Projected Activities for the Week of August 8 -- August 12

  • Complete preparation of boiler building for demolition
  • Complete asbestos removal in the boiler building.
  • Complete high pressure washing of boiler building interior
  • Complete segregation / load out of demolition debris from 3-story building
  • Remove boiler ash from boiler & stack
  • Mobilize equipment for demolition of the boiler building

Activities Performed During the Week of August 1 -- August 5

  • Continued preparation of boiler building for demolition
  • Continued asbestos removal in the boiler building.
  • Continued high pressure washing of boiler building interior
  • Continued segregation / load out of demolition debris from 3-story building
  • Continued transportation & disposal of debris off site
  • Prep for boiler ash removal & disposal

Air Monitoring Information

Charter Environmental and Axiom, Inc. continue to monitor the four sampling locations during the 8 -hour day for dust particulate and asbestos.

The four perimeter sampling stations are set up in the following locations:

Station 1 -- Site fence gate on Pleasant Street
Station 2 -- Site fence on east end of Church Street
Station 3 -- Site fence on bike path at Tripp Street
Station 4 -- Site fence at bike path near Adams Street

The dust particulate and asbestos sampling results recorded at each station every hour in a monitoring log. These results are compared to the action levels established for each parameter. These action levels are concentrations at which it is deemed unsafe and work would have to stop.

Results of the air monitoring data has shown that exposure of unsafe conditions to workers in the exclusion zone and to the public is well below the actions levels.

Dust Particulate Monitoring -- The National Ambient Air Quality standard for particulates is 150 micrograms per cubic meter (µg/m3) over an average of 24 hours. This value will be used, however, for a one hour period. Heavy metal presence is factored into determination of this action level. The average levels recorded at these locations range from 0 to 0.244 (µg/m3), with most readings valued at zero. The maximum level for this week is also recorded and ranges from 0 to 5.598 (µg/m3).

Asbestos Monitoring - Asbestos monitoring is conducted on a continuous basis as well. Readings are taken and recorded every hour. The personal space for asbestos workers is also monitored continuously.

The action level for asbestos is 0.010 fibers per cubic centimeter (f/cc). Average readings range from 0 to 0.004 f/cc, well below the action level. Most readings were non-detectable. Samples from each location are also taken into the trailer for microscopic readings to verify the data.

Actual Data - Below are tables showing the average and maximum dust particulate and asbestos readings taken at each sampling location during the week of July 25-July 29.

Dust Particulate Results
Dust Particulate Sampling Location 1 - Pleasant Street Gate

Readings are recorded as micrograms per cubic meter (µg/m3)

Time Monday,
7/25
Tuesday,
7/26
Wednesday,
7/27
Thursday,
7/28
Friday,
7/29
Average 0.064 0.222 0.244 0.233 0.180
Maximum 0.081 2.020 0.936 3.370 1.232
 
Dust Particulate Sampling Location 2 - Site Fence at East End of Church Street

Readings are recorded as micrograms per cubic meter (µg/m3)

Time Monday,
7/25
Tuesday,
7/26
Wednesday,
7/27
Thursday,
7/28
Friday,
7/29
Average 0.042 0.019 0.008 0.009 0.006
Maximum 0.803 0.494 0.746 0.347 1.122
 
Dust Particulate Sampling Location 3 - Site Fence at Bike Path/Tripp Street

Readings are recorded as micrograms per cubic meter (µg/m3)

Time Monday,
7/25
Tuesday,
7/26
Wednesday,
7/27
Thursday,
7/28
Friday,
7/29
Average 0.164 0.134 0.238 0.001 0.071
Maximum 4.122 5.598 1.648 0.760 1.485
 
Dust Particulate Sampling Location 4 - Site Fence at Bike Path/Adams Street

Readings are recorded as micrograms per cubic meter (µg/m3)

Time Monday,
7/25
Tuesday,
7/26
Wednesday,
7/27
Thursday,
7/28
Friday,
7/29
Average 0.049 0.042 0.044 0.000 0.001
Maximum 2.434 0.147 0.382 0.292 0.175

 

Asbestos Results
Asbestos Sampling Location 1 - Pleasant Street Gate
Time Monday,
7/25
Tuesday,
7/26
Wednesday,
7/27
Thursday,
7/28
Friday,
7/29
Average 0.002 0.001 0.002 0.002 0.002
Maximum 0.002 0.002 0.002 0.002 0.002
 
Asbestos Sampling Location 2 - Site Fence at East End of Church Street
Time Monday,
7/25
Tuesday,
7/26
Wednesday,
7/27
Thursday,
7/28
Friday,
7/29
Average 0.001 0.001 0.001 0.001 0.002
Maximum 0.001 0.001 0.001 0.001 0.002
 
Asbestos Sampling Location 3 - Site Fence at Bike Path/Tripp Street
Time Monday,
7/25
Tuesday,
7/26
Wednesday,
7/27
Thursday,
7/28
Friday,
7/29
Average 0.004 0.003 0.003 0.003 0.003
Maximum 0.004 0.003 0.003 0.003 0.003
 
Asbestos Sampling Location 4 - Site Fence at Bike Path/Adams Street
Time Monday,
7/25
Tuesday,
7/26
Wednesday,
7/27
Thursday,
7/28
Friday,
7/29
Average 0.001 0.004 0.003 0.002 0.002
Maximum 0.001 0.004 0.003 0.002 0.002