  • Shipped 6 truckloads of steel for off site disposal
  • 16,000 gallons of water delivered & stored on site
  • Conduct air monitoring daily at all stations
  • Fire Alarm paned removed from Boiler Bldg, relocated to Admin Bldg. by Atlas Tack Corp.
  • No safety violations reported, all workers continue to practice safe work habits.

Air Monitoring Information

Charter Environmental and Axiom, Inc. continue to monitor the four sampling locations during the 8 -hour day for dust particulate and asbestos.

The four perimeter sampling stations are set up in the following locations:

Station 1 -- Site fence gate on Pleasant Street
Station 2 -- Site fence on east end of Church Street
Station 3 -- Site fence on bike path at Tripp Street
Station 4 -- Site fence at bike path near Adams Street

The dust particulate and asbestos sampling results recorded at each station every hour in a monitoring log. These results are compared to the action levels established for each parameter. These action levels are concentrations at which it is deemed unsafe and work would have to stop.

Results of the air monitoring data has shown that exposure of unsafe conditions to workers in the exclusion zone and to the public is well below the actions levels.

Dust Particulate Monitoring -- The National Ambient Air Quality standard for particulates is 150 micrograms per cubic meter (µg/m3) over an average of 24 hours. This value will be used, however, for a one hour period. Heavy metal presence is factored into determination of this action level. The average levels recorded at these locations range from 0 to 0.04 (µg/m3), with most readings valued at zero. The maximum level for this week is also recorded and ranges from 0 to 13 (µg/m3).

Asbestos Monitoring - Asbestos monitoring is conducted on a continuous basis as well. Readings are taken and recorded every hour. The personal space for asbestos workers is also monitored continuously.

The action level for asbestos is 0.010fibers per cubic centimeter (f/cc). Average readings range from 0 to 0.003 f/cc, well below the action level. Most readings were non-detectable. Samples from each location are also taken into the trailer for microscopic readings to verify the data.

Actual Data - Below are tables showing the dust particulate and asbestos values taken at each sampling location and in the neighborhood during the week of July 11-15. Demolition of the three-story building occurred this week.

Dust Particulate Results
Dust Particulate Sampling Location 1 - Pleasant Street Gate

Readings are recorded as micrograms per cubic meter (µg/m3)

Time Monday,
7/11
Tuesday,
7/12
Wednesday,
7/14
Thursday,
7/14
Friday,
7/15
8:30 A.M. 0.000 0.060 0.059 0.078 0.127
9:30 A.M. 0.000 0.061 0.063 0.097 0.110
10:30 A.M. 0.000 0.060 0.270 0.094 0.097
11:30 A.M. 0.000 0.058 0.272 0.095 0.086
12:30 P.M. 0.000 0.059 0.067 - 0.083
1:30 P.M. 0.000 0.058 0.065 - 0.083
2:30 P.M. 0.000 0.057 0.071 - 0.275
3:30 P.M. 0.000 Battery died Battery died 0.082  
           
Average 0.000 No reading* No reading 0.094 0.102
Maximum 0.057 No reading No reading 0.361 0.350
* - Average Value is calculated at the end of the day. A reading was not possible due to battery power loss.
 
Dust Particulate Sampling Location 2 - Site Fence at East End of Church Street

Readings are recorded as micrograms per cubic meter (µg/m3)

Time Monday,
7/11
Tuesday,
7/12
Wednesday,
7/14
Thursday,
7/14
Friday,
7/15
8:45 A.M. 0.003 0.000 0.035 0.033 0.015
9:30 A.M. 0.005 0.000 0.063 0.046 0.004
10:30 A.M. 0.006 0.000 0.000 0.026 0.013
11:45 A.M. 0.006 0.000 0.032 0.020 0.023
12:30 P.M. 0.015 0.000 0.239 0.016 0.139
1:30 P.M. 0.019 0.057 0.000 0.029 0.135
2:30 P.M. 0.025 0.007 0.272 0.034 0.129
3:12 P.M. 0.027 0.046 0.003   0.132
           
Average 0.009 0.004 0.010 0.026 0.071
Maximum 0.096 1.086 5.97 0.117 5.839
 
Dust Particulate Sampling Location 3 - Site Fence at Bike Path/Tripp Street

Readings are recorded as micrograms per cubic meter (µg/m3)

Time Monday,
7/11
Tuesday,
7/12
Wednesday,
7/14
Thursday,
7/14
Friday,
7/15
8:45 A.M.   0.009 0.000 0.141 0.273
9:45 A.M. 0.000 0.000 0.000 0.042 0.011
10:45 A.M. 0.000 0.000 0.000 0.046 0.015
11:45 A.M. 0.006 0.038 0.000 0.026 0.176
12:45 P.M. 0.008 0.000 0.000 0.005 0.140
1:45 P.M. 0.021 0.000 0.000 0.000 0.100
2:30 P.M. 0.030 0.000 0.000 0.447 0.091
3:15 P.M. 0.034 0.647 0.053   0.100
           
Average 0.034 0.004 0.000 0.048 0.068
Maximum 13.10 2.501 1.020 1.339 0.920
 
Dust Particulate Sampling Location 4 - Site Fence at Bike Path/Adams Street

Readings are recorded as micrograms per cubic meter (µg/m3)

Time Monday,
7/11
Tuesday,
7/12
Wednesday,
7/14
Thursday,
7/14
Friday,
7/15
8:35 A.M. 2.602 7.306 0.000 0.085 0.008
9:35 A.M. 1.078 4.203 0.003 0.019 0.017
10:35 A.M. 2.854 0.000 0.000 0.011 0.020
11:35 A.M. 1.314 0.000 0.000 0.016 0.075
12:35 P.M. 1.073 0.000 0.000 0.081 0.065
1:35 P.M. 1.604 0.000 0.000 0.014 0.037
2:35 P.M. 1.649 0.000 0.000 0.038  
3:15 P.M. 0.000 0.000 0.006   0.061
           
Average 1.806 0.969 0.000 0.020 0.032
Maximum 7.761 9.714 0.079 0.824 0.537
 
Samples for dust particulate were also taken in the neighborhood on July 14, 2005 at approximately 1:30 P.M. Results are shown below.

Readings are recorded as micrograms per cubic meter (µg/m3)

Sampling Location 85 Pleasant St. 2 Adams St. 97 Center St @ Adams St. 32 Adams At. @ Washington 70 Church St. @ Pleasant St.
Value 0.049 0.050 0.053 0.030 0.038