Waste Site Cleanup & Reuse in New England
Atlas Tack Corporation Superfund Site
Weekly Demolition/Cleanup Activities Update
« Back to Atlas Tack Superfund Site Fact Sheet
Projected Activities for the Week of August 8 -- August 12
- Complete preparation of boiler building for demolition
- Complete asbestos removal in the boiler building.
- Complete high pressure washing of boiler building interior
- Complete segregation / load out of demolition debris from 3-story building
- Remove boiler ash from boiler & stack
- Mobilize equipment for demolition of the boiler building
Activities Performed During the Week of August 1 -- August 5
- Continued preparation of boiler building for demolition
- Continued asbestos removal in the boiler building.
- Continued high pressure washing of boiler building interior
- Continued segregation / load out of demolition debris from 3-story building
- Continued transportation & disposal of debris off site
- Prep for boiler ash removal & disposal
Air Monitoring Information
Charter Environmental and Axiom, Inc. continue to monitor the four sampling locations during the 8 -hour day for dust particulate and asbestos.
The four perimeter sampling stations are set up in the following locations:
Station 1 -- Site fence gate on Pleasant Street
Station 2 -- Site fence on east end of Church Street
Station 3 -- Site fence on bike path at Tripp Street
Station 4 -- Site fence at bike path near Adams Street
The dust particulate and asbestos sampling results recorded at each station every hour in a monitoring log. These results are compared to the action levels established for each parameter. These action levels are concentrations at which it is deemed unsafe and work would have to stop.
Results of the air monitoring data has shown that exposure of unsafe conditions to workers in the exclusion zone and to the public is well below the actions levels.
Dust Particulate Monitoring -- The National Ambient Air Quality standard for particulates is 150 micrograms per cubic meter (µg/m3) over an average of 24 hours. This value will be used, however, for a one hour period. Heavy metal presence is factored into determination of this action level. The average levels recorded at these locations range from 0 to 0.244 (µg/m3), with most readings valued at zero. The maximum level for this week is also recorded and ranges from 0 to 5.598 (µg/m3).
Asbestos Monitoring - Asbestos monitoring is conducted on a continuous basis as well. Readings are taken and recorded every hour. The personal space for asbestos workers is also monitored continuously.
The action level for asbestos is 0.010 fibers per cubic centimeter (f/cc). Average readings range from 0 to 0.004 f/cc, well below the action level. Most readings were non-detectable. Samples from each location are also taken into the trailer for microscopic readings to verify the data.
Actual Data - Below are tables showing the average and maximum dust particulate and asbestos readings taken at each sampling location during the week of July 25-July 29.
Dust
Particulate Results |
|||||
Dust
Particulate Sampling Location 1 - Pleasant Street
Gate |
|||||
Readings are recorded as micrograms per cubic meter (µg/m3) |
|||||
| Time | Monday, 7/25 |
Tuesday, 7/26 |
Wednesday, 7/27 |
Thursday, 7/28 |
Friday, 7/29 |
| Average | 0.064 | 0.222 | 0.244 | 0.233 | 0.180 |
| Maximum | 0.081 | 2.020 | 0.936 | 3.370 | 1.232 |
Dust
Particulate Sampling Location 2 - Site Fence at
East End of Church Street |
|||||
Readings are recorded as micrograms per cubic meter (µg/m3) |
|||||
| Time | Monday, 7/25 |
Tuesday, 7/26 |
Wednesday, 7/27 |
Thursday, 7/28 |
Friday, 7/29 |
| Average | 0.042 | 0.019 | 0.008 | 0.009 | 0.006 |
| Maximum | 0.803 | 0.494 | 0.746 | 0.347 | 1.122 |
Dust
Particulate Sampling Location 3 - Site Fence at
Bike Path/Tripp Street |
|||||
Readings are recorded as micrograms per cubic meter (µg/m3) |
|||||
| Time | Monday, 7/25 |
Tuesday, 7/26 |
Wednesday, 7/27 |
Thursday, 7/28 |
Friday, 7/29 |
| Average | 0.164 | 0.134 | 0.238 | 0.001 | 0.071 |
| Maximum | 4.122 | 5.598 | 1.648 | 0.760 | 1.485 |
Dust
Particulate Sampling Location 4 - Site Fence at
Bike Path/Adams Street |
|||||
Readings are recorded as micrograms per cubic meter (µg/m3) |
|||||
| Time | Monday, 7/25 |
Tuesday, 7/26 |
Wednesday, 7/27 |
Thursday, 7/28 |
Friday, 7/29 |
| Average | 0.049 | 0.042 | 0.044 | 0.000 | 0.001 |
| Maximum | 2.434 | 0.147 | 0.382 | 0.292 | 0.175 |
Asbestos Results |
|||||
Asbestos Sampling
Location 1 - Pleasant Street Gate |
|||||
| Time | Monday, 7/25 |
Tuesday, 7/26 |
Wednesday, 7/27 |
Thursday, 7/28 |
Friday, 7/29 |
| Average | 0.002 | 0.001 | 0.002 | 0.002 | 0.002 |
| Maximum | 0.002 | 0.002 | 0.002 | 0.002 | 0.002 |
Asbestos Sampling
Location 2 - Site Fence at East End of Church Street |
|||||
| Time | Monday, 7/25 |
Tuesday, 7/26 |
Wednesday, 7/27 |
Thursday, 7/28 |
Friday, 7/29 |
| Average | 0.001 | 0.001 | 0.001 | 0.001 | 0.002 |
| Maximum | 0.001 | 0.001 | 0.001 | 0.001 | 0.002 |
Asbestos Sampling
Location 3 - Site Fence at Bike Path/Tripp Street |
|||||
| Time | Monday, 7/25 |
Tuesday, 7/26 |
Wednesday, 7/27 |
Thursday, 7/28 |
Friday, 7/29 |
| Average | 0.004 | 0.003 | 0.003 | 0.003 | 0.003 |
| Maximum | 0.004 | 0.003 | 0.003 | 0.003 | 0.003 |
Asbestos Sampling
Location 4 - Site Fence at Bike Path/Adams Street |
|||||
| Time | Monday, 7/25 |
Tuesday, 7/26 |
Wednesday, 7/27 |
Thursday, 7/28 |
Friday, 7/29 |
| Average | 0.001 | 0.004 | 0.003 | 0.002 | 0.002 |
| Maximum | 0.001 | 0.004 | 0.003 | 0.002 | 0.002 |